Loading...
HomeMy WebLinkAbout20190719 Ver 2_eSAW-2017-02526 NWP_MFR_20190708U.S. ARMY CORPS OF ENGINEERS WILMINGTON DISTRICT Action Id. SAW-2017-02526 County: Cumberland U.S.G.S. Quad: NC-Vander GENERAL PERMIT (REGIONAL AND NATIONWIDE) VERIFICATION Permittee: City of Fayetteville Joseph Glass Address: 955 Old Wilmington Road Fayetteville, NC 28301 Telephone Number: 910.233.4740 E-mail: joe.glass@faypwc.com Size (acres) 3.5 Nearest Town Fayetteville Nearest Waterway Cape Fear River River Basin Cape Fear USGS HUC 03030004 Coordinates Latitude: 35.086356 Longitude: -78.871381 Location description: The project area is located east of Sherman Drive, north of Hoffer Drive, south of Stone Way Court, and west of the Cape Fear River in Fayetteville, Cumberland County, NC. Description of projects area and activity: This verification authorizes the permanent conversion of 0.092-acre of forested wetland and temporary impacts to 0.253-acre of wetland and 131 linear feet of stream channel for the purpose of replacing 2,800 feet of 20-inch ductile iron pipe force main with approximately 2,830 feet of 20-inch and 3,570 feet of 24-inch PVC force mains. Temporary impacts will be returned to original grade and seeded with a native wetland grass seed mix. These impacts are in conjunction with impacts previously authorized under this action identification. Applicable Law(s): Section 404 (Clean Water Act, 33 USC 1344) Section 10 (Rivers and Harbors Act, 33 USC 403) Authorization: NWP 12. Utility Line Activities SEE ATTACHED NWP GENERAL, REGIONAL, AND/OR SPECIAL CONDITIONS Your work is authorized by the above referenced permit provided it is accomplished in strict accordance with the enclosed Conditions, your application signed and dated 5/23/2019, and the enclosed plans Figure 4-9 dated 5/23/2019. Any violation of the attached conditions or deviation from your submitted plans may subject the permittee to a stop work order, a restoration order, a Class I administrative penalty, and/or appropriate legal action. This verification will remain valid until the expiration date identified below unless the nationwide authorization is modified, suspended or revoked. If, prior to the expiration date identified below, the nationwide permit authorization is reissued and/or modified, this verification will remain valid until the expiration date identified below, provided it complies with all requirements of the modified nationwide permit. If the nationwide permit authorization expires or is suspended, revoked, or is modified, such that the activity would no longer comply with the terms and conditions of the nationwide permit, activities which have commenced (i.e., are under construction) or are under contract to commence in reliance upon the nationwide permit, will remain authorized provided the activity is completed within twelve months of the date of the nationwide permit’s expiration, modification or revocation, unless discretionary authority has been exercised on a case-by-case basis to modify, suspend or revoke the authorization. Activities subject to Section 404 (as indicated above) may also require an individual Section 401 Water Quality Certification. You should contact the NC Division of Water Resources (telephone 919-807-6300) to determine Section 401 requirements. For activities occurring within the twenty coastal counties subject to regulation under the Coastal Area Management Act (CAMA), prior to beginning work you must contact the N.C. Division of Coastal Management in Wilmington, NC, at (910) 796-7215. This Department of the Army verification does not relieve the permittee of the responsibility to obtain any other required Federal, State or local approvals/permits. If there are any questions regarding this verification, any of the conditions of the Permit, or the Corps of Engineers regulatory program, please contact Emily Greer at 910.251.4567or emily.c.greer@usace.army.mil. Corps Regulatory Official: _____________________________________________________Date: 06/25/2019 Expiration Date of Verification: 03/18/2022 The Wilmington District is committed to providing the highest level of support to the public. To help us ensure we continue to do so, please complete the Customer Satisfaction Survey located at http://corpsmapu.usace.army.mil/cm_apex/f?p=136:4:0 Copy furnished: Agent: Hazen and Sawyer Linda Diebolt E-mail: ldiebolt@hazenandsawyer.com GREER.EMILY.C.1385325300 Digitally signed by GREER.EMILY.C.1385325300 Date: 2019.06.25 17:07:16 -04'00' Action ID Number: SAW-2017-02526 County: Cumberland Permittee: City of Fayetteville, Joseph Glass Project Name: North Fayetteville Force Main_City of Fayetteville - Public Works_Tokay Dr_Zepher Dr Date Verification Issued: 06/25/2019 Project Manager: Emily Greer Upon completion of the activity authorized by this permit and any mitigation required by the permit, sign this certification and return it to the following address: US ARMY CORPS OF ENGINEERS WILMINGTON DISTRICT Attn: Emily Greer Wilmington Regulatory Office U.S Army Corps of Engineers 69 Darlington Avenue Wilmington, North Carolina 28403 or emily.c.greer@usace.army.mil Please note that your permitted activity is subject to a compliance inspection by a U. S. Army Corps of Engineers representative. Failure to comply with any terms or conditions of this authorization may result in the Corps suspending, modifying or revoking the authorization and/or issuing a Class I administrative penalty, or initiating other appropriate legal action. I hereby certify that the work authorized by the above referenced permit has been completed in accordance with the terms and condition of the said permit, and required mitigation was completed in accordance with the permit conditions. _______________________________________ ______________________ Signature of Permittee Date NOTIFICATION OF ADMINISTRATIVE APPEAL OPTIONS AND PROCESS AND REQUEST FOR APPEAL Applicant: City of Fayetteville, Joseph Glass File Number: SAW-2017-02526 Date: 06/25/2019 Attached is: See Section below INITIAL PROFFERED PERMIT (Standard Permit or Letter of permission) A PROFFERED PERMIT (Standard Permit or Letter of permission) B PERMIT DENIAL C APPROVED JURISDICTIONAL DETERMINATION D PRELIMINARY JURISDICTIONAL DETERMINATION E SECTION I - The following identifies your rights and options regarding an administrative appeal of the above decision. Additional information may be found at or http://www.usace.army.mil/Missions/CivilWorks/RegulatoryProgramandPermits.aspx or the Corps regulations at 33 CFR Part 331. A: INITIAL PROFFERED PERMIT: You may accept or object to the permit. x ACCEPT: If you received a Standard Permit, you may sign the permit document and return it to the district engineer for final authorization. If you received a Letter of Permission (LOP), you may accept the LOP and your work is authorized. Your signature on the Standard Permit or acceptance of the LOP means that you accept the permit in its entirety, and waive all rights to appeal the permit, including its terms and conditions, and approved jurisdictional determinations associated with the permit. x OBJECT: If you object to the permit (Standard or LOP) because of certain terms and conditions therein, you may request that the permit be modified accordingly. You must complete Section II of this form and return the form to the district engineer. Your objections must be received by the district engineer within 60 days of the date of this notice, or you will forfeit your right to appeal the permit in the future. Upon receipt of your letter, the district engineer will evaluate your objections and may: (a) modify the permit to address all of your concerns, (b) modify the permit to address some of your objections, or (c) not modify the permit having determined that the permit should be issued as previously written. After evaluating your objections, the district engineer will send you a proffered permit for your reconsideration, as indicated in Section B below. B: PROFFERED PERMIT: You may accept or appeal the permit x ACCEPT: If you received a Standard Permit, you may sign the permit document and return it to the district engineer for final authorization. If you received a Letter of Permission (LOP), you may accept the LOP and your work is authorized. Your signature on the Standard Permit or acceptance of the LOP means that you accept the permit in its entirety, and waive all rights to appeal the permit, including its terms and conditions, and approved jurisdictional determinations associated with the permit. x APPEAL: If you choose to decline the proffered permit (Standard or LOP) because of certain terms and conditions therein, you may appeal the declined permit under the Corps of Engineers Administrative Appeal Process by completing Section II of this form and sending the form to the division engineer. This form must be received by the division engineer within 60 days of the date of this notice. C: PERMIT DENIAL: You may appeal the denial of a permit under the Corps of Engineers Administrative Appeal Process by completing Section II of this form and sending the form to the division engineer. This form must be received by the division engineer within 60 days of the date of this notice. D: APPROVED JURISDICTIONAL DETERMINATION: You may accept or appeal the approved JD or provide new information. x ACCEPT: You do not need to notify the Corps to accept an approved JD. Failure to notify the Corps within 60 days of the date of this notice, means that you accept the approved JD in its entirety, and waive all rights to appeal the approved JD. x APPEAL: If you disagree with the approved JD, you may appeal the approved JD under the Corps of Engineers Administrative Appeal Process by completing Section II of this form and sending the form to the district engineer. This form must be received by the division engineer within 60 days of the date of this notice. E: PRELIMINARY JURISDICTIONAL DETERMINATION: You do not need to respond to the Corps regarding the preliminary JD. The Preliminary JD is not appealable. If you wish, you may request an approved JD (which may be appealed), by contacting the Corps district for further instruction. Also you may provide new information for further consideration by the Corps to reevaluate the JD. SECTION II - REQUEST FOR APPEAL or OBJECTIONS TO AN INITIAL PROFFERED PERMIT REASONS FOR APPEAL OR OBJECTIONS: (Describe your reasons for appealing the decision or your objections to an initial proffered permit in clear concise statements. You may attach additional information to this form to clarify where your reasons or objections are addressed in the administrative record.) ADDITIONAL INFORMATION: The appeal is limited to a review of the administrative record, the Corps memorandum for the record of the appeal conference or meeting, and any supplemental information that the review officer has determined is needed to clarify the administrative record. Neither the appellant nor the Corps may add new information or analyses to the record. However, you may provide additional information to clarify the location of information that is already in the administrative record. POINT OF CONTACT FOR QUESTIONS OR INFORMATION: If you have questions regarding this decision and/or the appeal process you may contact: District Engineer, Wilmington Regulatory Division Attn: Emily Greer Wilmington Regulatory Office U.S Army Corps of Engineers 69 Darlington Avenue Wilmington, North Carolina 28403 If you only have questions regarding the appeal process you may also contact: Mr. Jason Steele, Administrative Appeal Review Officer CESAD-PDO U.S. Army Corps of Engineers, South Atlantic Division 60 Forsyth Street, Room 10M15 Atlanta, Georgia 30303-8801 Phone: (404) 562-5137 RIGHT OF ENTRY: Your signature below grants the right of entry to Corps of Engineers personnel, and any government consultants, to conduct investigations of the project site during the course of the appeal process. You will be provided a 15 day notice of any site investigation, and will have the opportunity to participate in all site investigations. ________________________________________ Signature of appellant or agent. Date: Telephone number: For appeals on Initial Proffered Permits send this form to: District Engineer, Wilmington Regulatory Division, Attn: Emily Greer, 69 Darlington Avenue, Wilmington, North Carolina 28403 For Permit denials, Proffered Permits and Approved Jurisdictional Determinations send this form to: Division Engineer, Commander, U.S. Army Engineer Division, South Atlantic, Attn: Mr. Jason Steele, Administrative Appeal Officer, CESAD-PDO, 60 Forsyth Street, Room 10M15, Atlanta, Georgia 30303-8801 Phone: (404) 562-5137 S1 ImpactsDepicted on Figure 5Wetland ImpactsDepicted on Figures 6 and 7Wetland ImpactsDepicted on Figures 6 and 7S2Depicted on Figure 8S3Depicted on Figure 90300600150FeetFigure 4SITE IMPACT OVERVIEW MAPNorth Fayetteville Force MainPhase 2 Section FFayetteville, NC1 inch = 300 feetSCALE/PUBLIC WORKS COMMISSIONCITY OF FAYETTEVILLE, NCLimits of DisturbanceImpact Figures Stream Impact Number: S1UT to Cape Fear RiverPerennial StreamTemporary Impacts from Excavation during Pipe InstallationsStream Width: 5 feetImpact Length: 41 feet0204010FeetFigure SITE IMPACT MAPNorth Fayetteville Force MainPhase 2 Section FFayetteville, NC1 inch = 20 feetSCALE/PUBLIC WORKS COMMISSIONCITY OF FAYETTEVILLE, NCLimits of DisturbanceProposed 20-inch Force MainProposed 24-inch Force MainStreamExisting RiprapTopographic LineExisting RailroadExisting Pedestrian TrailExisting Force MainExisting Gravity SewerExisting Storm Pipe5Jurisdictional ImpactsTemporary Stream ImpactPermanent Wetland Impact-Conversion to Maintained CorridorTemporary Wetland Impact-Existing Forested WetlandTemporary Wetland Impacts-Existing Maintained Corridor Wetland ImpactsWetland Impact No. W1 = Permanent, Conversion to Maintained Corridor - 0.092 acreWetland Impact No. W2 = Temporary, Existing Forested Wetland - 0.063 acreWetland Impact No. W3 = Temporary, Existing Maintained Corridor - 0.19 acre0204010FeetFigure SITE IMPACT MAPNorth Fayetteville Force MainPhase 2 Section FFayetteville, NC1 inch = 20 feetSCALE/PUBLIC WORKS COMMISSIONCITY OF FAYETTEVILLE, NCLimits of DisturbanceProposed 20-inch Force MainProposed 24-inch Force MainStreamJurisdictional WetlandExisting RiprapTopographic LineExisting RailroadExisting Pedestrian TrailExisting Force MainExisting Gravity SewerExisting Storm Pipe6Jurisdictional ImpactsTemporary Stream ImpactPermanent Wetland Impact-Conversion to Maintained CorridorTemporary Wetland Impact-Existing Forested WetlandTemporary Wetland Impacts-Existing Maintained Corridor Wetland ImpactsWetland Impact No. W1 = Permanent, Conversion to Maintained Corridor - 0.092 acreWetland Impact No. W2 = Temporary, Existing Forested Wetland - 0.063 acreWetland Impact No. W3 = Temporary, Existing Maintained Corridor - 0.19 acre0204010FeetFigure SITE IMPACT MAPNorth Fayetteville Force MainPhase 2 Section FFayetteville, NC1 inch = 20 feetSCALE/PUBLIC WORKS COMMISSIONCITY OF FAYETTEVILLE, NCLimits of DisturbanceProposed 20-inch Force MainProposed 24-inch Force MainStreamJurisdictional WetlandExisting RiprapTopographic LineExisting RailroadExisting Pedestrian TrailExisting Force MainExisting Gravity SewerExisting Storm Pipe7Jurisdictional ImpactsTemporary Stream ImpactPermanent Wetland Impact-Conversion to Maintained CorridorTemporary Wetland Impact-Existing Forested WetlandTemporary Wetland Impacts-Existing Maintained Corridor Stream Impact Number: S2UT to Cape Fear RiverPerennial StreamTemporary Impacts from Excavation during Pipe InstallationsStream Width: 13 feetImpact Length: 48 feet0204010FeetFigure SITE IMPACT MAPNorth Fayetteville Force MainPhase 2 Section FFayetteville, NC1 inch = 20 feetSCALE/PUBLIC WORKS COMMISSIONCITY OF FAYETTEVILLE, NCLimits