HomeMy WebLinkAbout20190918 Ver 1_Permit Plans_20190710W
0
See Street 1-A For Index of Streets
See Street 18 For Conventlonol Symbols
sat
I` \ onole So `135
, 1135 Prentiss
1138 1131 1122
Skeenah \ 1136 Union \�---�
\ ell Don a 1174
Stamey Mountain Rc. �n ry 1135
1134 AA din ton Mill 1122
BEGIN �-' 1127 \
1128 PROJECT Skeaoah
rr 6 1122 c
ENO b
PROJECT 9 �Py o 1113
128 ¢
1124
1124.--
r
I I
1
VICINITY MAP NTS
OFF -SITE DETOUR
STATE OF NORTH
FNO$THCARO'INA N.C.17BP.14.R.112
DIVISION OF HIGHWAYS
17BP.14.R.112
17BP.14.R.112
17BP.14.R.112
MA CON COUNTY
LOCATION: BRIDGE NO 223 ON SR 1134 OVER SOUTH FORK OF SKEENAH CREEK
TYPE OF WORK: GRADING, PAVING, DRAINAGE, SIGNING, AND STRUCTURE
x
a
ti
w
m
NCDOT CONTACT:
N
JOSH DEYTON, PE
HIGHWAY DIVISION 14
n
BRIDGE MANAGER
N
0
8 BEGIN BRIDGE
pis ` -L- Sta. 11+81.38
�o
TO SR 1128
RD
LEND CONSTRUCTION & WW
17BP.14.R.112
-L- Sta. 13+20.00
END PROJECT 17BP.14.R.112
-L- Sta. 12 + 75.00
U
20
GRAPHIC SCALES
10 0 20 40
DESIGN DATA
ADT 2008 200
ADT
PROJECT LENGTH
vrepar°e In tre o lea:
® THE LOUIS BERGER GROUP, Inc.
1001 d. A--., S°°e 40D
RaleU—NCaroline 2]605
Llcenae N°.: F-0840
HYDRAULICS ENGINEER„, ^ •.,,,
a4y�v
_ j'a
SEAL •
W.fw D. R.F.a. III 032134
DIVISION OF HIGHWAYS
STATE OF NORTH CAROLINA
PLANS
DHV = %
D = %
LENGTH ROADWAY PROJECT 0.029 MILES
—
zez snama]m sracmrcarroxs
oro n
,/:/z°.: '•4rFR ._pe�.a`,,.•'`
Pam"":,,,,,R,,,.•••
luxes
O4
U
20
10 0 20 40
PROFILE (HORIZONTAL)
2 0 4 8
T = %
V = 25 MPH
* TTST = DUAL
FUNC CLASS =
LOCAL
LENGTH STRUCTURES PROJECT = 0.009 MILES
TOTAL LENGTH PROJECT 0.038 MILES
RIGHT OF WAY DATE,
JUNE 16 2014
DEAN D. HATFIELD. PE
,::
ROADWAY DESIGN ,, tH r4kq"'•
ENGINEER ."'dEss;o.', ,"'•;i
37972
g 6 //E t`.`,5
'•,
>'Rolscr axc]wsFrt
WILLIAM E. TILLIT, PE
LETTING DATE.
rno� nss cx eNc xasx
PROFILE (VERTICAL)
SUBREGIONAL TIER
a/sRoss �qM E.
"
STATE OF NORTH CARO1LINA
]DIVISION OF ]HIGHWAYS
INDEX OF SHEETS
INDEX OF SHEETS GENERAL NOTES
SHEET NUMBER SHEET GENERAL NOTES: 2012 SPECIFICATIONS
EFFECTIVE: 01-17-12
t TITLE SHEET REVISED: 11/01/11
GRADING AND SURFACING OR RESURFACING AND WIDENING:
1-A INDEX OF SHEETS. GENERAL NOTES. AND LIST OF THE GRADE LINES SHOWN DENOTE THE FINISHED ELEVATION OF THE PROPOSED
STANDARD DRAWINGS SURFACING AT GRADE POINTS SHOWN ON THE TYPICAL SECTIONS. WHERE NO GRADE LINES
ARE SHOWN. THE PROFILES SHOWN DENOTE THE TOP ELEVATION OF THE EXISTING PAVEMENT
1-B CONVENTIONAL SYMBOLS ALONG THE CENTER LINE OF SURVEY ON WHICH THE PROPOSED RESURFACING WILL BE
PLACED. GRADE LINES MAY BE ADJUSTED BY THE ENGINEER IN ORDER TO SECURE A
PROPER TIE-IN.
1-C SURVEY CONTROL CLEARING:
2 PAVEMENT SCHEDULE, TYPICAL SECTIONS. AND METHOD
EARING ON THIS PROJECT SHALL BE PERFORMED TO THE LIMITS ESTABLISHED BY
WEUG ING DETAILS 11.
2-A ROCK VANE DETAIL SUPERELEVATION:
ALL CURVES ON THIS PROJECT SHALL BE SUPERELEVATED IN ACCORDANCE WITH STD.
