HomeMy WebLinkAboutNCS000546_Permit MODIFICATION with Cover Letter_20190307ROY CooPER
Governor
MICHAEL S. REGAN
Secretary
S. DANIEL SMITH
Interim Director
Mr. Terry W. Tuck
General Manager II
Allen Steam Station
253 Plant Allen Road
Belmont, NC 28012
Dear Mr. Tuck:
NORTH CAROL.INA
Environmental Quality
March 7, 2019
Subject: NPDES Stormwater Permit
Permit No. NCS000546
Minor Modification
Allen Steam Station
Gaston County
The Division of Energy, Mineral, and Land Resources' Stormwater Program received your
request to revise permit no. NCS000546 on November 21, 2018, The Division has reviewed and
approved your request. This modification is issued pursuant to the requirements of North
Carolina General Statute 143-215.1 and the Memorandum of Agreement between North
Carolina and the U.S. Environmental Protection Agency dated October 15, 2007 (or as
subsequently amended).
This modification includes the following changes from your current permit:
a Modifications to the permit in Part Ii on pages 6-7 of 16, to include stormwater outfall
SWO15 in monitoring requirements.
0 Revisions to the permit cover page to reflect the latest amendment date.
Please replace these pages in the current permit with the revised pages and discard the
older pages.
If any parts, measurement frequencies, or sampling requirements contained in this modification
are unacceptable to you, then you have the right to file a petition for a contested case with the
Office of Administrative Hearings within thirty (30) days following receipt of this letter. This
petition must conform to the requirements of Chapter 150E of the North Carolina General
Statutes. Petitions must be timely filed with the Office of Administrative Hearings, Post Office
Drawer 11666, Raleigh, North Carolina 27604. If you do not file a petition within the required
time, the agency decision shall be final and binding.
Nrth Carolina Department of Environmental Quality I Division of Energy, Mineral and Land Resources
512 North Salisbury Street 1 1612 Mail Service center I Raleigh, North Carolina 27699-1612
NORI 1NA "
UepsNnetto cm� ac�ww'ax 919,707.9200
This permit is not transferable except after notice to the Division. Part III, B.2. addresses the
requirements to be followed in case of change in ownership or control of this discharge. This
permit modification does not affect the legal requirements to obtain other permits which may
be required by this Division, or permits required by the Division of Water Resources, Coastal
Area Management Act, or any other federal or local governmental permit that may be required.
If you have any questions or comments concerning this permit modification, contact Bethany
Georgoulias at (919) 707-3641 or at bethany.georggulias nncdenr gov.
Sincerely,
0 -N
for S. Daniel ith, Director
Division of Energy, Mineral, and Land Resources
cc: Mooresville Regional Office, DEMLR Stormwater Program
Sam Sampath, Ph.D., EPA Region IV, 61 Forsyth Street, Atlanta, GA 30303
Elizabeth Glenn, Duke Energy (via email)
Stormwater Program
encl: Amended Permit Pages
STATE OF NORTH CAROLINA
DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES
DIVISION OF ENERGY, MINERAL, AND LAND RESOURCES
PERMIT
TO DISCHARGE STORM'WATER UNDER THE
,_'U_.T_"t Lmg-toj tampumum
In compliance with the provisions of North Carolina General Statute 143-215.1, other
lawful standards and regulations promulgated and adopted by the North Carolina
Environmental Management Commission, and the Federal Water Pollution Control Act, as
amended,
is hereby authorized to discharge stormwater from a facility located at
Allen Steam Station
2S3 Plant Allen Road
Belmont, NC
Gaston County
to receiving waters designated as Catawba River and South Fork River, a class WS-V, B
stream in the Catawba River Basin, in accordance with the discharge limitations,
monitoring requirements, and other conditions set forth in Parts I, II, III, and IV hereof.
This permit shall become effective May 15, 2015.
This permit and the authorization to discharge shall expire at midnight on April 30, 2020.
Amended August 14, 2015, June 20, 2016, December 29, 2016, and March 7, 2019, signed
this 71h day of March 2019.
S. Daniel Smi , Director
Division of Energy, Mineral and Land Resources
By the Authority of the Environmental Management Commission
Permit No. NCS000546
mu, WaIRWr"Fam
v
Analytical monitoring of stormwater discharges shall be performed as specified in Tables
1-5. All analytical monitoring shall be performed during a mteasureable storm event at
the specified-stormwater discharge outfalls (SDOs) that discharge stormwater associated
with industrial activity (See Definitions).
A measurable storm event is a storm event that results in an actual discharge from the
permitted site outfall. The previous measurable storm event must have been at least 72 hours
prior. The 72-hour storm interval does not apply if the permittee is able to document that a
shorter interval is representative for local storm events during the sampling period, and the
ermittee obtains approval from the local DEMLR Regional Engineer, See Definitions.