of DisturbanceProposed 20-inch Force MainProposed 24-inch Force MainStreamExisting RiprapTopographic LineExisting RailroadExisting Pedestrian TrailExisting Force MainExisting Gravity SewerExisting Storm Pipe8Jurisdictional ImpactsTemporary Stream ImpactPermanent Wetland Impact-Conversion to Maintained CorridorTemporary Wetland Impact-Existing Forested WetlandTemporary Wetland Impacts-Existing Maintained Corridor Stream Impact Number: S3UT to Cape Fear RiverPerennial StreamTemporary Impacts from Excavation during Pipe InstallationsStream Width: 14 feetImpact Length: 42 feet0204010FeetFigure SITE IMPACT MAPNorth Fayetteville Force MainPhase 2 Section FFayetteville, NC1 inch = 20 feetSCALE/PUBLIC WORKS COMMISSIONCITY OF FAYETTEVILLE, NCLimits of DisturbanceProposed 20-inch Force MainProposed 24-inch Force MainStreamExisting RiprapTopographic LineExisting RailroadExisting Pedestrian TrailExisting Force MainExisting Gravity SewerExisting Storm Pipe9Jurisdictional ImpactsTemporary Stream ImpactPermanent Wetland Impact-Conversion to Maintained CorridorTemporary Wetland Impact-Existing Forested WetlandTemporary Wetland Impacts-Existing Maintained Corridor FAYETTEVILLE PUBLIC WORKS COMMISSION FAYETTEVILLE, NORTH CAROLINA NORTH FAYETTEVILLE FORCE MAIN PHASE 2 SECTION F HAZEN NO.: 32463-000 MAY 2019 PRELIMINARY DRAWING - FOR REVIEW PURPOSES ONLY ell iJ 54'13 LOCATION MAP NOT TO SCALE Haz__en s �E5S29SEAL HAZEN AND SAWYER 4011 WESTCHASE BOULEVARD, SUITE 500 RALEIGH, NORTH CAROLINA 27607 LICENSE NO. C-0381 90% SUBMITTAL -�f/ / /FEMAZONE'X' a TO 7 —0O3 C A — 100YR FLOODPLAIN �g 04� C05 KEY MAP SCALE: 1" = 300' EXISTING OS SANITARY MANHOLE POWER POLE N LIGHT POLE GUY WIRE VALVE ® WATER METER TREE SYMBOLS PROPOSED • SANITARY MANHOLE —RADINGSSTABILIZE STREAM AND UNKS CONSTRUCTION ENTRANCE MATERIALS ASPHALTPAVING = CONCRETE = GRAVEL ENG EER, T. TANT N. JOHNSONDRAWN E55 oh PRELIMINARY DRAWING o�tN BY J. BARNAK FOR REVIEW SEAL T. TANT PURPOSES ONLYIF �'CINEEp �y THIS BAN 00ES ENNOT 0 — 1 ING ISHOT To F— BCALE Hazen HAZEN AND SAWYER 4011 WESTCHASE BOULEVARD, SUITE 500 RALEIGH, NORTH CAROLINA 27607 LICENSE NO.: C-0381 EXISTING W WATERLINE 55 SANITARY E ELECTRIC T TELEPHONE GA5 NATURALGAS FOC FIBEROPTICCABLE CATV — CABLEN OHE — OVERHEAD ELECTRICAL UNDERGROUND ELECTRICAL FENCE STRUCTURE TRBELIHE —150— INDEX CONTOUR INTERMEDIATECONTOUR PROPERTY LINE EXISTING PERMANENT EAS -ENT TOP OF BANK 25 FT STREAM BUFFER +"uvrz FE—NE-1FLODOPIAIN GENERALNOTES LINETYPE PROPOSED SANITARY SEWER —�ao— LIMITS OF DISNRBANCE sF SILT FENCE TREE PROTECTION FENCE INDEX OF DRAWINGS DRAWING DESCRIPTION NUMBER GENERAL CIVIL C01 CO2 C04 C05 DETAILS DOI D02 D. �a BEFORE YOU DIG1 CONTACT ONE -CALL CENTER CALL .1 FAYETTEVILLE, PUBLIC WORKS COMMISSION FAYETTEVILLE, NORTH CAROLINA KEY MAP, LEGEND, INDEX j:.:A.ATff—:T: NORTH FAYETTEVILLE OF DRAWINGS FORCE MAIN MBER. PHASE 2 SECTION F MAY 2019 32463-000 01 G02 STATE EROSION AND SEDIMENT CONTROL CONSTRUCTION SEQUENCE 1. CONTRACTOR SHALL SIGN AND IMPLEMENT THE REQUIREMENTS OF HE STATE APPROVED CONTEROSION ACT HE NCDEQ DIVISION NTN OF LAND QUON ALITY ONTROL P ECONTRACTOR AAITY ATLEAST TWO (2) BEFORE CONSTRUCTION ACTIVITIES BEGIN (919) 7914200. THE CONTRACTOR SHALL ABIDE BY ALL PLAIN ALLRE REQUIRED DOCUMENTATION SHAUIREMENTS OF THE APPROVED LLL BE KEPT UP TOOSION AND IDATE AND N CONTROL MAINTAINED INA SAFE LOCATION ON-SITE AT ALLTIMES DURING CONSTRUCTION. 2 (COC) MUST BE EROSION AND OBTAINED BEFO ELADND IA)NDISTUEING ACTIEff"VITIES TE OCCUR.. TFIGE COC CAN BE OBTAINED BY FILLING OUT THE ELECTRONIC NOTICE OF INTENT (E-NOI) FORM AT U.e.0c.9.v/,XM01. PLEASE NOTE, THE E- 01 FORM MAY ONLY BE FILLED OUT ONCE THE PLANS HAVE BEEN APPROVED. A COPY OF THE EMC PERMIT, THE PERMITS 0., AN. ACCE.UI NG NG ECTION 3, INSTALL PERIMETER EROSION CONTROL MEASURES AS SHOWN ON THE CONTRACT DRAWING PRIOR TO STARTING CONSTRUCTION, INCLUDING SILT FENCE AND TREE BE. IN UNTF I -ALL EROSION C. ME M=E BEEN AL E A, CONSTRUCTION AREAS, ONCE ALL TEMPORARY EROSION CONTROL MEASURES HAVE BEEN INSTALLED, TRENCHING FOR UTILITY INSTALLATION CAN BEGIN. E WORK SHALL BE INSTALLED IN ACCORDANCE WITH STANDARD CONSTRUCTION TECHNIQUES. ONLY THE LENGTH OF TRENCH IN WHICH PIPE CAN BE INSTALLED IN ONE DAY'S TIME SHALL BE OPEN AT ANYTIME, WITH SPOIL MATERIAL PLACED ON THE UPHILL SIDE OF HE TRENCH. PIPING SHALL BE CAPPED AT END OF TEMPORARYBACKFILUED AT END OF EACH SEEDING MEASURES YIF APPROPRIATE. A BASE LAY R OF SCRE N NG FINES SHALL BE USED UNDER ALL DEPOSITS OF SPOILS MATERIALS IN HE ROADWAY. ANY EXCAVATION DEWATERING FLOWS SHALL PASS THROUGH SEDIMENT FILTERING DEVICE BEFORE DISCHARGE LIMIT DISTURBANCES TO THE LENGTH (SEE DETAIL 02270388 ON SHEET D03AT CAN BE STABILIZED AT THE END 0 THE WORK DAY 5 MPORAR)` SEEDING MEASURES SHALL BE EMPLOYED AS SOON AE PRACTICABLE IN PORTIONS OF THE SITE WHERE CONSTRUCTION ACTIVITIES HAVE TEMPORARILY OR =NENTCY CEASED, BUT IN NO CASE MORE THAN EN (14) DAYS AFTER HAS EA D, EXCEPTSTABILIZATION ME PRECLUDED BY SNOW OR FROZEN GWHEREROUND CONDITIONS, OR WHB ELD RE CONSTRUCTION ACTIVITY WILL BE RESUMED WITHIN 14 DAYS. 6.ONCE ALL EARTH WORK AND CONSTRUCTION ACTIVITIES ARE COMPLETE, FINAL GRADING MAY BEGIN. UPON COMPLETION OF FINAL GRADING, PERMANENT STABILIZATION MATTING, MULCHING AND FERTILIZING MEASURES SHALL BE EMPLOYED ON ALL DISTURBED AREAS AS PER SPECIFICATION SECTION 02275 AND IN ACCORDANCEENTS IF ER SHALL BE ESTABLISHED ON ALL DISTURBEDSAREAS WITH N IHIET 15S WORK�NGD DAYS OR 30 CALENDAR DAYS, WHICHEVER TS SHORTER. ALL EROSION CONTROL MEASURES SHALL REMAIN IN PLACE UNTIL THE ENTIRE SITE HAS BEEN STABILIZED. MEASURES SHALL BE RETURNED AS CLOSELY AS POSSIBLE TO ORIGINAL CONDITION AND SEEDED, MULCHED, AND FERTILIZED AS PER SPECIFICATION SECTION 02930 AND N ACCORDANCE WITH THE REQUIREMENTS OF THIS SHEET. WETLANDS SHALL BE SEEDED N ACCORDANCE WITH SPECIFICATION SECTION 02934. B.NO MATERIALS CAN BE STORED OR STOCKPILED IN THE RIGHT OF WAY OUTSIDE OF AN ACTIVE CONSTRUCTION ZONE. 9. CONCRETE WASHOUT ON THE GROUND, INTO STORM WATER PIPES, OR INTO SWALES, DITCHES, STREAMS, OR CREEKS WILL NOT BE PERMTnED, CONTRACTOR SHALL PROVIDE A PROPER WASHOUT LOCATION OFFSITE. 10. STOCKPILE OF SOIL WILL NOT BE PERMITTED ON SITE OTHER THAN WHEN ACTIVE BENCH EXCAVATION AND BACKFILLING IS OCCURRING. ALL EXCESS SOIL MUST BE NP AND DISPOSED OF ATA PROPER LOCATION. JE COM EML 'CLOSE OUT THE E&SC PIAN. AFTER DEMLR INFORMS THE PERMITTEE OF THE TO PROJECT CLOSE OUT, VIA INSPECTION REPORT, THE PERMITTEE SHALL VISIT d,—EI TO SUBMIT AN ELECTRONIC NOTICE OF TERMINATION (E -NOT). A $100 ANNUAL GENERAL PERMIT FEE WILL BE CHARGED UNTIL THE E -NOT HAS BEEN FILLED OUT SELF INSPECTION REQUIREMENTS TIES 1EDI"EN-11N REQUIRE THAT PERSONS RESPONSIBLE FOR LAND -DISTURBING ACTIVITIES INSPECT AP—' - AFTER EACH PHASE OF THE PROJECT TO MAKE SURE THAT THE APPROVED EROSION AND SEDIMENTATION "N-11- PIN ISBEING INSPECTIONS TOOK EFFECT OCTOBERR1, 2010 EHE SELF-INSPECIINI TION PROGRAM IS E SEPARATE FROM HE WEEKLY SELF-MONITORING PROGRAM OFTHE NPDES STORMWPTER PERMIT FOR CONSTRUCTION ACTIVITIES. HE FOCUS OF HE SELF -INSPECTION REPORT 15 THE INSTALLATION AND MAINTENANCE OF EROSION AND SEDIMENTATION CONTROL AFTER "BE CONDUCTED EACH PHASE OFHE ROJETHE ApCT AND CONTED PLANINUED UNTIL PERMANENTMUST GROUND COVER IS ESTABLISHED IN ACCORDANCE WITH NCGS 113A-54.1 AND 15A NCAC 48.0131. THE RE -INSPECTION REPORT FORM IS AVATUBLE AS AN EXCEL SPREADSHEET FROM HRP://WWW.D W.ENR.STATE.NC.US/PAGES/SEDIMENIATION_NEW.HTML. IF YOU HAVE QUESTIONS OR CANNOT ACCESS THE FORM, PLEASE CONTACT THIS OFFICE AT (919)791-4200. EROSION AND SEDIMENT CONTROL MAINTENANCE PLAN ALL EROSION CONTROL MEASURES SHALL BE INSPECTED WEEKLY AND AFTER EACH RAINFALL EVENT OF % INCH IN 24 HOURS. ANY NEEDED REPAIRS SHALL BE MADE IMMEDIAT—TO PREVENT FURTHER DAMAGE AND EROSION 5FRUCTURESAND MEASURES THAT '"ALL BE 'N"EED ARE OUTLINED IN THE FILE Lo" SECTIONS TFE PERSON H. MERIORMI NO AND MAKE RECORD OF THE INSPECTIONSAT HE SITE OF THE LAND G ACTIVITY VIATION FROM HE APPROVED EROSION CONTROL PLANT IDENTIFY ANY MEASUREEETHAT MAY BE REQUIRED TO CORRECT DEVIATION, AND DOCUMENT THE COMPLETION OF HOSE MEASURES. THE RECORD SHALL BE MAINTAINED UNTIL PERMANENT GROUND COVER HAS BEEN ESTABLISHED AS REQUIRED BY THE APPROVED EROSION AND SEDIMENTATION CONTROL PLAN. TREE PROTECTION FENCE ANY FABRIC WHICH COLI IEEE, TEARS, DECOMPOSES, OR BECOMES INEFFECTIVE, WILL BE REPLACED IMMEDIATELY. SULT FENCE ANY ERIC WHICH COLLAPSES, TEARS, DECOMPOSES, OR BECOMES INEFFECTIVE, WILL BE REPLACED IMMEDIATELY. SEDIMENT FILTER BAG ANY DAMAGE TO THE SEDIMENT FILER BAG SHALL BE REPAIRED IMMEDIATELY. TEMPORARY SEDIMENT FILTER BAGS SHALL BE REPLACED WHEN 61NCHES OF SEDIMENT HASE ACCUMULATED ORINACCORDANCEWITHTHEMANUFACTURE- RECOMMENDATIONS MONITOR SEDIMENT FILTER BAG REGULARLY FOR THE PRESENCE OF TURBID WATER SING DISCHARGED. ANY TURBID WATER BEING DISCHARGED FROM THE BAG SHALL BE RAOT LVED SEDIMENT IAPACYITY ANDNRPOEPLACE RLOUHMC'KIATELARE NOT FOUND, ASSUME THE BAG SELF -INSPECTION SELF INSPECTEON 15 REQUIRED PER G.S. 113A-54.1. SELF -INSPECTION FORM CAN BE FOUND AT: JAMES R. MICHEL. PE FAYETTEVILLE PWC 05OLD �EVIL ERI WILMINGTON D f mY..mlcM1el®reypwc.m1 910.1234785 NICHOLE JOHNSON, PE, HAZEN AND SAWYER =h—„WUx.vrym.wm SEEDING SCHEDULE rae seenuu vv.xrs sFAspx NE rUaTdoFx PEA. 1BITH vnixrewxce I, TAR I HE NR I.wlrma_I [�FINN” 7Q REIIII YR, II Ii�uxa mo ami .Tx... E. WETIANDS SEEDING MIX Deter TyPas Rete EROSION AND SEDIMENTAITONCONTROL NOTES Warm S.. -R IN HNSON N.JOHNSON .. 32463-000 SAR.Rass. 0 ... AR -rock, Alamo 81 #/acre or 4 DZI1,000 J. April 1 M 15 SmaNW..O: ah U, 2bulk#/acre ori oz./1,000.( 2 PERMITTING ov2R19 INs1 DDESNOT R 1n' 1 Japanese Millet Of SPIN —Sutlan 2416/acre or I Q IW1,000 s. f. RALEIGH, NORTH CAROLINA 27607 Gress Hyrbid. (Maw prim W —*) G03 TBOPorzry MI, Of Japanese Millet m Jay 16 Sept i SmNM1um Sutlan Gras. Hybntl. UP Be 20-Ibslacm or 112 INV1,0000.. 111—d by -—t RI'I Sept2-NOv.t Cool Season Mix ... acre 12 bulk 1 or 6 o2./1,000 J. R.. Ce Grass Sm.Hvre.E 2bulk #/acre ori w./1,000s f. Nov.2-March 3l TWBPOmry Crop of Wheat Ito b. 401bs/acr. m f011owed by WITH ... Mixlare) Psnu,ae,m �nu,vse res. xw �( xrhP�Dow.r..lxwn=� +ear. x.. ��� Nesr use una. rants nnaNsxannax.n agenniww. �+�Nlamsans rmanwwnrann4x rarq xwsvasnrPsnunns xwm ENGNEER T. TAINT �ZN CAR0�7 PRELIMINARY DRAWING =°QosEss'°,r¢29 FOR REVIEW SEAL PURPOSES ONLY y C4 p z H d`' Q<f Haran HAZEN AND—SAWYER 4011WESTCHASEBOULEVARD, SUITE 600 FAYETTEVILLE PUBLIC WORKS COMMISSION FAYETTEVILLE, NORTH CAROLINA EROSION AND SEDIMENTAITONCONTROL NOTES MAY 2019 HNSON N.JOHNSON .. 32463-000 DRAWN BY J. NORTH FAYETTEVILLE FORCE MAIN .. 01 CHECKED BY T. TANT IFAWNG NUMBER. 2 PERMITTING ov2R19 INs1 DDESNOT R 1n' 1 ING 04/2019 N9FEV 5. JOA'' RALEIGH, NORTH CAROLINA 27607 PHASE 2 SECTION F G03 ON —E BY NOT I.FIILLECAUEB LICENSE NO.: C-0381 ry.: °ew,.;=� kx ea,em ekaN�ea.pmem,ra, neUl�ewnew �mspoaueelwnu inea ana pwcemaiwweaa d,nwr� p edmwmp,m^ ede rsle.g r, eusn l pnicslu mwmsn wnso-ueaipnaMtl memcwxcesmp abryav ^Insana suRxe rvn 1. dullill 11— ,s^aeaeewpwwmavemaw. ne, I HO, IneNlf acnm md ns ana.1i nabryavallable� ^ o uaw, splvems,aecerge ¢amaot Nlorenewastlx�pm a.^a,atlwatsgfenawaynom narmawlm, 2 bryavaM1able. U 4reNwaaeiGSry me aulerw remweleakiw p^nanlew�lnsava reel wcNgrleM r«Mlle n«Npge mnln trzpe'i mefraemx prow I, I I., H.. I. mm arz,n,nlnlel59ioustwtnewa nal,nwnlacM1 wu�la receive newasnpuc PJtllhpnal«mw4may be rcyulretltbyme Posts@nageon taM1ewasnoutls Nfaold -d-1 —In me pw 1 1.h pill uepbr—d., im 1 -did, r pit. if applluhle,eml nadhseame,nurhense 0zz lal pla,nieaaa,men p i^^I„a cream ^,weea^a. 0 • �mnaresswllone«mare, . Mre aaalra am4,ar avn. • TMyarewnda�whnnsuRacewnenllrepeessnwiamel- lal �ve�mag3 xal�U's�iag-xss.az, a^aaocag at>31ars«no^ tox a[cgc lel Am gwsee gpaues a.au^annaparea bvpasus. Iq nmmnmen nn,neapaaI— n tds p—.1 h.1d,pr I, tlsasl I—, pnw^vewn leapinnvagsgneooj vi:ob asgagsg^r�g3 Tsap. NCGO1 SELF -INSPECTION, RECORDKEEPING AND REPORTING I EFFECTIVE: 04/01/1 T. TAINT HNSON N.JOHNSON a„wn �m� nmename.aanm.a lal v Ibl Ixgnwli l^e�ce rva^a kl s suepert a t ax,c, ca a ere lel ^atterr n . to warcnnea ud emgNsl^utnarnnln srlll n^telsl^ageme sdl. use^mmtne - HAZEN .. 32493-000 slpJapwp vAm d Mqv� Mgvl:r oV a vAms/ripccuimuae.a Inwan«cae eende -11 11111 � ry.: °ew,.;=� kx ea,em ekaN�ea.pmem,ra, neUl�ewnew �mspoaueelwnu inea ana pwcemaiwweaa d,nwr� p edmwmp,m^ ede rsle.g r, eusn l pnicslu mwmsn wnso-ueaipnaMtl memcwxcesmp abryav ^Insana suRxe rvn 1. dullill 11— ,s^aeaeewpwwmavemaw. ne, I HO, IneNlf acnm md ns ana.1i nabryavallable� ^ o uaw, splvems,aecerge ¢amaot Nlorenewastlx�pm a.^a,atlwatsgfenawaynom narmawlm, 2 bryavaM1able. U 4reNwaaeiGSry me aulerw remweleakiw p^nanlew�lnsava reel wcNgrleM r«Mlle n«Npge mnln trzpe'i mefraemx prow I, I I., H.. I. mm arz,n,nlnlel59ioustwtnewa nal,nwnlacM1 wu�la receive newasnpuc PJtllhpnal«mw4may be rcyulretltbyme Posts@nageon taM1ewasnoutls Nfaold -d-1 —In me pw 1 1.h pill uepbr—d., im 1 -did, r pit. if applluhle,eml nadhseame,nurhense 0zz lal pla,nieaaa,men p i^^I„a cream ^,weea^a. 0 • �mnaresswllone«mare, . Mre aaalra am4,ar avn. • TMyarewnda�whnnsuRacewnenllrepeessnwiamel- lal �ve�mag3 xal�U's�iag-xss.az, a^aaocag at>31ars«no^ tox a[cgc lel Am gwsee gpaues a.au^annaparea bvpasus. Iq nmmnmen nn,neapaaI— n tds p—.1 h.1d,pr I, tlsasl I—, pnw^vewn leapinnvagsgneooj vi:ob asgagsg^r�g3 Tsap. NCGO1 SELF -INSPECTION, RECORDKEEPING AND REPORTING I EFFECTIVE: 04/01/1 T. TAINT HNSON N.JOHNSON �tN CAROB omen FAYETTEVILLE PUBLIC WORKS COMMISSION MAY 2019 - HAZEN .. 32493-000 DRAWING =°a FAYETTEVILLE, NORTH CAROLINA DRAPRELIMINARY wry o1/: J. FOR REVIEW SEAL NCG01 REQUIREMENTS CONTRACT ' 01 CHECKED BY T. TART PURPOSES ONLY y UJ19fi3� HAZEN AND SAWYER NORTH FAYETTEVILLEIN 2 PERMITTING os/tots NSO 11 THIS OAR DOES NOT a fn• g yp/�'CINEF-�a'� 4011 WESTCHASE BOULEVARD, S ITE 500 FORCE MAIN M6ER 1 90% SU INUTAL 04/2019 rv9 we S P i �� RALEIGH, NORTH CAROLINA 27607 PHASE 2 SECTION F G04 LICENSENO.:C-0381 �,00 YEARFL000PUIN CITY �FE � MAZDNE x SFmF — PVC C9 1 FORCE — Po \\�\M\ _c"`� ,•^ h� =Y9,Tr �L9_ Rf9 = Nl_ C9_ �— � J6 WQT 0+00 1+00 2+00 3+00 ~ 4+000 FN V CAP FOR FUNR FMONNECTION ss FN ss ss rrn %. 20 FM 9a� OLK SOUTHERN RR PLAN SCALE: 1:40 D/I 2� ISTRUI ON EN ON SHEET Dao TRANCE, TYP 105 105 100 00 1 95 E%GRADE. TYP 95 90 ................... 90 m m 85 .......... .......... - ... 2—W c9oo DR2t ORCEMaN 85 w w fioCAP FOR RECONNE 80 e 7s - -1+00 0+00 1+00 2+00 3+00 4+00 5+00 6+00 7,00 • PROFILE HORIZONTAL1:40 �Q VERTICAL SCALE:LE: I" 1"=4' suLE.i =40 4o z0 BEFORE NrnCT ONE- CO� CALL YOU DIGI CENTER eat1 PllElT SN. NESE T. TAINT PRELIMINARY DRAWING FOR REVIEW PURPOSES ONLY �ZN CAROBPUBLIC =°a F'°,r9Hc-uen SEAL e3++� : 2 p d`' �/P HAZEN AND SAWYER 4011 WESTCHASE BOULEVARD, SU ITE 500 FAYETTEVILLE WORKS COMMISSION FAYETTEVILLE, NORTH CAROLINA CIVIL PLAN AND PROFILE STA 0+00 TO 7+00 MAY 2019 N. JOHNSON .. 32463-000 DE -N BY J. BARNAK NORTH FAYETTEVILLE FORCE MAIN 01 CHECKED BY T. TANT INS MaEa 05/2019 st DOES NOTy�'ciME 04/2019 N9 IND i 5. JGN RALEIGH, NORTH CAROLINA 27607 PHASE 2 SECTION F C01 REV IllUED FOR DATE BY NIT.E LICENSE NO.:C-0381 r FEMA € F FAYETTE AR Sin ez `j 1 CITY OF FArETrEVIUE SEE INSERT MAP THIS SHEET FOR SROP 9ED 2445 BEND w000[N v[Dssnxwl aniocc PROPOSED 2445 BEN BYPA99 ASSEMBLCONNECTION TO Y 20 FM AND EX PROPOSED 24- 1135 BEND T., AINR5LEA55s EPVCCE000 ? Rl FORCE <� �< E%2�E�ND \9 E 9 n 4'BYPAS 8,00 —9+00 10+00 11+00 12+00 13+00 sit MATOhC,��� RR RAN /VF`STq 74+_ ___ EMovE AND RE o• we c9DD DR21 FoncE MUN A _ �.. �,w. `\� SFF e —� PLAN SCALE: 1:40 NOTES: 1.NGSPORARY VEHICUWi STREAM CROSSIARE NECESSARY, SEE DETAIL 0221019R ON SHEET D03. 