NO. 225.04 USING THE RATE OF REVOLVED
ABOUT THE AND ON
SHOWN ON THE PLANS.
3-A SUMMARIES OF EARTHWORK 8 GUARDRAIL SUPERELEVATION IS TO BE REVDL VED ABOUT THE GRADE POINTS SHOWN ON THE TYPICAL
SECTIONS.
4 PLAN SHEET SHOULDER CONSTRUCTION:
5 PROFILE SHEET ASPHALT. EARTH, AND CONCRETE SHOULDER CONSTRUCTION ON THE HIGH SIDE OF
SUPERELEVATED CURVES SHALL BE IN ACCORDANCE WITH STO. NO. 560.01.
TMP-1 THRU TMP-5 TRAFFIC CONTROL PLANS SIDE ROADS:
NV
PMP-1 PAVEMENT MARKING PLANS THE CONTRACTOR
WLL BE REQUIRED TO DO ALL NECESSARY WORK TO PROVIDE
SUITABLE CONNECTIONS WITH ALL ROADS. STREETS. AND DRIVES ENTERING THIS PROJECT.
THIS WORK WILL BE PAID FOR AT THE CONTRACT UNIT PRICE FOR THE PARTICULAR ITEMS
EC-1 THRU EC-2 EROSION CONTROL PLANS IOLVED.
GUARDRAIL:
RF-1 THRU RF REFORESTATION PLANS
THE GUARDRAIL LOCATIONS SHOWN ON THE PLANS MAY BE ADJUSTED DURING
X-1 THRU X-5 CROSS -SECTIONS CONSTRUCTION AS DIRECTED BY THE ENGINEER. THE CONTRACTOR SHOULD CONSULT
WITH THE ENGINEER PRIOR TO ORDERING GUARDRAIL MATERIAL.
S-1 THRU S-14 STRUCTURE PLANS TEMPORARY SHORING:
SHORING REQUIRED FOR THE MAINTENANCE OF TRAFFIC WILL BE PAID FOR AS "EXTRA
WORK" IN ACCORDANCE WITH SECTION 104-7.
END BENTS:
THE ENGINEER SHALL CHECK THE STRUCTURE END RENT PLANS. DETAILS. AND CROSS-
SELTION PRIOR TO SETTING OF THE SLOPE STAKES FOR THE EMBANKMENT OR EXCAVATION
APPROACHING A BRIDGE.
UTILITIES:
ANY RELOCATION OF EXISTING UTILITIES WILL BE ACCOMPLISHED BY OTHERS.
RIGHT-OF-WAY MARKERS:
L RIGHT-OF-WAY MARKERS ON THIS PROJECT SHALL BE PLACED BY CONTRACT IN
ACCORDANCE WITH SECTION 601 OF THE 2_ NORTH CAROLINA STANDARD SPECIFICATIONS
FOR ROADS AND STRUCTURES.
EN -MR
"�N
9.r;R
.E"�sY1LLs
REGIRTERED ENGINEER
RWPi, M�is
REG—RED ENGINEER
ROADWAY ENGLISH STANDARD DRAWINGS
2012 ROADWAY ENGLISH STANDARD DRAWINGS
TM1e follow',, Roadway Standards a appear in "Roadway Standard Draw IT,," Highway Des iqn BrancIT -
N. C. Department of Transportation - Raleigh. N. C., Datdd January. 2012 are applicable to tiffs project
and by reference hereby are considered a part of tiles. plans:
STD.NO. TITLE
DIVISIDN 2 - EARTHWORK
200. G2 MetM1otl of Clearing - McMotl II
225.02 Cui de for Grading Sub9rade - Secondary and Local
225. 04 M.tM1Otl of Obtaining Super.I ..tion Lan. Pavement
DIVISIDN 5 - SUBGRADE. BASES AND SHOULDERS
560. 01 MetM1otl of SM1oulI., Construction - NLgh Sid, o Super. I ... t Curve - Meth,d I
DIVISION B - INCIDENTALS
B62. 01 Guardrail Plaoement
162.02 Guardrail Installation
862.03 Structure An.,_ Units
B66. 02 Woven Wire Fence - IT Wood Post
E76.04 Drainage Di_h_ with Class 'B' Rip Rap
® THE LOUTS BERGER GROUP, Inc
1001—AX,—RRG0
C T �
Note. Not to Scale
*S. U.E. = Subsurface Utility Engineering
BOUNDARIES AND PROPERTY.•
State Line
-••••—••••-
County Line
Township Line
City Line
Reservation Line
- -
Property Line
Existing Iron Pin
Property Corner
Property Monument
0
Parcel/Sequence Number
is
Existing Fence Linex-
Proposed Woven Wire Fence
Proposed Chain Link Fence
e
Proposed Barbed Wire Fence
A
Existing Wetland Boundary
----•�----
Proposed Wetland Boundary
•�
Existing Endangered Animal Boundary
Existing Endangered Plant Boundary
an
Known Soil Contamination: Area or Site
-X--
Potential Soil Contamination: Area or Site
-=—
BUILDINGS AND OTHER CULTURE:
Gas Pump Vent or UAG Tank Cap
O
Sign
Well
9
Small Mine
R
Foundation
0
Area Outline
0
Cemetery
0
Building
School
Church
Dom
HYDROLOGY.•
Stream or Body of Water