The parameters in Table 1 shall be monitored during a measurable storm event from
Outfalls SWO01 and SWO01A (Drainage Area 1), Outfall SWO02 (Drainage Area 2), Outfall
SWO03 (Drainage Area 3), Outfall SWO05 (Drainage Area 5), Outfall SWO07 (Drainage Area
7), Outfall SWO08 (Drainage Area 8), Outfall SWO09 (Drainage Area 9), and OutfaIl SW010
(Drainage Area 10), Outfall group SWO13 (Drainage Area 13 includes nine, SWO13-7 through
SW013-15, 10" stormwater discharge outfalls along the rail line), Outfall'SWO1 (Drainage
Area 15), Outfall SWO16 (Drainage Area 16), Outfall SW020 (Drainage Area 20) discharging
to the Catawba River.
Outfalls SWO01 and SWO0'1A (Drainage Area 1) includes approximately 2,000 linear
feet of rail lines and undeveloped wooded areas upland of the rail lines,
e Outfall SWO02 (Drainage Area 2) includes approximately 1,000 linear feet of paved
road and a 2.5 acre laydown area.
e Outfall SWO03 (Drainage Area 3) includes approximately 1,500 linear feet of rail
lines.
Outfall SWO05 (Drainage Area 5) is comprised of'a gravel laydown yard and
vegetated slopes located west and upland of the limestone unloading area. The
gravel laydown yard comprises approximately 3 acres. The drainage area also
includes approximately 500 linear feet of paved roadway,
® Outfall SWO07 (Drainage Area 7) includes approximately 1,500 linear feet of rail.
lines, and 400 linear feet of gravel roadway and 400 linear feet of limestone
conveyor.
9 Outfall SWO08 (Drainage Area 8) includes approximately 2,400 linear feet of'rail
lines, and 1000 linear feet of paved road and 400 linear feet of limestone conveyor.
9 Outfall SWO09 (Drainage Area 9) includes approximately 940 linear feet of rail lines.
0 Outfall SWO10 (Drainage Area 10) includes approximately 1,280 linear feet of rail
lines.
Outfall Group SWO13 (Drainage Area 13) includes nine 10" stormwater discharge
outfalls along approximately 1700 linear feet of rail lines and gravel road.
e Outfall SWO15 (Drainage Area 15) includes a large soil borrow area, two ash
structure fill areas, and approximately a one -mile gravel and dirt road.
e Outfall SWO16 (Drainage Area 16) includes approximately 1,700 linear feet of paved
access road, 1,000 linear feet of a paved ash haul road, 700 linear feet of paved road
south of the access road, 1,000 linear feet of dirt roads and a gravel laydown and
equipment parking area north of the access road.
Part 11 Page 6 of 16
Permit No. NCS000546
Outfall SW020 (Drainage Area 20) includes approximately 1,300 linear feet of paved
access road, and an earth spoil area and a gravel construction parking area and
storage area.
Table 1. Analytical Monitoring Requirements for Outfalls SWO01 and SW001A,
SWO02, SWO03, SW005, SWO07, SW008, SWO09, SW010, Outfall Group
SWO131, SW015, SWO16, and SW020 discharging to the Catawba River
Discharge
Measurement
Sample
Sample
Characteristics
Units
Frequency1
Type2
Locations
Total Suspended Solids (TSS)
semi-annual
(quarterly, during
Grab
SDO
mg/L
coal or ash
transport onlyl
Total Rainfall4
semi-annual
(quarterly, during
Rain
inches
coal or ash
Gauge
trans ort onl
40 CFR Part 423 Appendix A:
quarterly, during
Priority pollutant Metals - Ag, As, Be,
mg/L
coal or ash
Grab
SDO
Cd, Cr, Cu, Hg, Ni, Pb, Sb, Se, Tl, Zn
transport only
Boron5
quarterly, during
mg/L
coal or ash
Grab
SDO
transport only
pH5
quarterly, during
standard
coal or ash
Grab
SDO
transport onl
Footnotes:
1 Measurement Frequency: Twice per year (unless other provisions of this permit prompt monthly
sampling) during a measureable storm event, until either another permit is issued for this facility or until
this permit is revoked or rescinded, if the facility is monitoring monthly because of Tier Two or Three
response actions under the previous permit, the facility shall continue a monthly monitoring and
reporting schedule in Tier Two or Tier Three status until relieved by the provisions of this permit or
the Division,
2 Grab samples shall be collected within the first 30 minutes of discharge. When physical separation between
outfalls prevents collecting all samples within the first 30 minutes, sampling shall begin within the first 30
minutes, and shall continue until completed.
3 Sample Location: Samples shall be collected at each stormwater discharge outfall (SDO) specified above
unless representative outfall status (ROS) has been granted, The permittee may petition the Director for
ROS using DEMLR's ROS Request Form. DEMLR may grant ROS if stormwater discharges from a single
outfall are representative of discharges from multiple outfalls. Approved ROS will reduce the number of
outfalls where the analytical sampling requirements apply and will be documented in a letter to the
permittee. A copy of the Division's letter granting ROS shall be kept on site.
4 For each sampled measureable storm event, the total precipitation must be recorded. An on -site rain gauge
is required. Where isolated sites are unmanned for extended periods of time, a local rain gauge reading
may be substituted for an on -site reading.
i Outfall Group 13 (Drainage Area 13) includes nine 10" stormwater discharge outfalls along the rail line.
Part II Page 7 of 16