2. PROPOSED 21Y FORCE MAIN SHALL BE INSTALLED PARALLEL TO THE PROPOSED 24' FORCE MAIN. RE' NSTALLLLED ON THE 20 FORCE MAIN SHAL`BE THE IF SAMEASTHOSESHOWN FO— FORCE BAN, UNLESS OTHERWISE NOTED, 105 105 24- MJ COUPLE JOINT 100 100 24- HERE 20"x24"REDUCER CLOSE TAPPNGVALVE ANDINSTALL20'RJMJCAP ON VALVE AFTER NEW FM IS IN SERVICE E, TYP N 20 TAPPING VALVE EXDIP FM TO REMOVE20'MJCAPANDCONNECTTOE%FMWITH REMAIN IN SERVICE RJ SLEEVE AFTER NEW 20' FM HAS BEEN TESTED 9s 2.a 95 95 4 'MIN, COVER mg 90 90 2ax20"FULL BODY a. TAPPING SLEEVE 220' MJ CAPS 12' x 20' LINE STOP SADDLE of m ? W m m DEAD MAN 5'x Bx 5.5'D 2"x20"SADDLE W/ REM INEW. CEBEE 21 NG CORPORAT ON STOP FM WITH NEW 24 0900 DR 21 FM 85 s PJC C900 DRI F RCE MAIN es PLAN SCALE: 1:5 60 80 0 LF REBTPAINE I JOINT F RESTRAINED J01 <$ T 7$ 7$ ===1 6+00 9+00 10+00 11+00 12+00 7+00 13+00 14+00 O • PROFILE HORIZONTAL �a SCALE: 1:40 VERTICAL SCALE: 1"=4' BEFORE 40 CONTACT ONE -CA CENTER suL5.1 =40 IGI 4O zD� CALL LSIeat SN. EEF T. TAINT �1N CAROBPUBLIC PRELIMINARY DRAWING =°a F'°,r9Hc-uen EOR REVIEW SEAL PURPOSES ONLY :NORTH 2 p y�'cIME d`' �/P HAZEN AND SAWYER 4011WESTCHASEBOULEVARD, SUITE 500 FAYETTEVILLE WORKS COMMISSION FAYETTEVILLE, NORTH CAROLINA CIVIL PLAN AND PROFILE STA 7+00 TO 14+00 MAY 2019 N. JOHNSON IF—.. 32463-000 DRAWN BY J. BARNAK FAYETTEVILLE FORCE MAIN 01 CHECKED BY T. TAINT IRAWING NUMBER 05/2019 SJ IF THIS BAR —SNOT 04/2019 NSJ ING I 5. JON RALEIGH, NORTH CAROLINA 27607 PHASE 2 SECTION F CO2 REV 111TED FOR —E BY KS LICENSE NO.: G-0381 j NOTES:NEEXISTING2D�FORCE MA N N s OTREMOVED / OURNGTHE NSTALLE ONOF THE NEWFORCE D LLED WITH GROUT MAIN SHALL BE CAPPED AND EIS / CIT' 0,FAYE2TTEVLLE 2 WHERE CROSSINGS ARENECESSARY, CESSCULPR STREAMITA I' 0227019R ON SHEET DIG E �- 24 PVC 0900 DR21 FORCE MAN 9p1 % HI 3. PA ULEE0O FORCE MAIN SHALL OR INSTALLED NO PARALLEL D THE PROPOSES 24' FORCE MAIN OD LL...T_ LL y `W' ` T-� M3EEP COLLAR EX2+•HDPE BYPA65 RESTRA NED JOINT LENGTHS AND FITTINGS •tl N NSTALLED ON THE RE m' FORCE "AIN sHALL BE THE W DEFLECT JOINTS I-MAXy SEE NOTE1 UNLESS O OTHERWISE NOTEDIN .. HE24 FORCE MAIN 4 - TWO JOINTSOF PIPE ,L O W r r r r I GO ' - • - s--�. r a < T + 1 20+00 _ ED 0 /ZIW W � • r'H"•��-•dim` 3t0¢r=•21'r m6'—�%^J'L ee •moo �°C&F—t&`^e •=dM=-�3TryuT�QH=,^—rM��I�`� D W / 2 DEFLECT JOINTS` / I Z ( I TWO JOIM JFPIPET� // (l J O 38-95-1598 N STAISr32 ST' -1 COLLAR DE 0 JOINOINTSI°MAX ANTI -SEEP COLUR CITY OF FAYETTEVILLE 20"PVC 0900 DR21 FORCE MAIN SEE NOTE2 I' TWOJOINTS OF PIPE PROPOSED 45- BEND U) m m PLAN i= SCALE: 1:40 m OR 1 n 100 100 95 95 g EX GRADE. IF 90 m 90 l� W rvO yvwi mn z r 42'MIN COVER 80 80 CEMIN 75 8 75 70 RE RA 70 0 14+00 15+00 16+00 17+00 18+00 19+00 20+00 21+00 �J • PROFILE �Q HORIZONTAL SCALE: 1:40 VERTICAL SCALE: 1"=4'BEFORE 40 COT ONE -CA CENTER suLE.L =40 IGI 40 zD� NrnCCALL LSIeat PROJEIT BR. REER T. TAINT FAYETTEVILLE MAY 2019 N. JOHNSON �tN CARo�PUBLIC WORKS COMMISSION CIVIL .. 32463-000 PRELIMINARY DRAWING =°a F°,r9Hc-uen FAYETTEVILLE, NORTH CAROLINA C.NTRACT NI DRAWN BY J. BARNAK FOR REVIEW SEAL PLAN AND PROFILE o1 T. TAINT PURPOSES ONLY a5++� : — NORTH FAYETTEVILLE MaE CHECKED BY2 p HAI ND SAWYER R 05/2019 sJ IF TRIP BAN DOES NOTy�'cIME d`' 4011 WESTCHASE BOULEVARD, SU ITE 500 FORCE MAIN 04/2019 NSJ INOI 5. JON RALEIGH, NORTH CAROLINA 27607 STA 14+00 TO 21+00 REV 111TED FOR DATE BY NIS LICENSE NO.:C-0381 PHASE 2 SECTION F CO3 � �^^ —PLAIN NOTES: t WHERE EXISTING 20'FTC MAIMS NOTREMOVED DURING THE INSTALLATION OF THE NEW FORCE 111T NG MAIN SHALL BE CAPPED AND FILLED WISH GROUTCF 0438ET-B231- CITY OFFAYETTEVILLE 2. WHERE TEMPORARY VEHICULAR STREAM ROSSINGS NECESSARY, SEE DEIAHL X07N9R ON SHEET DIO E 3, PROPOSED 2T FORCE MAIN SHALL BE INSTALLED RESTRAPARALLEL TO THE PROPOSED 24' FORCE MAIN. NT LIENGTHS D —INGS �qA LLITIHOBEIBHOWNFORANE srnuEo ory THE m' Poac �0 p' [x. za'aca INIIN eset E%.Ya'Rcr SEE NOTEI Ixv0ure5.65 Ex 24 HDPE BYPABB 24 PVC C900 DR21 FORCE MAIN N BA FORCE MAIN UNLESS OTHERWISE NOTED.ETM — — — — mr b.,rm + u + ___ +00 22,0 + Sc - + — 6s xr _ ___ ___ G. I I 98 rM HN D_M os��3p —��. orae`_ F,.fo�ee � =�%o��ae •^,g5 — =C86� _ _ _ �,� Imo/ pIT z I D�2s / 04F D 4p CI FAYETTEVILLE SEE NOTE 2 ILLE 20' PVC CB00 DR21 FORCE MAIN !n m rnm m = m O PLAN SCALE: 1:40 In m o 100 100 95 95 90 EX GRADE TYP 90 85 85 80 42 MIN. COVER 80 75 75 70 70 21+00 22+00 23+00 24+00 25+00 26+00 27+00 28+00 O �f � PROFILE HORIZONTAL SCALE: 1:40 VERTICAL SCALE: 1"=4' �a BEFORE 40 20 0 0' CONTACT ONE -CAU CENTER SCALE .1 =40 wwskmw"I CALLSU SH. NESS T. TANT PRELIMINARY DRAWING EOR REVIEW PURPOSES ONLY �ZN CAROBPUBLIC =°a ,r9Hc-uen SEAL 2 p :HAZEN y�'OINEE d`' �/P AND SAWYER 4011 WESTCHASE BOULEVARD, SU ITE 500 FAYETTEVILLE WORKS COMMISSION FAYETTEVILLE, NORTH CAROLINA CIVIL PLAN AND PROFILE STA 21+00 TO 28+00 MAY 2019 N. JOHNSON .. 32463-000 DRAWN BY J. BARNAK NORTH FAYETTEVILLE FORCE MAIN CONTRACT , 01 CHECKED BY T. TANT MBER 05/2019 S1 IF DOES NOT 04/2019 NSJREV IllUED FOR DATE BY TT. Wel S 5. JON RALEIGH, NORTH CAROLINA 27607 LICENSE NO.:C-0381 PHASE 2 SECTION F C04 I 1 t DHESEx STING20•FORCE Daae-e]-fizat- Daae-ss-tsss- MAWLNEWIF EME OURINGTHE INSTALLATION OFTHE NEW FORCE CITY OFFAYETTEVILLE }8 FILLED WISH C-UT TING CE MAIN SHALL BE CAPPED AND 2. N SEE NOTE 2445 BEND I 24•PVC14gOD@fQAffOHO66&IN Ixv.3o-Hca ouTee si CFXO GRAVITY SEWER. VERIFY DEPTH AND LOCATION OF KV (� PROPOSED .1lxm38 wvo0 EX 24PHOPE zEPWCE EXRGN.DMH UNOLEGOG NED JOINT ITINGTALR. LEO U' BYPASG WITH 6' 9 MANHOLE a PARALLEL TO THE PROPOSED 24' FORCE MAIN. RESTRAEDONTIHE LENGTHS AND FITTINGS e' 0 DOGHOUSE MX FOR INSTALLED ON THE 20' FORCE MAIN SHALL BE THE EX 24'HDPE BYPASS mm fg{p Po 0� _.yr6F`— 0•FMCONN TION NFOR THE 24 FORCE MAIN, J BEE NOTE 2 EC EO SEE CONSTRUCTION SS __ I 5+ 3 _tNTaANCE Mna, THIssHEET -- a L sNVR Ess FRFm + _ 48t "BE �zo•so•SEND, NTS 11 E = I F P'aoJPOGI ED 2.0 45 KENO _1 mu fjAmlw CBS0 DR21 FgRCE,MAIN ¢� INE -STA 32+SLS SHS m a BE WE—Nl LANPLASCALE: 1:40 SCALE: 1:40 m 100 100 95 EX GRADE. TYP 95 EX 30' POP GRAVITY 3EWER, 90 SE NOTE2 90 LIMITS OF DISTURBANCE FOR CONSTRUCTION ACCESS TEMPORARY CONSTRUCTION ENTRANCE 85 SEE DETAIL E— ON SHEET DIM ..... .... _- CONSTRUCTION ENTRANCE MAP SCALE: 1'=500' 80 VC C900 DR21 FORCE MAIN 80 �8 m� 75 75 1 LF RE—NE ]DIM 269 LF RESTRAINED INT 70 70 O �f � 28+00 29+00 30+00 31+00 32+00 33+00 34+00 35+00 36+00 36+50 �a PROFILE BEFORE HORIZONTAL SCALE: 1:40 40 20wwskmw";—� CONTACTON2- L CENTER VERTICAL SCALE: V' SCALE.1 =4D CALL.1 PRIEll T.TANT �tN CAROBPUBLIC FAYETTEVILLE WORKS COMMISSION FAYETTEVILLE, NORTH CAROLINA CIVIL .. MAY 2019 N. JOHNSON 32463-000 DRAWN BY J. BARNAK PRELIMINARY DRAWING =°a ,r9Hc-uen CONTRAOT 01 CHECKED BY T. TART FOR REVIEW PURPOSES ONLY SEAL :NORTH 2 p HAI AND SAWYER FAYETTEVILLE PLAN AND PROFILE IRAWING PERMTMING 05/2019 NET —SNOT —A BAN y�'cIME d �/P 4011WESTCHASEBOULEVARD, SUITE 500 FORCE MAIN STA 28+00 TO 36+00 NUMBER 20% SU —TTAL 04/2019 N9IF I s r 5. JGN RALEIGH, NORTH CAROLINA 27607 PHASE 2 SECTION F COS R. 111TED FOR N LEING DATE BY CA LICENSE NO. :C-0381 nceweBx�vlPBiwnoBAs HI asowecio YTHEENnII'�airo ""S " T 82 L -VAT" OUR NO RMIS STOCINUE A— -D L—TION AT THE CONT—RC onreawlsBI NT o isoS PACY,. soOSSNISNE0 xs Pre TOPROTECTSOxi P`A"`oo�wAPRITTION "'ITNUCT" I.E. -.E. E­ TM a°uvi:l"s STO •ou IMUENT"' TE ws Eun _OR oAOB o s c cAnaxs' o os PHOTGO—H " "I"A NED N I`— NGS 4HE re 'RUrNENT �o FIR NF- ­ON GENERAL NOTES FAYETTEVILLE PUBLIC WORKS COMMISSION BATE GENERAL NOTES FAYETTEVILLE PUBLIC WORKS COMMISSION CAROB BATS PUBLIC WORKS COMMISSION FAYETTEVILLE N.C. ISBIGNE1 BY- N.JOHNSON FAYETTEVILLE, N.C. �tN =°a FEss'°e9 N.1 °Bz na.c. ..u. n+. nn+P .amrwm rer .isn. WATER RESOURCES ENGINEERING DEPARTMENT .. 32463-000 wry BY : rz N.1 On..�.iax n, nn,n .PPxrnRnxv .icr: WATER RESOURCES ENGINEERING DEPARTMENT $EAL GENERAL NOTES FAYt I IIVILLG UTILITY GENERAL NOTES PUBLIC WORKS COMMISSION PUBLIC WORKS COMMISSION BY FAYETTEVILLE N.C. ] (RESIDENT RELATIONS -REQUIRED) FAYETTEVILLE, N.C. N x IsH ET oA'12rE ,uw.O+.za+e APPreoxtn ay. .I.ec. WATER RESOURCES +Or+ oATe. yH_w.zoie APPBo�o er. Q.B.O. WATER RESOURCES ENGINEERING DEPARTMENT ENGINEERING DEPARTMENT T. TANT FAYETTEVILLE MAY 2019 CAROB HCen PUBLIC WORKS COMMISSION ISBIGNE1 BY- N.JOHNSON PRELIMINARY DRAWING �tN =°a FEss'°e9 FAYETTEVILLE, NORTH CAROLINA .. 32463-000 wry BY : J. BARNAK FOR REVIEW $EAL CDNTN­ NO, 01 rvKBO BY: T. TART PURPOSES ONLY y UJ19fi3� HAZEN AND SAWYER NORTH FAYETTEVILLE DETAILS 05/2019 NSj —5AaoOEsrvoT B +n• 1 yp/�'CINEE ���'� 4011 WESTCHASE BOULEVARD, SU ITE 500 FORCE MAIN M6ER 04/2019 rv9 MEABORE V TIEN IRANING i S P S �� RALEIGH, NORTH CAROLINA 27607 PHASE 2 SECTION F D01 ­ ISSUED FOR DATE . NOT TO FULL SCALE LICENSE NO.: G-0381 110I All,_ IIII�III- III � 1 GENERAL NOTES I FAYETTEVILLE FAYETTEVILLE FAYETTEVILLE SANITARY SEWER UTILITY PUBLIC WORKS COMMISSION STANDARD MANHOLE PUBLIC WORKS COMMISSION STANDARD MANHOLE PUBLIC WORKS COMMISSION T. IAIR EEI OITA L FAYETTEVILLE N.C. FAYETTEVILLE N.C. MO a FAYETTEVILLE N.C. S.1 WATER RESOURCES S.2 WATER RESOURCES 5.2 WATER RESOURCES r+ ENGINEERING DEPARTMENT , rz ENGINEERING DEPARTMENT Fz ENGINEERING DEPARTMENT ,. LREEORENENrs s. ,. REouiRENExTs s. D"'wcus ev: N.a. PI x�ss are au oli IxIcoM Locsl,rz'oL4 x,sra') x. - z. e. ^ LE oacl wEWEcuIHO ETA s.N=Felse 6. ER s. RFE V 1. W ?, ' DETAIL ��.p LBE aFAx AND IL OR �.! a. a. O V'PEI Xrz� siva N N�LE sxeTA ABLE o E5� LEEFRE 1 Naar u. - o 0 rtox5 ; R qua o N.LLBEBDEE o ,o�� 7 wLw xsTANo NErNL POl olONALREaIRENENie. O ALA. �RAODnorvALR� IR�Erv.6 E_ NNN TO ALIEN N 11 o ER ry ERTo T SECTION RAo BEDTIDN �ERIrvaE a� o G N. �,,r' AND aea aT E' VE EAwwc sTANOA.A o r eoc AsiNA,Xso.,xsD.IN. j jj �zs"oin.� CAM Loc soETaL SEE BE EL, FOR A N.ITI....DI.x. ELFcoNSTRucnox. -THE CONEAUN'DNC� aRicu Ax AI�(souo lsEE OETAIL saI El ,ESNELRcoxsraucnox, soiA. ITHI eRlcKuo LLi f1L COV ER SECTION �s.,v+s"� No— r I NArvxoLEOEraLsz N.T. E. INLEss�rF_ANEHOR'E' TO ETAN' rC e sTaNLEss s°': NA55Ro — -- ew rtAav ewes NORrAa. N CS AN "IN IF FI -11 IF4iANDUl NoarAa ervo I ft.YER LEss srEEL E Au yoAoPICK BAR ANO GASKETNBRORNE C ON vrsyseorvL P SERVEDETAIL rE V slmwGou Eov PPEVTACI¢o1 XIGX,eo AaaRT. scwrON RETE aour v esero eoTrwn oe Pias 1 NA4 CIA reRwL KerOA—Y uNLEI eNln cA vCLEo maL s„ roa RE. TI1Av (sAseoNLVIXw zs zs,re olA. al MI L INSTALUTIox c£l-FNT6rAcu. yp iANT EASN o o,,CONTRA _NeN�NETE 05, oxE NINaAoo�g pis o�. PRE.FTBE.— B aAoe o FRPME eRiss,wLLe olaeereo aveAVRwe. SECTIO cKArvo E ewssxnua _ c c. xo. sr sioNE FRAME SECTION rv.rs. DOGHOUSE MANHOLE FAYETTEVILLE NaeNO EATFAER DOGHOUSE MANHOLE FAYETTEVILLE s[ci N..s. FAYETTEVILLE MAINS 15" OR LESS PUBLIC WORKS COMMISSION MAINS 18" OR LARGER PUBLIC WORKS COMMISSION MANHOLE RING AND COVER PUBLIC WORKS COMMISSION ( ) ( ) WITH WIPER GASK gT AND CAM LOCK FAYETTEVILLE, N.C. b FAYETTEVILLE, N.C. FAYETTEVILLE, N.C. y� NIO r.s.53 WATER RESOURCES 55.3 WATER RESOURCES Nr5.8 o WATER RESOURCES orx ENGINEERING DEPARTMENT oEx ENGINEERING DEPARTMENT +oE, ENGINEERING DEPARTMENT T. TANT IBBIGNEI BY- N. JOHNSON PRELIMINARY DRAWINGDRA o�tH ESS o,A BY wN J. BARNAK FOR REVIEW $EAC CHECKED BY: T. TAINT PURPOSES ONLYIF �cINEE" 50$ 90<f SJO�� THIPBAR DOES NOT a +n• 1 NG IE Hazen HAZEN AND SAWYER 4011 WESTCHASE BOULEVARD, SUITE 500 RALEIGH, NORTH CAROLINA 27607 LICENSE NO.: C-0381 FAYETTEVILLE PUBLIC WORKS COMMISSION FAYETTEVILLE, NORTH CAROLINA NORTH FAYETTEVILLE FORCE MAIN PHASE 2 SECTION F DATE MAY 2019 HAEEN NO. 32463-000 CDNTAAFT NO, DETAILS NBER of D02 AL O'-UIL D ISTNEOL. D_KB T..... — —- PBaE —SM—S. BOIL reeeD IST - - C ATCUTR wnx emxFeEr. xTo urvOl eoJ sOIL �rz Nirv. PIAN YIEW � IDM ........ SELECT SEDDH.NATEIA NEW (Nlrv. a'1 BEOD NG FROM mENCn FR ExcAVAT ON L i ISEENOTEq BE Tu LIFE DIA.J DRD UND SBD PEE� R TG—B 111E—B 5¢ECT BEDDNOMATERwL GMVITY PIPING nxn CIHFORCE MAN SIDE VI sulx. ISOMETRIC VIEW OF STEP EaoLECTCOORDIxnioa) sEE rvo,Es. MATER IL FAYETTEVILLE FAYETTEVILLE STRUCTURE STEP PUBLIC WORKS COMMISSION SEWERBEDDING PUBLICWORKS COMMISSION B' FAYETTEVILLE, N.C. "' FAYETTEVILLE, N.C. xr S.SWATER RESOURCES S'13 WATER RESOURCES ENGINEERING DEPARTMENT ENGINEERING DEPARTMENT 7 FU 6— MEE—ATUNUNLESS " wACTicF EPH_E_T_E MH CONNEC„rON DESIGN GUIDE PUBLIC WORMI KS COMSSION "- FAYETTEVILLE, N.C. yy. $.iB WATER RESOURCES t�ZI ' DATE .uw.oi. rz0,e All—Der. L.E.Q. ENGINEERING DEPARTMENT OFFSET RING AND COVER FI—GRADE LEVELING RINGSE OFI(1 OAR %' ECA IN,MAI5 0 MANHOLE AND LALRGER MIN 8 -LID CLEARANCE REA LPRGER O MANHOLE E AB 3REQUIRED 3 ARNACUUMAR VALVE K AREA BEO LD CLEAR 3 ES NIPPLE 3 55 BALL VALVE j•. 3" E.S NIPPLE TOR OF FORCE MAIN A. EXT BASE FOR 5 0 MANHOLE 3" BRASS SADDLE TAP MONOLITHICALLY CAST W TH BASE SECTIONETEREOU RED FOR NMAN`EDHOLESBASE � 6TDEEP. TTTTT� i.�T�. soup --N-RE.-----M6 MIN. STONE BEDDING FOUNDATION COMPACTED SUBGRADE NOTES 1. CONTRACTORTO INSTALL vAILVE AND MANHOLE AT SUFFICIENT DEPTH TO ALLOW 2. FORCE MAW TO BE OFFSET IN MANHOLE TO KEEP AREA BELOW LID CLEAR. USE CAST 1. RUBBER _. EST. C=FORDNI-L.1-1 C.NN— INCLUDING 5. CARV MANHOLES DO NOT REQUIRE COPL TAR E%POVP C—G. AlRNACUUM & AIR RELEASE COMBINATION VALVEL MANHOLE DETTAIL Qoz s T. TANT N. JOHNSON QZN CARS(/ `Ess'°e9 Hazen FAYETTEVILLE PUBLIC WORKS COMMISSION FAYETTEVILLE, NORTH CAROLINA MAY 2019 DESGNBr .. 32463-000 B wN BY J. BARNAK PRELIMINARY DRAWING =°a —FACT 01 CHECKED BY: T.TANT FOR REVIEW PURPOSES ONLY SEAL BJ+sS z 2 — ER HPZEN AND SAWY NORTH FAYETTEVILLE DETAILS LING NUMBER: PERMTTTING 05/2019 IF THISBARI CO.NOT 0 ,rs 1 �'C)NEE H � <f 4011 WESTCHASE BOULEVARD, SU ITE 500 FORCE MAIN oa/zTto INGI � S. dG� 27607 RALEIGH,LICENSE PHASE 2 SECTION F D03 MEv 11UFD FOR DATE BY NOT TO FULL SCALEB .: C-0 81 LICENSE NO.: C-0381 I-FINTE AT ALL NN- G' NADG ENTRANCE/EXITLVNM ANE. MAIH,TEMANGE MG=<EE PRGwEG EC -2 SAN: MAND, MISEE oEIA) DIVERSION � 1 (BOTH SIDES) ELEVATION ONAGUNE (TIMBER) MAT (SEE NOTE 17) 1 < < G < < < V vy n vln MIN TOP OF SINX_ L < FLOW —CHANNEL —1 G TOP GFGANM rl v n LLV SILTFENCE,TYP_ < < < < < suRFAce POW DIVERSION PLAN RxNMG .RE S : DR= GME MGWN N1RR -IN ENTH UNAX aLr HE SOFT, z 1. IRE FEIDW SFII ST9E ST" STIONNBE AI LEAsi NO GACf MM A MHlwu Cf 6 ME MREs MM �Y HEB PNERG, sBnEG. _ BE GfiS'T to N.. To THE DITMG 5TAN SILT FGKS 11 GXSE IT CAFAITA TNN) IG REN VER1ICMIL (21 [PE) — F1 PUNS AT THE - GF SLORS A" BE GAII 11A11 rs MEZRMC SKS mNB-UX. FGM —AL ICLNMnGAnoN LF —NA—11 sxsTA ANDD AH.1 AREA — NGN BE GREARM Tx.w v. AraE FER TGG Tr ov TO,cE HIGH HAZARD ERGSIGM AxP sEwMNT coITLL —KN ENG GERGN MANUAL. °"" L0fltl1A TEMPORARY SILT FENCE .1. GF --- RG..A.R.3.MN3. GITG �. MARR.An GB G EB GMABTB I EC -5 TEMPORARY STREAM CROSSING BY DRAGLINE MATS 1, KEEP CL�AISNG AND ENCAVATION OF THE SHIRCANT SANNSAND BED AND APPROACH SECTIONS TOA MIN MUM 2 HELPN. PLACETO SaEDI EBYCUTTINGNOTGRUSTU BBING. THE ROOTS AND MPS SHALL BE LEFT IN CLE 3 GH(MINIMUM)LIPALONG III OUTSIDEOFTHE BRIOGEMATTO PREVENT LOOSE SEDIMENT PROM 11—TING IN STREANT 1— CRISSING 4IN FALL SILT FENCE ALONG TOPS OF BANKS AND TIE TO CROSSING. THE STR 1, 11 IIRE-I-IIINIIIRII"TIILEI-TIEI-11*. �ITNICKLAYER _G1 OF �S FEET THE IN: PW THERSPORkIP OR OTHER SUITABLE MEANS IF DESIGN VS-OCITY EXCEEDS THE ALLONVABLE FOR LA IL 10 PLACE MATS BE EN -BU MPER TREES' AND ANCHY� ON BOTH BANKS TO TREES OR DEADMAN AT MIT N IMUM BRIDGE WIDTH _ HT 11. ENSURE THAT IN (MINIMUM) OF THE MAT TOTAL LENGTH IS SUPPORTED ON EACH SIDE OF THE BANK. rvNN� 11 INSTALL WATER 1l1RSK)N DEVICES ON BOTH SIDES 01 THE CROSSING 13 REMOVE TEMPORARY STREAM CROBSINGS M— WHEN IFT11 ARE NO LONGER NEEDED. 1 EAM CH NEL TO ITS ORIGINAL CROSSSECnON, AND SMOOTH AND APPROPRIATELY �d mlulxum_ STABIL ALL DIS UPS 11 ANY IN -STREAM SEDIM: -C::.L MEASUREA FST BE REMOVED UPON STIBILIBATION OF THE BA III THE SYS— LIST AND THE BRIDGE MUST HAve A e INCH uP AS S—FIIeD IN NOTBE RLDLY PLATE EVEIR ONE . NT TER_ E a (ABOVE)G THRouGH THE BRIDGE TEMPORARY VEHICULAR STREAM CROSSING BY DRAGLINE MAT (BRIDGEMAT) 0227019R FENCING FABRIC ORANGE MIRABAFE (/ E STINGTREE META—"POST O OR WOODEN 2X4 APPROVED EQUAL. STAPLETO VERTICAL 2. OR TIE TO METAL T POSTS. ENSTING MAINTENANCE REQUIREMENTS: GRADE 1 PRODUCIWFF NGII 0 INCHLY AN MOREOFRRAAINNFALL 10—SPACING 2. REPAIR OR RELACE DAMAGED FENCING IMMEDIATELY. PD-To-PoST 3. REPLACE ANY DAMAGED SIGNAGE IMMEDIATELY AS NOTES: NEEDED. 