Hydro, Pool or Reservoir
r ---]
Jurisdictional Stream
2s -
Buffer Zone 1
az i
Buffer Zone 2
az 2
Flow Arrow
-
Disappearing Stream
-
Spring
p----; —
Wetland
Proposed Lateral, Tail, Head Ditch
_
False Sump
STATE OF NORTH CAROILINA
DIVISION OF HIGHWAYS
CONVENTIONAL PLAN SHEET SYMBOLS
RAILROADS. -
Standard Gauge
RR Signal Milepost
w
Switch
0�
RR Abandoned -
- - -
RR Dismantled
—
RIGHT OF WAY -
Baseline Control Point
Existing Right of Way Marker
0
Existing Right of Way Line
Proposed Right of Way Line
�—
Proposed Right of Way Line with
Iron Pin and Cap Marker
Proposed Right of Way Line with
Concrete or Granite Marker
Existing Control of Access
Proposed Control of Access
Existing Easement Line
E
Proposed Temporary Construction Easement-
E
Proposed Temporary Drainage Easement—
TDE
Proposed Permanent Drainage Easement—
PDE
Proposed Permanent Drainage /Utility Easement
—DUE —
Proposed Permanent Utility Easement
PUE
Proposed Temporary Utility Easement
TUE
Proposed Aerial Utility Easement
AUE
Proposed Permanent Easement with
Iron Pin and Cap Marker
ROADS AND RELATED FEATURES.
Existing Edge of Pavement -
Existing Curb -
Proposed Slope Stakes Cut
Proposed Slope Stakes Fill
Proposed Curb Ramp
Existing Metal Guardrail
Proposed Guardrail
Existing Cable Guiderail
Proposed Cable Guiderail
Equality Symbol
Pavement Removal
VEGETATION:
Single Tree
Single Shrub
Hedge
Woods Line
0
&-__
--- Designated
F_
cR TELEPHONE:
Existing Tel
T T T Proposed
Telephone
Telephone
Telephone
® Telephone
UIG Telep
Recorded
Orchard Q Q Q Q
Vineyard 0
EXISTING STRUCTURES.-
MAJOR:
Bridge, Tunnel or Box Culvert 0
Bridge Wing Wall, Head Wall and End Wall - coxc ww
MINOR:
Head and End Wall /-c-oNc-H-w\
Pipe Culvert
Footbridge N---------<
Drainage Box: Catch Basin, DI or JB ❑ca
Paved Ditch Gutter -----
Storm Sewer Manhole
Storm Sewer
UTILITIES:
POWER:
Existing Power Pole
Proposed Power Pole b
Existing Joint Use Pole
Proposed Join} Use Pole
Power Manhole O
Power Line Tower
Power Transformer B
U,G Power Cable Hand Hole
H-Frome Pole ••
Recorded U/G Power Line
U,G Power Line (S.U.E.*)----^----
ephone Pole +
Telephone Pole -0-
Manhole 8
Booth 0
Pedestal IT]
Cell Tower
hone Cable Hand Hole LJ
lkG Telephone Cable T
Designated 1- Telephone Cable (S.U.E.*)- ----
Recorded UG Telephone Conduit
Designated UG Telephone Conduit(S.U.E.")- ----*_----
Recorded UAG Fiber Optics Cable
Designated UIG Fiber Optics Cable (S.U.E.")- ---- ----
WATER:
Water Manhole
Water Meter o
Water Valve
Water Hydrant .0
Recorded U/G Water Line UL Designated G Water Line (S.U.E.*)
Above Ground Water Line
TV:TVSatellite
Dish
CC
TV Pedestal
TVTower
U,G TV Cable Hand Hole
9
Recorded lLG TV Cable
Designated USG TV Cable (S.U.E..*)
Recorded U/G Fiber Optic Cable
Designated UG Fiber Optic Cable (S.U.E.*)--
GAS:
Gas Valve 0
Gas Meter
Recorded U/G Gas Line
Designated UG Gas Line (S.U.E.*)----_----
Above Ground Gas Line
SANITARY SEWER:
Sanitary Sewer Manhole
Sanitary Sewer Cleanout
UG Sanitary Sewer Line s
Above Ground Sanitary Sewer
Recorded SS Forced Main Line —
Designated SS Forced Main Line (S.U.E.*) -----�.----
MISCELLANEOUS:
Utility Pole
Utility Pole with Base
0
Utility Located Object
o
Utility Traffic Signal Box
p
Utility Unknown U/G Line
.�
U,G Tank; Water, Gas, Oil
O
Underground Storage Tank, Approx. Loc. —
ups.`
AG Tank; Water, Gas, Oil
O
Geoenvironmental Boring
UIG Test Hole (S.U.E.*)
T
Abandoned According to Utility Records
AATUR
End of Information
E.O.I.