1 PLACE CONTINUOUSRUN 01 FENCE MATERIAL IN ECITH 0 SIDES OF IMMEDIATE WORK ZONE IN WOODED AREAS AS SHOWNONTHEPLANS. DONOTATTACHFENCE MATERIALTOTREES. NO TRESPASSING 2. TREE PROTECTION FENCING FABRIC TO BE PLACED AT TREE PROTECTION AREA PROTECTED.E OF THE TREES THAT ARE TO BE PROHIBIDO ENTRAR 3 'MINAE— HIGH STRENGTH POLYMER GEOGRID FABRIC ZONA PROTECTORA PARA BY MI AI CONSTRUCTION PRODUCTS, PENDERGRAGE, LOS ARBOLES SHALLLLL REPER S AS SHOWGRO OF TREE To PROTECTION HE RIGH ory FENCING WARNING SIGN DETAIL 3•^ TREE PROTECTION BARRIER FENCE 0227033R CONTRACTOR SHALL EXERCISE CAUTION NOT TO BURST OR WHEN PUMPING. THE LENGTH AND WIDTH of THE TEMPORARY SEDIMENT BA VENDoR SPECIFICATIONS. TEMPORARY SEDIMENT FILTER BAGS SHALL BE EQUIPPED W MAINTENANCE REDUIREMENTS: I. GPE 'N` THE SED MENT FELT ..IF BAG SHALL BE aEPAIaeD IMMEOIATELr�All RAINFALL EVENT PRODUCIG } Irvcn oR moRE or w,Iry Arvr DAMAGE r 2. TEMPORARY SEDIMENT FILTER BAG SHALL BE REPLACED WHEN 61NCHES OF SEDIMENT HAS ACCUMULATED OR IN —ORDANCE WITH THE MANIFFACTURERS RECOMMENDITIONS. (qac xzax,aa 3. MONROR SEDIMENT FILTER BAG REGULARLY FOR THE PRESENCE OF TURBID WATER BEING DISCHARGED. ANY T— WATER BEING I:CHARGED FROM THE BAG =HALL BE RESQLIED IMMEDIATELr. IHTEMPQRARr BLOCKAGES ARE NOT FOUND, ASSUME THE BAG IS AT SEDIMENT CAPACITY AND REPLACE IMMEDIATELY. NUNE L, GPF aMl MRTH�11GT E7VT HE LNE PREANAT TOP VIEW (xTH ae N_ __T.. e SIDE VIEW TEMPORA 0LTER EASE 227038 R :RILES 'ER T. TAINT FAYETTEVILLE MAY 2019 CAROB Hcen PUBLIC WORKS COMMISSION - N.JOHNSON �tN PRELIMINARY DRAWING =°a FEss'o �9 "% FAYETTEVILLE, NORTH CAROLINA .. 32463-000 DRAWN BY : J. BARNAK FOR REVIEW SEAL EROSION CONTROL CDNTNACT NO,. 01 CHECKED KED BY: T. TANT PURPOSES ONLY n3uw g HAZEN AND SAWYER FAYETTEVILLE DETAILS ­NORTH 05/2019 ST y�'c)ME d`' 4011 WESTCHASE BOULEVARD, SU ITE 500 FORCE MAIN NH MBER 04/2019 rv53 INGI S C — 1 <P 5. JQ� RALEIGH, NORTH CAROLINA 27607 PHASE 2 SECTION F D04 LICENSE NO.: G-0381 PRELIMINARY JURISDICTIONAL DETERMINATION (PJD) FORM BACKGROUND INFORMATION A. REPORT COMPLETION DATE FOR PJD: 06/25/2019 B. NAME AND ADDRESS OF PERSON REQUESTING PJD: City of Fayetteville, Joseph Glass, 955 Old Wilmington Road, Fayetteville, NC 28301 C. DISTRICT OFFICE, FILE NAME, AND NUMBER: Wilmington District, North Fayetteville Force Main_City of Fayetteville - Public Works_Tokay Dr_Zepher Dr, SAW-2017-02526 D. PROJECT LOCATION(S) AND BACKGROUND INFORMATION: The project area is located east of Sherman Drive, north of Hoffer Drive, south of Stone Way Court, and west of the Cape Fear River in Fayetteville, Cumberland County, NC. (USE THE TABLE BELOW TO DOCUMENT MULTIPLE AQUATIC RESOURCES AND/OR AQUATIC RESOURCES AT DIFFERENT SITES) State: NC County: Cumberland City: Fayetteville Center coordinates of site (lat/long in degree decimal format): Latitude: 35.086356 Longitude: -78.871381 Universal Transverse Mercator: Name of nearest waterbody: Cape Fear River E. REVIEW PERFORMED FOR SITE EVALUATION (CHECK ALL THAT APPLY): Office (Desk) Determination. Date: Field Determination. Date(s): TABLE OF AQUATIC RESOURCES IN REVIEW AREA WHICH "MAY BE" SUBJECT TO REGULATORY JURISDICTION. Site Number Latitude (decimal degrees) Longitude (decimal degrees) Estimated amount of aquatic resources in review area (acreage and linear feet, if applicable Type of aquatic resources (i.e., wetland vs. non- wetland waters) Geographic authority to which the aquatic resource “may be” subject (i.e., Section 404 or Section 10/404) S1 35.087 -78.871 100 lf Non-wetland waters 10/404 S2 35.086 -78.870 100 lf Non-wetland waters 10/404 S3 35.086 -78.868 100 lf Non-wetland waters 10/404 W1 35.086 -78.872 0.5-ac Wetland 10/404 1) The Corps of Engineers believes that there may be jurisdictional aquatic resources in the review area, and the requestor of this PJD is hereby advised of his or her option to request and obtain an approved JD (AJD) for that review area based on an informed decision after having discussed the various types of JDs and their characteristics and circumstances when they may be appropriate. 2) In any circumstance where a permit applicant obtains an individual permit, or a Nationwide General Permit (NWP) or other general permit verification requiring "pre- construction notification" (PCN), or requests verification for a non-reporting NWP or other general permit, and the permit applicant has not requested an AJD for the activity, the permit applicant is hereby made aware that: (1) the permit applicant has elected to seek a permit authorization based on a PJD, which does not make an official determination of jurisdictional aquatic resources; (2) the applicant has the option to request an AJD before accepting the terms and conditions of the permit authorization, and that basing a permit authorization on an AJD could possibly result in less compensatory mitigation being required or different special conditions; (3) the applicant has the right to request an individual permit rather than accepting the terms and conditions of the NWP or other general permit authorization; (4) the applicant can accept a permit authorization and thereby agree to comply with all the terms and conditions of that permit, including whatever mitigation requirements the Corps has determined to be necessary; (5) undertaking any activity in reliance upon the subject permit authorization without requesting an AJD constitutes the applicant's acceptance of the use of the PJD; (6) accepting a permit authorization (e.g., signing a proffered individual permit) or undertaking any activity in reliance on any form of Corps permit authorization based on a PJD constitutes agreement that all aquatic resources in the review area affected in any way by that activity will be treated as jurisdictional, and waives any challenge to such jurisdiction in any administrative or judicial compliance or enforcement action, or in any administrative appeal or in any Federal court; and (7) whether the applicant elects to use either an AJD or a PJD, the JD will be processed as soon as practicable. Further, an AJD, a proffered individual permit (and all terms and conditions contained therein), or individual permit denial can be administratively appealed pursuant to 33 C.F.R. Part 331. If, during an administrative appeal, it becomes appropriate to make an official determination whether geographic jurisdiction exists over aquatic resources in the review area, or to provide an official delineation of jurisdictional aquatic resources in the review area, the Corps will provide an AJD to accomplish that result, as soon as is practicable. This PJD finds that there "may be" waters of the U.S. and/or that there "may be" navigable waters of the U.S. on the subject review area, and identifies all aquatic features in the review area that could be affected by the proposed activity, based on the following information: SUPPORTING DATA. Data reviewed for PJD (check all that apply) Checked items should be included in subject file. Appropriately reference sources below where indicated for all checked items: Maps, plans, plots or plat submitted by or on behalf of the PJD requestor: Map: Figure 4: Site Impact Overview Map Data sheets prepared/submitted by or on behalf of the PJD requestor. Office concurs with data sheets/delineation report. Office does not concur with data sheets/delineation report. Rationale: Data sheets prepared by the Corps: Corps navigable waters' study: U.S. Geological Survey Hydrologic Atlas: USGS NHD data. USGS 8 and 12 digit HUC maps. U.S. Geological Survey map(s). Cite scale & quad name: 1:24k, Vander, NC Natural Resources Conservation Service Soil Survey. Citation: NRCS Web Soil Survey National wetlands inventory map(s). Cite name: USFWS Online Wetland Mapper State/local wetland inventory map(s): FEMA/FIRM maps: FEMA.gov 100-year Floodplain Elevation is: (National Geodetic Vertical Datum of 1929) Photographs: Aerial (Name & Date): or Other (Name & Date): Previous determination(s). File no. and date of response letter: Other information (please specify): IMPORTANT NOTE: The information recorded on this form has not necessarily been verified by the Corps and should not be relied upon for later jurisdictional determinations. Signature and date of Regulatory staff member completing PJD 06/25/2019 Signature and date of person requesting PJD (REQUIRED, unless obtaining the signature is impracticable) 1 1 Districts may establish timeframes for requester to return signed PJD forms. If the requester does not respond within the established time frame, the district may presume concurrence and no additional follow up is necessary prior to finalizing an action. GREER.EMILY.C .1385325300 Digitally signed by GREER.EMILY.C.1385325300 Date: 2019.06.25 17:07:46 -04'00' SAW-2017-02526 Determination of Jurisdiction: A. There are waters, including wetlands on the above described project area that may be subject to Section 404 of the Clean Water Act (CWA) (33 USC § 1344) and/or Section 10 of the Rivers and Harbors Act (RHA) (33 USC § 403). This preliminary determination is not an appealable action under the Regulatory Program Administrative Appeal Process (Reference 33 CFR Part 331). However, you may request an approved JD, which is an appealable action, by contacting the Corps district for further instruction. Please note, if work is authorized by either a general or nationwide permit, and you wish to request an appeal of an approved JD, the appeal must be received by the Corps and the appeal process concluded prior to the commencement of any work in waters of the United States and prior to any work that could alter the hydrology of waters of the United States. B. There are Navigable Waters of the United States within the above described project area subject to the permit requirements of Section 10 of the Rivers and Harbors Act (RHA) (33 USC § 403) and Section 404 of the Clean Water Act (CWA) (33 USC § 1344). Unless there is a change in the law or our published regulations, this determination may be relied upon for a period not to exceed five years from the date of this notification. C. There are waters, including wetlands within the above described project area that are subject to the permit requirements of Section 404 of the Clean Water Act (CWA) (33 USC § 1344). Unless there is a change in the law or our published regulations, this determination may be relied upon for a period not to exceed five years from the date of this notification. D. The jurisdictional areas within the above described project area have been identified under a previous action. Please reference jurisdictional determination issued DATE. Action ID: FILE NUMBER. Basis For Determination: See the preliminary jurisdictional determination form dated 06/25/2019. Remarks: None. E. Attention USDA Program Participants This delineation/determination has been conducted to identify the limits of Corps’ Clean Water Act jurisdiction for the particular site identified in this request. The delineation/determination may not be valid for the wetland conservation provisions of the Food Security Act of 1985. If you or your tenant are USDA Program participants, or anticipate participation in USDA programs, you should request a certified wetland determination from the local office of the Natural Resources Conservation Service, prior to starting work. F. Appeals Information (This information applies only to approved jurisdiction determinations as indicated in B and C above). This correspondence constitutes an approved jurisdiction determination for the above described site. If you object to this determination, you may request an administrative appeal under Corps regulations at 33 CFR Part 331. Enclosed you will find a Notification of Appeal Process (NAP) fact sheet and request for appeal (RFA) form. If you request to appeal this determination you must submit a completed RFA form to the following address: US Army Corps of Engineers South Atlantic Division Attn: Jason Steele, Review Officer 60 Forsyth Street SW, Room 10M15 Atlanta, Georgia 30303-8801 Phone: (404) 562-5137 In order for an RFA to be accepted by the Corps, the Corps must determine that it is complete, that it meets the criteria for appeal under 33 CFR part 331.5, and that it has been received by the Division Office within 60 days of the date of the NAP. Should you decide to submit an RFA form, it must be received at the above address by Not applicable. **It is not necessary to submit an RFA form to the Division Office if you do not object to the determination in this correspondence.** Corps Regulatory Official: ______________________________________________________ Emily Greer Date of JD: 06/25/2019 Expiration Date of JD: Not applicable GREER.EMILY.C.1385325300 Digitally signed by GREER.EMILY.C.1385325300 Date: 2019.06.25 17:08:12 -04'00' S1 ImpactsDepicted on Figure 5Wetland ImpactsDepicted on Figures 6 and 7Wetland ImpactsDepicted on Figures 6 and 7S2Depicted on Figure 8S3Depicted on Figure 90300600150FeetFigure 4SITE IMPACT OVERVIEW MAPNorth Fayetteville Force MainPhase 2 Section FFayetteville, NC1 inch = 300 feetSCALE/PUBLIC WORKS COMMISSIONCITY OF FAYETTEVILLE, NCLimits of DisturbanceImpact Figures 1 NATIONWIDE PERMIT 12 DEPARTMENT OF THE ARMY CORPS OF ENGINEERS FINAL NOTICE OF ISSUANCE AND MODIFICATION OF NATIONWIDE PERMITS FEDERAL REGISTER AUTHORIZED MARCH 19, 2017 Utility Line Activities. Activities required for the construction, maintenance, repair, and removal of utility lines and associated facilities in waters of the United States, provided the activity does not result in the loss of greater than 1/2-acre of waters of the United States for each single and complete project. Utility lines: This NWP authorizes discharges of dredged or fill material into waters of the United States and structures or work in navigable waters for crossings of those waters associated with the construction, maintenance, or repair of utility lines, including outfall and intake structures. There must be no change in pre-construction contours of waters of the United States. A “utility line” is defined as any pipe or pipeline for the transportation of any gaseous, liquid, liquescent, or slurry substance, for any purpose, and any cable, line, or wire for the transmission for any purpose of electrical energy, telephone, and telegraph messages, and internet, radio, and television communication. The term “utility line” does not include activities that drain a water of the United States, such as drainage tile or french drains, but it does apply to pipes conveying drainage from another area. Material resulting from trench excavation may be temporarily sidecast into waters of the United States for no more than three months, provided the material is not placed in such a manner that it is dispersed by currents or other forces. The district engineer may extend the period of temporary side casting for no more than a total of 180 days, where appropriate. In wetlands, the top 6 to 12 inches of the trench should normally be backfilled with topsoil from the trench. The trench cannot be constructed or backfilled in such a manner as to drain waters of the United States (e.g., backfilling with extensive gravel layers, creating a french drain effect). Any exposed slopes and stream banks must be stabilized immediately upon completion of the utility line crossing of each waterbody. Utility line substations: This NWP authorizes the construction, maintenance, or expansion of substation facilities associated with a power line or utility line in non-tidal waters of the United States, provided the activity, in combination with all other activities included in one single and complete project, does not result in the loss of greater than 1/2-acre of waters of the United States. This NWP does not authorize discharges into non-tidal wetlands adjacent to tidal waters of the United States to construct, maintain, or expand substation facilities. Foundations for overhead utility line towers, poles, and anchors: This NWP authorizes the construction or maintenance of foundations for overhead utility line towers, poles, and anchors in all waters of the United States, provided the foundations are the minimum size necessary and separate footings for each tower leg (rather than a larger single pad) are used where feasible. 2 Access roads: This NWP authorizes the construction of access roads for the construction and maintenance of utility lines, including overhead power lines and utility line substations, in non-tidal waters of the United States, provided the activity, in combination with all other activities included in one single and complete project, does not cause the loss of greater than 1/2-acre of non-tidal waters of the United States. This NWP does not authorize discharges into non-tidal wetlands adjacent to tidal waters for access roads. Access roads must be the minimum width necessary (see Note 2, below). Access roads must be constructed so that the length of the road minimizes any adverse effects on waters of the United States and must be as near as possible to pre-construction contours and elevations (e.g., at grade corduroy roads or geotextile/gravel roads). Access roads constructed above pre-construction contours and elevations in waters of the United States must be properly bridged or culverted to maintain surface flows. This NWP may authorize utility lines in or affecting navigable waters of the United States even if there is no associated discharge of dredged or fill material (See 33 CFR part 322). Overhead utility lines constructed over section 10 waters and utility lines that are routed in or under section 10 waters without a discharge of dredged or fill material require a section 10 permit. This NWP authorizes, to the extent that Department of the Army authorization is required, temporary structures, fills, and work necessary for the remediation of inadvertent returns of drilling fluids to waters of the United States through sub-soil fissures or fractures that might occur during horizontal directional drilling activities conducted for the purpose of installing or replacing utility lines. These remediation activities must be done as soon as practicable, to restore the affected waterbody. District engineers may add special conditions to this NWP to require a remediation plan for addressing inadvertent returns of drilling fluids to waters of the United States during horizontal directional drilling activities conducted for the purpose of installing or replacing utility lines. This NWP also authorizes temporary structures, fills, and work, including the use of temporary mats, necessary to conduct the utility line activity. Appropriate measures must be taken to maintain normal downstream flows and minimize flooding to the maximum extent practicable, when temporary structures, work, and discharges, including cofferdams, are necessary for construction activities, access fills, or dewatering of construction sites. Temporary fills must consist of materials, and be placed in a manner, that will not be eroded by expected high flows. After construction, temporary fills must be removed in their entirety and the affected areas returned to pre-construction elevations. The areas affected by temporary fills must be revegetated, as appropriate. Notification: The permittee must submit a pre-construction notification to the district engineer prior to commencing the activity if any of the following criteria are met: (1) the activity involves mechanized land clearing in a forested wetland for the utility line right-of-way; (2) a section 10 permit is required; (3) the utility line in waters of the United States, excluding overhead lines, exceeds 500 feet; (4) the utility line is placed within a jurisdictional area (i.e., water of the United States), and it runs parallel to or along a stream bed that is within that jurisdictional area; (5) discharges that result in the loss of greater than 1/10-acre of waters of the United States; (6) permanent access roads are constructed above 3 grade in waters of the United States for a distance of more than 500 feet; or (7) permanent access roads are constructed in waters of the United States with impervious materials. (See general condition 32.) (Authorities: Sections 10 and 404) Note 1: Where the utility line is constructed or installed in navigable waters of the United States (i.e., section 10 waters) within the coastal United States, the Great Lakes, and United States territories, a copy of the NWP verification will be sent by the Corps to the National Oceanic and Atmospheric Administration (NOAA), National Ocean Service (NOS), for charting the utility line to protect navigation. Note 2: For utility line activities crossing a single waterbody more than one time at separate and distant locations, or multiple waterbodies at separate and distant locations, each crossing is considered a single and complete project for purposes of NWP authorization. Utility line activities must comply with 33 CFR 330.6(d). Note 3: Utility lines consisting of aerial electric power transmission lines crossing navigable waters of the United States (which are defined at 33 CFR part 329) must comply with the applicable minimum clearances specified in 33 CFR 322.5(i). Note 4: Access roads used for both construction and maintenance may be authorized, provided they meet the terms and conditions of this NWP. Access roads used solely for construction of the utility line must be removed upon completion of the work, in accordance with the requirements for temporary fills. Note 5: Pipes or pipelines used to transport gaseous, liquid, liquescent, or slurry substances over navigable waters of the United States are considered to be bridges, not utility lines, and may require a permit from the U.S. Coast Guard pursuant to section 9 of the Rivers and Harbors Act of 1899. However, any discharges of dredged or fill material into waters of the United States associated with such pipelines will require a section 404 permit (see NWP 15). Note 6: This NWP authorizes utility line maintenance and repair activities that do not qualify for the Clean Water Act section 404(f) exemption for maintenance of currently serviceable fills or fill structures. Note 7: For overhead utility lines authorized by this NWP, a copy of the PCN and NWP verification will be provided to the Department of Defense Siting Clearinghouse, which will evaluate potential effects on military activities. Note 8: For NWP 12 activities that require pre-construction notification, the PCN must include any other NWP(s), regional general permit(s), or individual permit(s) used or intended to be used to authorize any part of the proposed project or any related activity, including other separate and distant crossings that require Department of the Army authorization but do not require pre-construction notification (see paragraph (b) of general condition 32). The district engineer will evaluate the PCN in accordance with Section D, “District Engineer’s Decision.” The district engineer may require mitigation to ensure that the authorized activity results in no more than minimal individual and cumulative adverse environmental effects (see general condition 23). 4 NATIONWIDE PERMIT GENERAL CONDITIONS The following General Conditions must be followed in order for any authorization by a NWP to be valid: 1. Navigation. (a) No activity may cause more than a minimal adverse effect on navigation. (b) Any safety lights and signals prescribed by the U.S. Coast Guard, through regulations or otherwise, must be installed and maintained at the permittee's expense on authorized facilities in navigable waters of the United States. (c) The permittee understands and agrees that, if future operations by the United States require the removal, relocation, or other alteration, of the structure or work herein authorized, or if, in the opinion of the Secretary of the Army or his authorized representative, said structure or work shall cause unreasonable obstruction to the free navigation of the navigable waters, the permittee will be required, upon due notice from the Corps of Engineers, to remove, relocate, or alter the structural work or obstructions caused thereby, without expense to the United States. No claim shall be made against the United States on account of any such removal or alteration. 2. Aquatic Life Movements. No activity may substantially disrupt the necessary life cycle movements of those species of aquatic life indigenous to the waterbody, including those species that normally migrate through the area, unless the activity's primary purpose is to impound water. All permanent and temporary crossings of waterbodies shall be suitably culverted, bridged, or otherwise designed and constructed to maintain low flows to sustain the movement of those aquatic species. If a bottomless culvert cannot be used, then the crossing should be designed and constructed to minimize adverse effects to aquatic life movements. 3. Spawning Areas. Activities in spawning areas during spawning seasons must be avoided to the maximum extent practicable. Activities that result in the physical destruction (e.g., through excavation, fill, or downstream smothering by substantial turbidity) of an important spawning area are not authorized. 4. Migratory Bird Breeding Areas. Activities in waters of the United States that serve as breeding areas for migratory birds must be avoided to the maximum extent practicable. 5. Shellfish Beds. No activity may occur in areas of concentrated shellfish populations, unless the activity is directly related to a shellfish harvesting activity authorized by NWPs 4 and 48, or is a shellfish seeding or habitat restoration activity authorized by NWP 27. 6. Suitable Material. No activity may use unsuitable material (e.g., trash, debris, car bodies, asphalt, etc.). Material used for construction or discharged must be free from toxic pollutants in toxic amounts (see section 307 of the Clean Water Act). 5 7. Water Supply Intakes. No activity may occur in the proximity of a public water supply intake, except where the activity is for the repair or improvement of public water supply intake structures or adjacent bank stabilization. 8. Adverse Effects From Impoundments. If the activity creates an impoundment of water, adverse effects to the aquatic system due to accelerating the passage of water, and/or restricting its flow must be minimized to the maximum extent practicable. 9. Management of Water Flows. To the maximum extent practicable, the pre- construction course, condition, capacity, and location of open waters must be maintained for each activity, including stream channelization, storm water management activities, and temporary and permanent road crossings, except as provided below. The activity must be constructed to withstand expected high flows. The activity must not restrict or impede the passage of normal or high flows, unless the primary purpose of the activity is to impound water or manage high flows. The activity may alter the pre-construction course, condition, capacity, and location of open waters if it benefits the aquatic environment (e.g., stream restoration or relocation activities). 10. Fills Within 100-Year Floodplains. The activity must comply with applicable FEMA-approved state or local floodplain management requirements. 11. Equipment. Heavy equipment working in wetlands or mudflats must be placed on mats, or other measures must be taken to minimize soil disturbance. 12. Soil Erosion and Sediment Controls. Appropriate soil erosion and sediment controls must be used and maintained in effective operating condition during construction, and all exposed soil and other fills, as well as any work below the ordinary high water mark or high tide line, must be permanently stabilized at the earliest practicable date. Permittees are encouraged to perform work within waters of the United States during periods of low-flow or no-flow, or during low tides. 13. Removal of Temporary Fills. Temporary fills must be removed in their entirety and the affected areas returned to pre-construction elevations. The affected areas must be revegetated, as appropriate. 14. Proper Maintenance. Any authorized structure or fill shall be properly maintained, including maintenance to ensure public safety and compliance with applicable NWP general conditions, as well as any activity-specific conditions added by the district engineer to an NWP authorization. 15. Single and Complete Project. The activity must be a single and complete project. The same NWP cannot be used more than once for the same single and complete project. 16. Wild and Scenic Rivers. (a) No NWP activity may occur in a component of the National Wild and Scenic River System, or in a river officially designated by Congress as a “study river” for possible inclusion in the system while the river is in an official study status, 6 unless the appropriate Federal agency with direct management responsibility for such river, has determined in writing that the proposed activity will not adversely affect the Wild and Scenic River designation or study status. (b) If a proposed NWP activity will occur in a component of the National Wild and Scenic River System, or in a river officially designated by Congress as a “study river” for possible inclusion in the system while the river is in an official study status, the permittee must submit a pre-construction notification (see general condition 32). The district engineer will coordinate the PCN with the Federal agency with direct management responsibility for that river. The permittee shall not begin the NWP activity until notified by the district engineer that the Federal agency with direct management responsibility for that river has determined in writing that the proposed NWP activity will not adversely affect the Wild and Scenic River designation or study status. (c) Information on Wild and Scenic Rivers may be obtained from the appropriate Federal land management agency responsible for the designated Wild and Scenic River or study river (e.g., National Park Service, U.S. Forest Service, Bureau of Land Management, U.S. Fish and Wildlife Service). Information on these rivers is also available at: http://www.rivers.gov/. 17. Tribal Rights. No NWP activity may cause more than minimal adverse effects on tribal rights (including treaty rights), protected tribal resources, or tribal lands. 