0
i 4
M, S'll No.
ROADWAY DESIGN HYDRAURICS
DETAIL A DETAIL B DRDIN 'NOIN
LATERAL BA E DITCH STANDARDBASE DITCH ........ .. ..GARO,.
(NI I S—) INe/mS"' R
N-1 s
Nu
D
G- "BISES
— 2
D- S R. Min.
lmlvllll INGIN'll
T T U ... C.i,FiI--ffi.g
FROM kSrA.12+30TO kSrA.12+80 LT FROM 4- STK �2 +13 TO STA. 12 T 30 LT
FROM — sm 2, 80 TO STA.13,10 ET
NN I"
I IT,
EM -1 ELEV-2114.1�' off
-BL- STA. E+20.1I 3.22' ITT
A ;NAIL'DEL MAPLE "OT." L IN ROOT OF 12
----------
S,s
0
BEGIN BRIDGE =Gll SASE IRCH
STAMEY kLYRESEI 11 SY CUR R.El —No
DO H-IS PG EST C ROC SEE B LOS
DETOL SHEET
DE _
—'l TONS RCU 'IS
EST SY FAS
EASE DITO
FIT DCTA.L;1�1
.R ' L 12LLE DITCH S ING
EU: 119� �
45.00 R 30 SY COl'E MEET —PRO T. I DOE
COIR FIIIR
PDE
SODO I PDE
C NAIL G
F 'AU
_9 . P, C
F
a P L-2 GRAD
0
0*
G LEDFORD G;RAGRAD350
PG -,,C E rL fp"-4
ED NOT
OIL, FENCE 8
YP. RESREEF E ENCE " END CONSTRUCTION R,* 17BPJ4.RJ12
FPC Sta. 12+32.91 -L- Sla. IJf2OM
IPRalECT 17BPJ4 BEGIN PROJECT ITBPJ4.RJ]2 DB'O-13 PG 06
-L- Sta. 1If2000 ELD BRIDGE
/ -L- tD.l + 3END
// V/4 FRANE VASHENORN IONNM� WDC41S -L- Sfo. 12+75.MOO.RJ12
DIS D-1 PG .1 1
DIS 1-1 PG .1
DETAIL SHOWING BRIDGE/PAVEMENT RELATIONSHIP
TYPE III TYPE 111 0
IS 4
ME&
TTTT T
0 0 0 /
o
CURVE DATA FOR -L-
P/ sta 13W961
TYPE III TYPE III A 42l2'000'(LT)
D = 26301 000'
APPROACH SLAB L 165,0
--L- Sta.11+70JB APPROACH SLAB T = W70'
-L- Sta.12*39.63 R = 224"
Ro 641 SEE SHEET 5 FOR PROFILE
SEE SHEETS S-ITHRU S-14 FOR STRUCTURE PLANS Se = EXIST. 6'OEP' Inc. uu
Daelepn�NO—
IC 21
THE LOUIS BERGER GROUP, Inc.
OJEGT REFERENCE
PR 4BP✓4.R.112No.
sNs
5
®
1001 Wade Avenue, Suite 400
ao.ow.. oEsw
moRauucs
Raleigh, North Carolina 27605
E
ENlH
0
2� 0 8
9
®
+0
®
•`•"fEssinp�:? ";"Essp.
awn
s
"g
WzoHr
mlu"
`'•ANC„E{, (s+tUss
REGISTERED ENGINEER
:•
fR"e
REGISTERED ENGR4EER
IEIEIE-
HYDRAULIC
DATA
DESIGN DISCHARGE - 700 CFS
DESIGN FREQUENCY - 25 YRS
DESIGN MY ELEVATION = 2/021i FT
BASE DISCHARGE = 1000 CFS
BASE FREGUENCY = l00 YRS
BASE HW ELEVATION = 2103J7 FT
OVERTOPPING DISCHARGE = 1460 CFS
OVERTOPPING FREQUENCY- 50' YRS
OVERTOPPING ELEVATION = 2"" FT
DATE OF SURVEY = AUGUST 2013
:.