18. Endangered Species. (a) No activity is authorized under any NWP which is likely to directly or indirectly jeopardize the continued existence of a threatened or endangered species or a species proposed for such designation, as identified under the Federal Endangered Species Act (ESA), or which will directly or indirectly destroy or adversely modify the critical habitat of such species. No activity is authorized under any NWP which “may affect” a listed species or critical habitat, unless ESA section 7 consultation addressing the effects of the proposed activity has been completed. Direct effects are the immediate effects on listed species and critical habitat caused by the NWP activity. Indirect effects are those effects on listed species and critical habitat that are caused by the NWP activity and are later in time, but still are reasonably certain to occur. (b) Federal agencies should follow their own procedures for complying with the requirements of the ESA. If pre-construction notification is required for the proposed activity, the Federal permittee must provide the district engineer with the appropriate documentation to demonstrate compliance with those requirements. The district engineer will verify that the appropriate documentation has been submitted. If the appropriate documentation has not been submitted, additional ESA section 7 consultation may be necessary for the activity and the respective federal agency would be responsible for fulfilling its obligation under section 7 of the ESA. (c) Non-federal permittees must submit a pre-construction notification to the district engineer if any listed species or designated critical habitat might be affected or is in the vicinity of the activity, or if the activity is located in designated critical habitat, and shall not begin work on the activity until notified by the district engineer that the requirements of the ESA have been satisfied and that the activity is authorized. For activities that might affect Federally-listed endangered or threatened species or designated critical habitat, the pre- construction notification must include the name(s) of the endangered or threatened species that 7 might be affected by the proposed activity or that utilize the designated critical habitat that might be affected by the proposed activity. The district engineer will determine whether the proposed activity “may affect” or will have “no effect” to listed species and designated critical habitat and will notify the non- Federal applicant of the Corps’ determination within 45 days of receipt of a complete pre- construction notification. In cases where the non-Federal applicant has identified listed species or critical habitat that might be affected or is in the vicinity of the activity, and has so notified the Corps, the applicant shall not begin work until the Corps has provided notification that the proposed activity will have “no effect” on listed species or critical habitat, or until ESA section 7 consultation has been completed. If the non-Federal applicant has not heard back from the Corps within 45 days, the applicant must still wait for notification from the Corps. (d) As a result of formal or informal consultation with the FWS or NMFS the district engineer may add species-specific permit conditions to the NWPs. (e) Authorization of an activity by an NWP does not authorize the “take” of a threatened or endangered species as defined under the ESA. In the absence of separate authorization (e.g., an ESA Section 10 Permit, a Biological Opinion with “incidental take” provisions, etc.) from the FWS or the NMFS, the Endangered Species Act prohibits any person subject to the jurisdiction of the United States to take a listed species, where "take" means to harass, harm, pursue, hunt, shoot, wound, kill, trap, capture, or collect, or to attempt to engage in any such conduct. The word “harm” in the definition of “take'' means an act which actually kills or injures wildlife. Such an act may include significant habitat modification or degradation where it actually kills or injures wildlife by significantly impairing essential behavioral patterns, including breeding, feeding or sheltering. (f) If the non-federal permittee has a valid ESA section 10(a)(1)(B) incidental take permit with an approved Habitat Conservation Plan for a project or a group of projects that includes the proposed NWP activity, the non-federal applicant should provide a copy of that ESA section 10(a)(1)(B) permit with the PCN required by paragraph (c) of this general condition. The district engineer will coordinate with the agency that issued the ESA section 10(a)(1)(B) permit to determine whether the proposed NWP activity and the associated incidental take were considered in the internal ESA section 7 consultation conducted for the ESA section 10(a)(1)(B) permit. If that coordination results in concurrence from the agency that the proposed NWP activity and the associated incidental take were considered in the internal ESA section 7 consultation for the ESA section 10(a)(1)(B) permit, the district engineer does not need to conduct a separate ESA section 7 consultation for the proposed NWP activity. The district engineer will notify the non-federal applicant within 45 days of receipt of a complete pre-construction notification whether the ESA section 10(a)(1)(B) permit covers the proposed NWP activity or whether additional ESA section 7 consultation is required. (g) Information on the location of threatened and endangered species and their critical habitat can be obtained directly from the offices of the FWS and NMFS or their world wide web pages at http://www.fws.gov/ or http://www.fws.gov/ipac and http://www.nmfs.noaa.gov/pr/species/esa/ respectively. 19. Migratory Birds and Bald and Golden Eagles. The permittee is responsible for ensuring their action complies with the Migratory Bird Treaty Act and the Bald and Golden Eagle Protection Act. The permittee is responsible for contacting appropriate local office of the U.S. Fish and Wildlife Service to determine applicable measures to reduce impacts to migratory 8 birds or eagles, including whether “incidental take” permits are necessary and available under the Migratory Bird Treaty Act or Bald and Golden Eagle Protection Act for a particular activity. 20. Historic Properties. (a) In cases where the district engineer determines that the activity may have the potential to cause effects to properties listed, or eligible for listing, in the National Register of Historic Places, the activity is not authorized, until the requirements of Section 106 of the National Historic Preservation Act (NHPA) have been satisfied. (b) Federal permittees should follow their own procedures for complying with the requirements of section 106 of the National Historic Preservation Act. If pre-construction notification is required for the proposed NWP activity, the Federal permittee must provide the district engineer with the appropriate documentation to demonstrate compliance with those requirements. The district engineer will verify that the appropriate documentation has been submitted. If the appropriate documentation is not submitted, then additional consultation under section 106 may be necessary. The respective federal agency is responsible for fulfilling its obligation to comply with section 106. (c) Non-federal permittees must submit a pre-construction notification to the district engineer if the NWP activity might have the potential to cause effects to any historic properties listed on, determined to be eligible for listing on, or potentially eligible for listing on the National Register of Historic Places, including previously unidentified properties. For such activities, the pre-construction notification must state which historic properties might have the potential to be affected by the proposed NWP activity or include a vicinity map indicating the location of the historic properties or the potential for the presence of historic properties. Assistance regarding information on the location of, or potential for, the presence of historic properties can be sought from the State Historic Preservation Officer, Tribal Historic Preservation Officer, or designated tribal representative, as appropriate, and the National Register of Historic Places (see 33 CFR 330.4(g)). When reviewing pre-construction notifications, district engineers will comply with the current procedures for addressing the requirements of section 106 of the National Historic Preservation Act. The district engineer shall make a reasonable and good faith effort to carry out appropriate identification efforts, which may include background research, consultation, oral history interviews, sample field investigation, and field survey. Based on the information submitted in the PCN and these identification efforts, the district engineer shall determine whether the proposed NWP activity has the potential to cause effects on the historic properties. Section 106 consultation is not required when the district engineer determines that the activity does not have the potential to cause effects on historic properties (see 36 CFR 800.3(a)). Section 106 consultation is required when the district engineer determines that the activity has the potential to cause effects on historic properties. The district engineer will conduct consultation with consulting parties identified under 36 CFR 800.2(c) when he or she makes any of the following effect determinations for the purposes of section 106 of the NHPA: no historic properties affected, no adverse effect, or adverse effect. Where the non-Federal applicant has identified historic properties on which the activity might have the potential to cause effects and so notified the Corps, the non-Federal applicant shall not begin the activity until notified by the district engineer either that the activity has no potential to cause effects to historic properties or that NHPA section 106 consultation has been completed. 9 (d) For non-federal permittees, the district engineer will notify the prospective permittee within 45 days of receipt of a complete pre-construction notification whether NHPA section 106 consultation is required. If NHPA section 106 consultation is required, the district engineer will notify the non-Federal applicant that he or she cannot begin the activity until section 106 consultation is completed. If the non-Federal applicant has not heard back from the Corps within 45 days, the applicant must still wait for notification from the Corps. (e) Prospective permittees should be aware that section 110k of the NHPA (54 U.S.C. 306113) prevents the Corps from granting a permit or other assistance to an applicant who, with intent to avoid the requirements of section 106 of the NHPA, has intentionally significantly adversely affected a historic property to which the permit would relate, or having legal power to prevent it, allowed such significant adverse effect to occur, unless the Corps, after consultation with the Advisory Council on Historic Preservation (ACHP), determines that circumstances justify granting such assistance despite the adverse effect created or permitted by the applicant. If circumstances justify granting the assistance, the Corps is required to notify the ACHP and provide documentation specifying the circumstances, the degree of damage to the integrity of any historic properties affected, and proposed mitigation. This documentation must include any views obtained from the applicant, SHPO/THPO, appropriate Indian tribes if the undertaking occurs on or affects historic properties on tribal lands or affects properties of interest to those tribes, and other parties known to have a legitimate interest in the impacts to the permitted activity on historic properties. 21. Discovery of Previously Unknown Remains and Artifacts. If you discover any previously unknown historic, cultural or archeological remains and artifacts while accomplishing the activity authorized by this permit, you must immediately notify the district engineer of what you have found, and to the maximum extent practicable, avoid construction activities that may affect the remains and artifacts until the required coordination has been completed. The district engineer will initiate the Federal, Tribal, and state coordination required to determine if the items or remains warrant a recovery effort or if the site is eligible for listing in the National Register of Historic Places. 22. Designated Critical Resource Waters. Critical resource waters include, NOAA- managed marine sanctuaries and marine monuments, and National Estuarine Research Reserves. The district engineer may designate, after notice and opportunity for public comment, additional waters officially designated by a state as having particular environmental or ecological significance, such as outstanding national resource waters or state natural heritage sites. The district engineer may also designate additional critical resource waters after notice and opportunity for public comment. (a) Discharges of dredged or fill material into waters of the United States are not authorized by NWPs 7, 12, 14, 16, 17, 21, 29, 31, 35, 39, 40, 42, 43, 44, 49, 50, 51, and 52 for any activity within, or directly affecting, critical resource waters, including wetlands adjacent to such waters. (b) For NWPs 3, 8, 10, 13, 15, 18, 19, 22, 23, 25, 27, 28, 30, 33, 34, 36, 37, 38, and 54, notification is required in accordance with general condition 32, for any activity proposed in the designated critical resource waters including wetlands adjacent to those waters. The district engineer may authorize activities under these NWPs only after it is determined that the impacts to the critical resource waters will be no more than minimal. 10 23. Mitigation. The district engineer will consider the following factors when determining appropriate and practicable mitigation necessary to ensure that the individual and cumulative adverse environmental effects are no more than minimal: (a) The activity must be designed and constructed to avoid and minimize adverse effects, both temporary and permanent, to waters of the United States to the maximum extent practicable at the project site (i.e., on site). (b) Mitigation in all its forms (avoiding, minimizing, rectifying, reducing, or compensating for resource losses) will be required to the extent necessary to ensure that the individual and cumulative adverse environmental effects are no more than minimal. (c) Compensatory mitigation at a minimum one-for-one ratio will be required for all wetland losses that exceed 1/10-acre and require pre-construction notification, unless the district engineer determines in writing that either some other form of mitigation would be more environmentally appropriate or the adverse environmental effects of the proposed activity are no more than minimal, and provides an activity-specific waiver of this requirement. For wetland losses of 1/10-acre or less that require pre-construction notification, the district engineer may determine on a case-by-case basis that compensatory mitigation is required to ensure that the activity results in only minimal adverse environmental effects. (d) For losses of streams or other open waters that require pre-construction notification, the district engineer may require compensatory mitigation to ensure that the activity results in no more than minimal adverse environmental effects. Compensatory mitigation for losses of streams should be provided, if practicable, through stream rehabilitation, enhancement, or preservation, since streams are difficult-to-replace resources (see 33 CFR 332.3(e)(3)). (e) Compensatory mitigation plans for NWP activities in or near streams or other open waters will normally include a requirement for the restoration or enhancement, maintenance, and legal protection (e.g., conservation easements) of riparian areas next to open waters. In some cases, the restoration or maintenance/protection of riparian areas may be the only compensatory mitigation required. Restored riparian areas should consist of native species. The width of the required riparian area will address documented water quality or aquatic habitat loss concerns. Normally, the riparian area will be 25 to 50 feet wide on each side of the stream, but the district engineer may require slightly wider riparian areas to address documented water quality or habitat loss concerns. If it is not possible to restore or maintain/protect a riparian area on both sides of a stream, or if the waterbody is a lake or coastal waters, then restoring or maintaining/protecting a riparian area along a single bank or shoreline may be sufficient. Where both wetlands and open waters exist on the project site, the district engineer will determine the appropriate compensatory mitigation (e.g., riparian areas and/or wetlands compensation) based on what is best for the aquatic environment on a watershed basis. In cases where riparian areas are determined to be the most appropriate form of