l S.EDATE LEVATIOFON
T
SURVEY
= ..I
FT
Pl = 11+65DO
EL2,114 = 2J04.42'
±EHPI
VC/ = 25'
= 12+65D0
-
-
HH
KI = l5
VC2 - 4Q
EL = 2J05A2'
K2 - 37
- 50'
D GRADI
2,110
DS = 20 ,VPH
OS =�
L-
'A l
+75D0
,�IPH
L =
J05
5'
D G
ADE
MA
XIST
NG 6
M
/
E 6102-5
ST
T
5+
!l
2
FT
CL
SS
RIP
RAP
1_
2
CLISS
-R
A / /
D
D 5
k,2,094
��
!9
4
/
_
43/TLH
ND
TAN
D
R
N
11-L-
Bf
STMDARD
ST4
BASf
DITCH
EGl
LAT
RAL]kA14
D/T
H
dW
L=
SEE SHEET 4 FOR PLAN
10 11
12
13
14
11+50-1.8000+1,0 11+75
PI = 11+65.00
EL = 2,104.42'
VC, = 25.00'
VC.= 40.00,
FILL FACE 0 END BENT 1
2110 STA. 11+81.38 -L-
GRADE PT. EL. 2,104.66
BEGIN FRONT SLOPE
STAD_ ------------ -----
GRADE PT. . 90 -L
PT. EL. 2104.65 —
1100 LOW CHORD (J�
ND BENT 1
12+25
UNCLASSIFIED 1'-7'MIN. BERM STA. 12+28.63 -L-
STRUCTURE NORMAL TO CAP GRADE PT. EL. 2105.06
EXCAVATION (TYP.) 100 YR. BEGIN FRONT SLOPE
WATER SURFACE
EL. 2104.0t EL 21032 t STA.12+32.70 -L-
EL. 2102.20 III
HP 12 X 53 STEEL I EL.209�
PILES (TYP.) fff
CLASS II
RIP RAP
(TYP.)
3'-6'MIN.
EARTH BERM
NORMAL TO CAP
END BENT 1
I
12+50
+1.000O/ +1. 500%
PI = 12+65.00
EL = 2,195.42'
VC = 50'
EL. 2104.0 FIX. GRADE PT. EL. 2105.10
NORMAL WATER -- — -----
T _ SURFACE EL. 2096.7 T APPROXIMATE
(8/13) v GROUND LINE
EL. 2099.Ot
EL. 2098.0± LOW CHORD [il
END BENT 2
EL 2097.Ot------_ 'F EL. 210257
o
.52 EL. 2099.89
1'-0"MIN. UNCLASSIFIED STRUCTURE
1%vl SLOPE EXCAVATION
EL 2096.0--7 NORMAL TO CAP NORMAL TO CAP
(TYP.)
END BENT 2
SECTION ALONG -L-
(SECTION THRU END BENTS ARE TAKEN AT RIGHT ANGLES)
PLAN
(PILES NOT SHOWN FOR CLARITY)
THE MATERIAL IN THE CROSS -HATCHED AREA SHALL
BE EXCAVATED FOR A DISTANCE OF 20 FT EACH SIDE
OF CENTERLINE ROADWAY AS DIRECTED BY THE ENGINEER.
THIS WORK WILL BE PAID FOR AT THE CONTRACT LUMP
SUM PRICE FOR UNCLASSIFIED STRUCTURE EXCAVATION.
SEE SECTION 412 OF THE STANDARD SPECIFICATIONS.
FOR ADDITIONAL NOTES.SEE SHEETS S-2 AND S-3
HORIZONTAL CURVE DATA -L
^' 'T A. 13+19.61
12° 12' 00.0"(LT.)
'.5° 30'00.0"
65.49'
16.70'
!24.69'
XIST.
CT NO. 17BP°19°R°112
VACON COUNTY
ON: 12+05.00 -L-
s
0
wm�s
a n
HP 12 X 53 STEEL HP 12 X 53 STEEL
PILES (TYPJ PILES IT VPJ
P� HP 12 X 53 HP 12 X 53
STEEL PILESEEL PILES
W.P. 11 W.P. "2
STA. 11+81.38 L- i STA. 12+;
TO SR 1128 BRIDGE IDENT
STA. l2+O5.005.00 -L-
90-00,00"
(TYPJ
i
i
FILL FACE Cil
FILL FACE 0 END BENT 2
END BENT 1
1,_41�2"
END BENT No.1 END BENT No.2
FOUNDATION LAYOUT
FOUNDATION NOTES:
1. FOR PILES, SEE SECTION 450 OF THE STANDARD SPECIFICATIONS.
2. PILES AT END BENTS NO.1 & 2 ARE DESIGNED FOR A FACTORED RESISTANCE OF 70
TONS PER PILE.
3. DRIVE PILES AT END BENTS NO.1 & 2 TO A REQUIRED DRIVING RESISTANCE OF 120
TONS PER PILE.
4. TESTING PILES WITH THE PDA DURING DRIVING,RESTRIKING,OR REDRIVING MAY BE
REQUIRED. THE ENGINEER WILL DETERMINE THE NEED FOR PDA TESTING. FOR PDA
TESTING, SEE SECTION 450 OF THE STANDARD SPECIFICATIONS AND FOR PILE DRIVING
CRITERIA, SEE PILE DRIVING CRITERIA PROVISION.
TO SR 1135,
PROJECT NO. 17BPA4.R,112
MACON COUNTY
STATION:
12+05.00 -L-
X X 4 SBW
BM #1: NAIL IN ROOT OF 12" DBL MAPLE, STA. 5+20.11, 3.22' LT., ELEV. - 2114.19'
HYDRAULIC DATA
DESIGN DISCHARGE = 700 CFS
FREQUENCY OF DESIGN FLOOD = 25 YEARS
OF ION HIGH WATER ELEVATION = 2102.8
DRAINAGE AREA = 2.2 SO. MI.