minimization or compensatory mitigation, the district engineer may waive or reduce the requirement to provide wetland compensatory mitigation for wetland losses. (f) Compensatory mitigation projects provided to offset losses of aquatic resources must comply with the applicable provisions of 33 CFR part 332. (1) The prospective permittee is responsible for proposing an appropriate compensatory mitigation option if compensatory mitigation is necessary to ensure that the activity results in no more than minimal adverse environmental effects. For the NWPs, the preferred mechanism for providing compensatory mitigation is mitigation bank credits or in- 11 lieu fee program credits (see 33 CFR 332.3(b)(2) and (3)). However, if an appropriate number and type of mitigation bank or in-lieu credits are not available at the time the PCN is submitted to the district engineer, the district engineer may approve the use of permittee-responsible mitigation. (2) The amount of compensatory mitigation required by the district engineer must be sufficient to ensure that the authorized activity results in no more than minimal individual and cumulative adverse environmental effects (see 33 CFR 330.1(e)(3)). (See also 33 CFR 332.3(f)). (3) Since the likelihood of success is greater and the impacts to potentially valuable uplands are reduced, aquatic resource restoration should be the first compensatory mitigation option considered for permittee-responsible mitigation. (4) If permittee-responsible mitigation is the proposed option, the prospective permittee is responsible for submitting a mitigation plan. A conceptual or detailed mitigation plan may be used by the district engineer to make the decision on the NWP verification request, but a final mitigation plan that addresses the applicable requirements of 33 CFR 332.4(c)(2) through (14) must be approved by the district engineer before the permittee begins work in waters of the United States, unless the district engineer determines that prior approval of the final mitigation plan is not practicable or not necessary to ensure timely completion of the required compensatory mitigation (see 33 CFR 332.3(k)(3)). (5) If mitigation bank or in-lieu fee program credits are the proposed option, the mitigation plan only needs to address the baseline conditions at the impact site and the number of credits to be provided. (6) Compensatory mitigation requirements (e.g., resource type and amount to be provided as compensatory mitigation, site protection, ecological performance standards, monitoring requirements) may be addressed through conditions added to the NWP authorization, instead of components of a compensatory mitigation plan (see 33 CFR 332.4(c)(1)(ii)). (g) Compensatory mitigation will not be used to increase the acreage losses allowed by the acreage limits of the NWPs. For example, if an NWP has an acreage limit of 1/2-acre, it cannot be used to authorize any NWP activity resulting in the loss of greater than 1/2-acre of waters of the United States, even if compensatory mitigation is provided that replaces or restores some of the lost waters. However, compensatory mitigation can and should be used, as necessary, to ensure that an NWP activity already meeting the established acreage limits also satisfies the no more than minimal impact requirement for the NWPs. (h) Permittees may propose the use of mitigation banks, in-lieu fee programs, or permittee-responsible mitigation. When developing a compensatory mitigation proposal, the permittee must consider appropriate and practicable options consistent with the framework at 33 CFR 332.3(b). For activities resulting in the loss of marine or estuarine resources, permittee-responsible mitigation may be environmentally preferable if there are no mitigation banks or in-lieu fee programs in the area that have marine or estuarine credits available for sale or transfer to the permittee. For permittee-responsible mitigation, the special conditions of the NWP verification must clearly indicate the party or parties responsible for the implementation and performance of the compensatory mitigation project, and, if required, its long-term management. (i) Where certain functions and services of waters of the United States are permanently adversely affected by a regulated activity, such as discharges of dredged or fill 12 material into waters of the United States that will convert a forested or scrub-shrub wetland to a herbaceous wetland in a permanently maintained utility line right-of-way, mitigation may be required to reduce the adverse environmental effects of the activity to the no more than minimal level. 24. Safety of Impoundment Structures. To ensure that all impoundment structures are safely designed, the district engineer may require non-Federal applicants to demonstrate that the structures comply with established state dam safety criteria or have been designed by qualified persons. The district engineer may also require documentation that the design has been independently reviewed by similarly qualified persons, and appropriate modifications made to ensure safety. 25. Water Quality. Where States and authorized Tribes, or EPA where applicable, have not previously certified compliance of an NWP with CWA section 401, individual 401 Water Quality Certification must be obtained or waived (see 33 CFR 330.4(c)). The district engineer or State or Tribe may require additional water quality management measures to ensure that the authorized activity does not result in more than minimal degradation of water quality. 26. Coastal Zone Management. In coastal states where an NWP has not previously received a state coastal zone management consistency concurrence, an individual state coastal zone management consistency concurrence must be obtained, or a presumption of concurrence must occur (see 33 CFR 330.4(d)). The district engineer or a State may require additional measures to ensure that the authorized activity is consistent with state coastal zone management requirements. 27. Regional and Case-By-Case Conditions. The activity must comply with any regional conditions that may have been added by the Division Engineer (see 33 CFR 330.4(e)) and with any case specific conditions added by the Corps or by the state, Indian Tribe, or U.S. EPA in its section 401 Water Quality Certification, or by the state in its Coastal Zone Management Act consistency determination. 28. Use of Multiple Nationwide Permits. The use of more than one NWP for a single and complete project is prohibited, except when the acreage loss of waters of the United States authorized by the NWPs does not exceed the acreage limit of the NWP with the highest specified acreage limit. For example, if a road crossing over tidal waters is constructed under NWP 14, with associated bank stabilization authorized by NWP 13, the maximum acreage loss of waters of the United States for the total project cannot exceed 1/3-acre. 29. Transfer of Nationwide Permit Verifications. If the permittee sells the property associated with a nationwide permit verification, the permittee may transfer the nationwide permit verification to the new owner by submitting a letter to the appropriate Corps district office to validate the transfer. A copy of the nationwide permit verification must be attached to the letter, and the letter must contain the following statement and signature: “When the structures or work authorized by this nationwide permit are still in existence at the time the property is transferred, the terms and conditions of this nationwide permit, including any special conditions, will continue to be binding on the new owner(s) of the property. To 13 validate the transfer of this nationwide permit and the associated liabilities associated with compliance with its terms and conditions, have the transferee sign and date below.” (Transferee) (Date) 30. Compliance Certification. Each permittee who receives an NWP verification letter from the Corps must provide a signed certification documenting completion of the authorized activity and implementation of any required compensatory mitigation. The success of any required permittee-responsible mitigation, including the achievement of ecological performance standards, will be addressed separately by the district engineer. The Corps will provide the permittee the certification document with the NWP verification letter. The certification document will include: (a) A statement that the authorized activity was done in accordance with the NWP authorization, including any general, regional, or activity-specific conditions; (b) A statement that the implementation of any required compensatory mitigation was completed in accordance with the permit conditions. If credits from a mitigation bank or in-lieu fee program are used to satisfy the compensatory mitigation requirements, the certification must include the documentation required by 33 CFR 332.3(l)(3) to confirm that the permittee secured the appropriate number and resource type of credits; and (c) The signature of the permittee certifying the completion of the activity and mitigation. The completed certification document must be submitted to the district engineer within 30 days of completion of the authorized activity or the implementation of any required compensatory mitigation, whichever occurs later. 31. Activities Affecting Structures or Works Built by the United States. If an NWP activity also requires permission from the Corps pursuant to 33 U.S.C. 408 because it will alter or temporarily or permanently occupy or use a U.S. Army Corps of Engineers (USACE) federally authorized Civil Works project (a “USACE project”), the prospective permittee must submit a pre-construction notification. See paragraph (b)(10) of general condition 32. An activity that requires section 408 permission is not authorized by NWP until the appropriate Corps office issues the section 408 permission to alter, occupy, or use the USACE project, and the district engineer issues a written NWP verification. 32. Pre-Construction Notification. (a) Timing. Where required by the terms of the NWP, the prospective permittee must notify the district engineer by submitting a pre- construction notification (PCN) as early as possible. The district engineer must determine if the PCN is complete within 30 calendar days of the date of receipt and, if the PCN is determined to be incomplete, notify the prospective permittee within that 30 day period to request the additional information necessary to make the PCN complete. The request must specify the information needed to make the PCN complete. As a general rule, district engineers will request additional information necessary to make the PCN complete only once. However, if the 14 prospective permittee does not provide all of the requested information, then the district engineer will notify the prospective permittee that the PCN is still incomplete and the PCN review process will not commence until all of the requested information has been received by the district engineer. The prospective permittee shall not begin the activity until either: (1) He or she is notified in writing by the district engineer that the activity may proceed under the NWP with any special conditions imposed by the district or division engineer; or (2) 45 calendar days have passed from the district engineer’s receipt of the complete PCN and the prospective permittee has not received written notice from the district or division engineer. However, if the permittee was required to notify the Corps pursuant to general condition 18 that listed species or critical habitat might be affected or are in the vicinity of the activity, or to notify the Corps pursuant to general condition 20 that the activity might have the potential to cause effects to historic properties, the permittee cannot begin the activity until receiving written notification from the Corps that there is “no effect” on listed species or “no potential to cause effects” on historic properties, or that any consultation required under Section 7 of the Endangered Species Act (see 33 CFR 330.4(f)) and/or section 106 of the National Historic Preservation Act (see 33 CFR 330.4(g)) has been completed. Also, work cannot begin under NWPs 21, 49, or 50 until the permittee has received written approval from the Corps. If the proposed activity requires a written waiver to exceed specified limits of an NWP, the permittee may not begin the activity until the district engineer issues the waiver. If the district or division engineer notifies the permittee in writing that an individual permit is required within 45 calendar days of receipt of a complete PCN, the permittee cannot begin the activity until an individual permit has been obtained. Subsequently, the permittee’s right to proceed under the NWP may be modified, suspended, or revoked only in accordance with the procedure set forth in 33 CFR 330.5(d)(2). (b) Contents of Pre-Construction Notification: The PCN must be in writing and include the following information: (1) Name, address and telephone numbers of the prospective permittee; (2) Location of the proposed activity; (3) Identify the specific NWP or NWP(s) the prospective permittee wants to use to authorize the proposed activity; (4) A description of the proposed activity; the activity’s purpose; direct and indirect adverse environmental effects the activity would cause, including the anticipated amount of loss of wetlands, other special aquatic sites, and other waters expected to result from the NWP activity, in acres, linear feet, or other appropriate unit of measure; a description of any proposed mitigation measures intended to reduce the adverse environmental effects caused by the proposed activity; and any other NWP(s), regional general permit(s), or individual permit(s) used or intended to be used to authorize any part of the proposed project or any related activity, including other separate and distant crossings for linear projects that require Department of the Army authorization but do not require pre-construction notification. The description of the proposed activity and any proposed mitigation measures should be sufficiently detailed to allow the district engineer to determine that the adverse environmental effects of the activity will be no more than minimal and to determine the need for compensatory mitigation or other mitigation measures. For single and complete linear projects, the PCN must include the quantity of anticipated losses of wetlands, other special aquatic sites, and other waters for each single and complete crossing of those wetlands, other special aquatic sites, and other waters. 