BASIC DISCHARGE (0100) = 1000 CFS
BASIC HIGH WATER ELEVATION = 2103.17
OVERTOPPING FLOOD DATA
OVERTOPPING DISCHARGE = 1460 CFS
FREQUENCY OF OVERTOPPING FLOOD = 500+ YRS.
OVERTOPPING FLOOD ELEVATION = 2104.9
TO SR 1128
� �
W
PROPOSED GUARDRAIL /
(ROADWAY PAY ITEM
AND DETAIL (TYPJ —/ ,S
---------
BRIDGE IDENT.
STA. 12+05.00
blT
I Tp SR 1135
____—__---------
PROPOSED GUARDRAIL
(ROADWAY DETAIL AND -
PAY ITEM)(TYP.) ----�S
JS
—X X X X
j
IIAI
-
P00'00"
---��
I 4
BRIDGENG
B LX- Xx
�X—X—
H
CLASS II
RIP RAP
NOTE: FOR UTILITY INFORMATION, SEE UTILITY PLANS.
LOCATION SKETCH
TOTAL BTLL OF MATERTAL
END BENT NO.1
END BENT NO.2
DRAWN BY M. HOGAN DATE 2/14BY M. HOGAN DATE 2/14
CHECKED BY P.HOLSHOUSER DATE
i/14
DESIGN ENGINEER OF RECORD : P.HOLSHOUSER LATE 7/14
NOTES:
ASSUMED LIVE LOAD = HL-93 OR ALTERNATE LOADING
FOR OTHER DESIGN DATA AND GENERAL NOTES, SEE SHEET CH.
THIS BRIDGE HAS BEEN DESIGNED IN ACCORDANCE WITH THE AASHTO -RFD
BRIDGE DESIGN SPECIFICATIONS.
REMOVAL OF THE EXISTING BRIDGE SHALL BE PERFORMED SO AS NOT TO
ALLOW DEBRIS TO FALL INTO THE WATER.THE CONTRACTOR SHALL REMOVE THE
BRIDGE AND SUBMIT PLANS FOR DEMOLITION IN ACCORDANCE WITH ARTICLE 402-2
OF THE STANDARD SPECIFICATIONS.
THIS STRUCTURE HAS BEEN DESIGNED IN ACCORDANCE WITH "HEC 18
EVALUATING SCOUR AT BRIDGES."
THE SUBSTRUCTURE OF THE EXISTING BRIDGE INDICATED ON THE PLANS IS
FROM THE BEST INFORMATION AVAILABLE. SINCE THIS INFORMATION IS SHOWN FOR
THE CONVENIENCE OF THE CONTRACTOR, THE CONTRACTOR SHALL HAVE NO CLAIM
WHATSOEVER AGAINST THE DEPARTMENT OF TRANSPORTATION FOR ANY DELAYS OR
ADDITIONAL COST INCURRED BASED ON DIFFERENCES BETWEEN THE EXISTING BRIDGE
SUBSTRUCTURE SHOWN ON THE PLANS AND THE ACTUAL CONDITIONS AT THE PROJECT
SITE.
ICIFV:I:7UIdiF7[Q.Tiy r•nILI*16MEscan:W
ASPHALT WEARING SURFACE IS INCLUDED IN ROADWAY QUANTITY ON ROADWAY
PLANS.
FOR CRANE SAFETY,SEE SPECIAL PROVISIONS.
FOR SUBMITTAL OF WORKING DRAWINGS, SEE SPECIAL PROVISIONS.
FOR FALSEWORK AND FORMWORK,SEE SPECIAL PROVISIONS.
INASMUCH AS THE PAINT SYSTEM ON THE EXISTING STRUCTURAL STEEL
CONTAINS LEAD, THE CONTRACTOR'S ATTENTION IS DIRECTED TO ARTICLE 107-1 OF
THE STANDARD SPECIFICATIONS. ANY COSTS RESULTING FROM COMPLIANCE WITH
APPLICABLE STATE OR FEDERAL REGULATIONS PERTAINING TO HANDLING OF
MATERIALS CONTAINING LEAD BASED PAINT SHALL BE INCLUDED IN THE BID PRICE
FOR 'REMOVAL OF EXISTING STRUCTURE AT STATION 12+05.00 -L-."
FOR GROUT FOR STRUCTURES, SEE SPECIAL PROVISIONS.
FOR EROSION CONTROL MEASURES, SEE EROSION CONTROL PLANS.
THE EXISTING STRUCTURE CONSISTING OF 1 SPAN 0 25'-6"
WITH A CLEAR ROADWAY OF 19'-3"ON A TIMBER DECK WITH
8 LINES OF 12"I- BEAMS 0 2-7- CIS., TIMBER END BENT CAPS,
TIMBER POST & SILLS AND CONCRETE FOOTINGS 6) VARYING
CENTERS SHALL BE REMOVED.THE EXISTING BRIDGE IS
POSTED FOR LOAD LIMIT.SHOU-D THE STRUCTURAL INTEGRITY
OF THE BRIDGE DETERIORATE DURING CONSTRUCTION OF THE
PROPOSED BRIDGE, THE LOAD LIMIT MAY BE REDUCED AS FOUND
NECESSARY DURING THE LIFE OF THE PROJECT.
PROJECT NO. 17 BP,14.R,112
MACON COUNTY
STATION: 12+05.00 -L-
SHEET 3 OF 3
DEPARTMENTS OFF TRANSPORTATION
QjN EspRO(�p.
5�
GENERAL DRAWING
soer`e '
FOR BRIDGE ON SR 1134
OVER S. FORK SKEENAH CREEK
BETWEEN SR 1128 AND SR 1135
Cw4 K. Rels,.wur 3i4/zass
xo
REVISIONS
xc, B
SHEET N0.
SEE
® THELOUIS BERGER GROUP, Inc.
Rel'='NAC 2ls05.4922
Ex4.s
g
4
PLANTING DETAILS
SEEDLING / LINER BAREROOT PLANTING DETAIL
HEALING IN
1. Locate a heeling -in site m a d dy, R
protected area.
2. Excavate a Rat bottom -.6
12 inches deep end provide drainage.
YI I I
3. B.okRll the Wench with 2 inches well
tted sawdust. Place . 2 inch layer of
well rotted sawdust et a sloping .ogle
at one end of the trench.
5. PI a 2 i h — of well rotted
durst over thII
e is nna]-i.i.9
sloping ..glee
6. Repem layem of pleats end sawdust
.s necessary .od water thoroughly.
DIBBLE PLANTINGMETHOD
IUSING TBEKI I
1 �1 11 lY�l 1 D I I I 11 II li
�u u6 II nnnm ' n61 R 1 nnnnnii nllnnil ,nnnnllii
nnn°nrnnlinnt mlfn�nVp4p-n n¶ n�n��Cily=n
II�II IIAII�IIII. I ��III.�. �I II�I1LI�ll�III�IL
-
_ I
I I I
-
4. Pull handle of b S. P.h hsndlu f rward 6. Lee- aolu
urd pine r' grmiug timing eo l t P. thoroughly. PWater
oil e b
PLANTING NOTES:
PLANTING BAG
Dudng o1-6.9,edltogs
A.11 be kept in
b-to rI, -enet from dryi
ng. tAl
root systedrying.
IBC PLANTING BAR
Planting bar shall have a
blade with a triangular
d shall
be 12si has long,
4 in has wide end
1 inch Ihick ut cent-.
ROOT PRUNING
All s ishell be ro
pruned,d. iff.eeeseary, ro that
ro is ....d m m than
10 iuch- beI the
root collar.
REFORESTATION
❑ TREE REFORESTATION SHALL BE PLANTED 6 FT. TO 10 FT. ON CENTER, RANDOM SPACING,
AVERAGING 8 FT. ON CENTER, APPROXIMATELY 680 PLANTS PER ACRE.
REFORESTATION
-URR,'IYPF, SIZE, AND FIRtMSH SHALL CONFORM TO Tfl6 FOLLOWING:
25% LIRIODENDRON TULIPIFERA
TULIP POPLAR
12
in - 1S in BE
25% PIATANUS OCCIDENTALIS
SYCAMORE
12
in - 1S in BR
25% FRAXINUS PENNSYLVANICA
GREEN ASH
12
in - 1S in BR
25% BETULA NIGRA
RIVER BIRCH
12
in - 1S in BR
Reforestation
Reforestation will be planted within interchanges and along the
outside borders of the road, and in other areas as directed.
Reforestation is not shown on the plan sheets.
All non,naintained riparian buffers impacted by the placement of
temporary fill or clearing activities shall be restored to the
preconstrucfion contours and revegetated with native woody species.
The entire Reforestation operation shall comply with the requirements
of Section 1670 of the Standard Specifications.
Reforestation shall be bare root seedlings 12"-18" tall.
Reforestation shall be planted as soon as practical following
permanent Seeding and Mulching. The seedlings shall be planted in a
16-foot wide swath adjacent to mowing pattern line, or as directed.
Root dip: The roots of reforestation seedlings shall be coated with a
slurry of water, and either a fine clay (kaolin) or a superabsorbent
that is designated as a bare root dip. The type, mixture ratio,
method of application, and the time of application shall be submitted
to the Engineer for approval.
With the approval of the Engineer, seedlings may be coated before
delivery to the job or at the time of planting, but at no time shall
the roots of the seedlings be allowed to dry out. The roots shall be
moistened immediately prior to planting.
Seasonal Limitations: Reforestation shall be planted from November 15
through March 15.
Payment for Reforestation will be included in the contract bid price
for Lump Sum for Erosion Control.
REFORESTATION DETAIL SHEET
N.C.D.O.T.-ROADSIDE ENVIRONMENTAL UNIT ® 1HEL0U1SI-GERGROU1,, Inc.
pael n�IC 216�053322a
PLANTING DETAILS
LIVE STAKES PLANTING DETAIL
LIVE STAKE
SQUARE CUT
BUDS (FACING EPWARDI
LIVE CUTTING
(I/2'-2'DIAMETER)
2 3 Feet
ANGLE cur 3D•-4s
C"R FIBER MAT
LIVE STAKES
EXISTING PROPOSED
GROUND
LEXISTING/PROPOSED
STREAMBEO
BANK STABILIZATION VIITH LIVE STAKES
NOTE:
LIVE STAKES SHALL BE SPACED APPROXIMATELY 4 FEET
ON CENTER
LIVE STAKES SHALL BE DRIVEN UNTIL APPROXIMATELY 3/4
OF LIVE STAKE IS WITHIN GROUND
BAREROOT PLANTING DETAIL
DIBBLE PLANTING METHOD
USING THE KBC PLANTING BAR
rlal!
2 inch
1. Insert planriag bar 2. Remove Planting bar 3. Insert pla„f g bwr
v ehmvn end pull Handle and place seedling et 2 inches toward RIX—,
toward planter. mrrux depth. from seedling.
PLANTING NOTES:
PLANTING BAG
DN.I planting, s,dlli.g,
she716 k po i ist ,g
-i= Pr w1 the I �`
root systems from drying.
IiBC PLANTING BAR T
Planting bar shall nave a I
bpadeth a tangular ri
nd neu
be D ine,i bang,
a V II �ae a
1 inen tmrk at emter.
ROOT PRUNING '
AB s .dhnp ADA be roa W
th
prnnadfn ^d essa:y, so en
e
10 n has below the
mar caller.
❑ TYPE 1STREAMBANK REFORESTATION SHALL BE PLANTED
3 FT. TO 5 FT. ON CENTER, RANDOM SPACING, AVERAGING
4 FT. ON CENTER, APPROXIMATELY 2724 PLANTS PER
ACRE.
❑ TYPE 2 STREAMBANK REFORESTATION SHALL BE PLANTED 6 FT. TO 10 FT.
ON CENTER, RANDOM SPACING, AVERAGING 8 FT. ON CENTER,
APPROXIMATELY 680 PLANTS PER ACRE.
❑ NOTE: TYPE 1AND TYPE 2 STREAMBANK REFORESTATION SHALL BE
PAID FOR AS "STREAMBANK REFORESTATION"
STREAMBANK REFORESTATION TYPICAL
TYPE II
ITYPE I
I .rr l
STREAMBANK REFORESTATION
OWTURE,TYPE, SIZE,AND FLITII H SHALL fANFORAI TO THE FOLLOWLYG:
TYPE 1
50% SALIX NIGRA
BLACK WH,LOW
2 R - 3 R LIVE STARS
50% CORNUS AMOMUM
SH-KY DOGWOOD
2 ft - 3 R LIVE STAKES
TYPE 2
25% LIRIODENDRON TULIPIFF.RA
TULIP POPLAR
12 in - 1S I. BR
25% PIATAN'US OCCIDENTAL IS
SYCAMORE
12 in - 1S in BR
25% PRUNUS SEROTINA
BLACK CHERRY
12 in - 18 in BR
25% BETUTA NIGR ,
RIVER BIRCH
12 in - 18 in BR
❑ SEE PLAN SHEETS FOR AREAS TO BE PLANTED
STREAMBANK REFORESTATION
DETAIL SHEET 1 OF 2
® THE LOUIS BERGER GROUP, Inc.
OelepnK NO 2/80530220
DIRECTION
OF FLOW
A --. .n
1' CENTERS
ANCHOR TRENCH
MATTING ON 1' CENTERS
IN TRENCH
n uruno m,00� no
PLAN VIEW
18"
COIR FIBER (TYP)
MATTING BACKFILL
ANCHORS ON
3' CENTERS
EXTEND MATTING
TO NWSEL
ANCHORS ON
1' CENTERS
IN TRENCH
-------- 7_-------- MATTING SHALL BE
PLACED IN TRENCH
AND BACKFILLED
ANCHORS ON
STREAM BED 1' CENTERS
TYPICAL CROSS SECTION
HORS ON
CENTERS
ANCHORS ON
1' CENTERS
FLOODPLAIN/
EXISTING
GROUND
6" MIN
COIR FIBER MATTING DETAIL
NOT TO SCALE
2" x 2" (nominal)
WOODEN STAKE
1"
1-2„ V
1-2
12-24"
#10 STEEL
REINFORCEMENT BAR
4"
t24
TER BEND
4"
1" (nominal)
STAPLE
12"
ANCHOR OPTIONS
STREAMBANK REFORESTATION
DETAIL SHEET 2 OF 2
® THE LOUTS EERGER GROUP, Inc.
�LZ Nn 2,fi053322Q