15 Sketches should be provided when necessary to show that the activity complies with the terms of the NWP. (Sketches usually clarify the activity and when provided results in a quicker decision. Sketches should contain sufficient detail to provide an illustrative description of the proposed activity (e.g., a conceptual plan), but do not need to be detailed engineering plans); (5) The PCN must include a delineation of wetlands, other special aquatic sites, and other waters, such as lakes and ponds, and perennial, intermittent, and ephemeral streams, on the project site. Wetland delineations must be prepared in accordance with the current method required by the Corps. The permittee may ask the Corps to delineate the special aquatic sites and other waters on the project site, but there may be a delay if the Corps does the delineation, especially if the project site is large or contains many wetlands, other special aquatic sites, and other waters. Furthermore, the 45 day period will not start until the delineation has been submitted to or completed by the Corps, as appropriate; (6) If the proposed activity will result in the loss of greater than 1/10-acre of wetlands and a PCN is required, the prospective permittee must submit a statement describing how the mitigation requirement will be satisfied, or explaining why the adverse environmental effects are no more than minimal and why compensatory mitigation should not be required. As an alternative, the prospective permittee may submit a conceptual or detailed mitigation plan. (7) For non-Federal permittees, if any listed species or designated critical habitat might be affected or is in the vicinity of the activity, or if the activity is located in designated critical habitat, the PCN must include the name(s) of those endangered or threatened species that might be affected by the proposed activity or utilize the designated critical habitat that might be affected by the proposed activity. For NWP activities that require pre-construction notification, Federal permittees must provide documentation demonstrating compliance with the Endangered Species Act; (8) For non-Federal permittees, if the NWP activity might have the potential to cause effects to a historic property listed on, determined to be eligible for listing on, or potentially eligible for listing on, the National Register of Historic Places, the PCN must state which historic property might have the potential to be affected by the proposed activity or include a vicinity map indicating the location of the historic property. For NWP activities that require pre-construction notification, Federal permittees must provide documentation demonstrating compliance with section 106 of the National Historic Preservation Act; (9) For an activity that will occur in a component of the National Wild and Scenic River System, or in a river officially designated by Congress as a “study river” for possible inclusion in the system while the river is in an official study status, the PCN must identify the Wild and Scenic River or the “study river” (see general condition 16); and (10) For an activity that requires permission from the Corps pursuant to 33 U.S.C. 408 because it will alter or temporarily or permanently occupy or use a U.S. Army Corps of Engineers federally authorized civil works project, the pre-construction notification must include a statement confirming that the project proponent has submitted a written request for section 408 permission from the Corps office having jurisdiction over that USACE project. (c) Form of Pre-Construction Notification: The standard individual permit application form (Form ENG 4345) may be used, but the completed application form must clearly indicate that it is an NWP PCN and must include all of the applicable information required in paragraphs (b)(1) through (10) of this general condition. A letter containing the required information may also be used. Applicants may provide electronic files of PCNs and 16 supporting materials if the district engineer has established tools and procedures for electronic submittals. (d) Agency Coordination: (1) The district engineer will consider any comments from Federal and state agencies concerning the proposed activity’s compliance with the terms and conditions of the NWPs and the need for mitigation to reduce the activity’s adverse environmental effects so that they are no more than minimal. (2) Agency coordination is required for: (i) all NWP activities that require pre- construction notification and result in the loss of greater than 1/2-acre of waters of the United States; (ii) NWP 21, 29, 39, 40, 42, 43, 44, 50, 51, and 52 activities that require pre- construction notification and will result in the loss of greater than 300 linear feet of stream bed; (iii) NWP 13 activities in excess of 500 linear feet, fills greater than one cubic yard per running foot, or involve discharges of dredged or fill material into special aquatic sites; and (iv) NWP 54 activities in excess of 500 linear feet, or that extend into the waterbody more than 30 feet from the mean low water line in tidal waters or the ordinary high water mark in the Great Lakes. (3) When agency coordination is required, the district engineer will immediately provide (e.g., via e-mail, facsimile transmission, overnight mail, or other expeditious manner) a copy of the complete PCN to the appropriate Federal or state offices (FWS, state natural resource or water quality agency, EPA, and, if appropriate, the NMFS). With the exception of NWP 37, these agencies will have 10 calendar days from the date the material is transmitted to notify the district engineer via telephone, facsimile transmission, or e-mail that they intend to provide substantive, site-specific comments. The comments must explain why the agency believes the adverse environmental effects will be more than minimal. If so contacted by an agency, the district engineer will wait an additional 15 calendar days before making a decision on the pre-construction notification. The district engineer will fully consider agency comments received within the specified time frame concerning the proposed activity’s compliance with the terms and conditions of the NWPs, including the need for mitigation to ensure the net adverse environmental effects of the proposed activity are no more than minimal. The district engineer will provide no response to the resource agency, except as provided below. The district engineer will indicate in the administrative record associated with each pre-construction notification that the resource agencies’ concerns were considered. For NWP 37, the emergency watershed protection and rehabilitation activity may proceed immediately in cases where there is an unacceptable hazard to life or a significant loss of property or economic hardship will occur. The district engineer will consider any comments received to decide whether the NWP 37 authorization should be modified, suspended, or revoked in accordance with the procedures at 33 CFR 330.5. (4) In cases of where the prospective permittee is not a Federal agency, the district engineer will provide a response to NMFS within 30 calendar days of receipt of any Essential Fish Habitat conservation recommendations, as required by section 305(b)(4)(B) of the Magnuson-Stevens Fishery Conservation and Management Act. (5) Applicants are encouraged to provide the Corps with either electronic files or multiple copies of pre-construction notifications to expedite agency coordination. DISTRICT ENGINEER’S DECISION 1. In reviewing the PCN for the proposed activity, the district engineer will determine whether the activity authorized by the NWP will result in more than minimal 17 individual or cumulative adverse environmental effects or may be contrary to the public interest. If a project proponent requests authorization by a specific NWP, the district engineer should issue the NWP verification for that activity if it meets the terms and conditions of that NWP, unless he or she determines, after considering mitigation, that the proposed activity will result in more than minimal individual and cumulative adverse effects on the aquatic environment and other aspects of the public interest and exercises discretionary authority to require an individual permit for the proposed activity. For a linear project, this determination will include an evaluation of the individual crossings of waters of the United States to determine whether they individually satisfy the terms and conditions of the NWP(s), as well as the cumulative effects caused by all of the crossings authorized by NWP. If an applicant requests a waiver of the 300 linear foot limit on impacts to streams or of an otherwise applicable limit, as provided for in NWPs 13, 21, 29, 36, 39, 40, 42, 43, 44, 50, 51, 52, or 54, the district engineer will only grant the waiver upon a written determination that the NWP activity will result in only minimal individual and cumulative adverse environmental effects. For those NWPs that have a waivable 300 linear foot limit for losses of intermittent and ephemeral stream bed and a 1/2-acre limit (i.e., NWPs 21, 29, 39, 40, 42, 43, 44, 50, 51, and 52), the loss of intermittent and ephemeral stream bed, plus any other losses of jurisdictional waters and wetlands, cannot exceed 1/2-acre. 2. When making minimal adverse environmental effects determinations the district engineer will consider the direct and indirect effects caused by the NWP activity. He or she will also consider the cumulative adverse environmental effects caused by activities authorized by NWP and whether those cumulative adverse environmental effects are no more than minimal. The district engineer will also consider site specific factors, such as the environmental setting in the vicinity of the NWP activity, the type of resource that will be affected by the NWP activity, the functions provided by the aquatic resources that will be affected by the NWP activity, the degree or magnitude to which the aquatic resources perform those functions, the extent that aquatic resource functions will be lost as a result of the NWP activity (e.g., partial or complete loss), the duration of the adverse effects (temporary or permanent), the importance of the aquatic resource functions to the region (e.g., watershed or ecoregion), and mitigation required by the district engineer. If an appropriate functional or condition assessment method is available and practicable to use, that assessment method may be used by the district engineer to assist in the minimal adverse environmental effects determination. The district engineer may add case-specific special conditions to the NWP authorization to address site- specific environmental concerns. 3. If the proposed activity requires a PCN and will result in a loss of greater than 1/10-acre of wetlands, the prospective permittee should submit a mitigation proposal with the PCN. Applicants may also propose compensatory mitigation for NWP activities with smaller impacts, or for impacts to other types of waters (e.g., streams). The district engineer will consider any proposed compensatory mitigation or other mitigation measures the applicant has included in the proposal in determining whether the net adverse environmental effects of the proposed activity are no more than minimal. The compensatory mitigation proposal may be either conceptual or detailed. If the district engineer determines that the activity complies with the terms and conditions of the NWP and that the adverse environmental effects are no more than minimal, after considering mitigation, the district engineer will notify the permittee and 18 include any activity-specific conditions in the NWP verification the district engineer deems necessary. Conditions for compensatory mitigation requirements must comply with the appropriate provisions at 33 CFR 332.3(k). The district engineer must approve the final mitigation plan before the permittee commences work in waters of the United States, unless the district engineer determines that prior approval of the final mitigation plan is not practicable or not necessary to ensure timely completion of the required compensatory mitigation. If the prospective permittee elects to submit a compensatory mitigation plan with the PCN, the district engineer will expeditiously review the proposed compensatory mitigation plan. The district engineer must review the proposed compensatory mitigation plan within 45 calendar days of receiving a complete PCN and determine whether the proposed mitigation would ensure the NWP activity results in no more than minimal adverse environmental effects. If the net adverse environmental effects of the NWP activity (after consideration of the mitigation proposal) are determined by the district engineer to be no more than minimal, the district engineer will provide a timely written response to the applicant. The response will state that the NWP activity can proceed under the terms and conditions of the NWP, including any activity-specific conditions added to the NWP authorization by the district engineer. 4. If the district engineer determines that the adverse environmental effects of the proposed activity are more than minimal, then the district engineer will notify the applicant either: (a) that the activity does not qualify for authorization under the NWP and instruct the applicant on the procedures to seek authorization under an individual permit; (b) that the activity is authorized under the NWP subject to the applicant’s submission of a mitigation plan that would reduce the adverse environmental effects so that they are no more than minimal; or (c) that the activity is authorized under the NWP with specific modifications or conditions. Where the district engineer determines that mitigation is required to ensure no more than minimal adverse environmental effects, the activity will be authorized within the 45-day PCN period (unless additional time is required to comply with general conditions 18, 20, and/or 31, or to evaluate PCNs for activities authorized by NWPs 21, 49, and 50), with activity-specific conditions that state the mitigation requirements. The authorization will include the necessary conceptual or detailed mitigation plan or a requirement that the applicant submit a mitigation plan that would reduce the adverse environmental effects so that they are no more than minimal. When compensatory mitigation is required, no work in waters of the United States may occur until the district engineer has approved a specific mitigation plan or has determined that prior approval of a final mitigation plan is not practicable or not necessary to ensure timely completion of the required compensatory mitigation. FURTHER INFORMATION 1. District Engineers have authority to determine if an activity complies with the terms and conditions of an NWP. 2. NWPs do not obviate the need to obtain other federal, state, or local permits, approvals, or authorizations required by law. 3. NWPs do not grant any property rights or exclusive privileges. 4. NWPs do not authorize any injury to the property or rights of others. 5. NWPs do not authorize interference with any existing or proposed Federal project (see general condition 31). 19 DEFINITIONS Best management practices (BMPs): Policies, practices, procedures, or structures implemented to mitigate the adverse environmental effects on surface water quality resulting from development. BMPs are categorized as structural or non-structural. Compensatory mitigation: The restoration (re-establishment or rehabilitation), establishment (creation), enhancement, and/or in certain circumstances preservation of aquatic resources for the purposes of offsetting unavoidable adverse impacts which remain after all appropriate and practicable avoidance and minimization has been achieved. Currently serviceable: Useable as is or with some maintenance, but not so degraded as to essentially require reconstruction. Direct effects: Effects that are caused by the activity and occur at the same time and place. Discharge: The term “discharge” means any discharge of dredged or fill material into waters of the United States. Ecological reference: A model used to plan and design an aquatic habitat and riparian area restoration, enhancement, or establishment activity under NWP 27. An ecological reference may be based on the structure, functions, and dynamics of an aquatic habitat type or a riparian area type that currently exists in the region where the proposed NWP 27 activity is located. Alternatively, an ecological reference may be based on a conceptual model for the aquatic habitat type or riparian area type to be restored, enhanced, or established as a result of the proposed NWP 27 activity. An ecological reference takes into account the range of variation of the aquatic habitat type or riparian area type in the region. Enhancement: The manipulation of the physical, chemical, or biological characteristics of an aquatic resource to heighten, intensify, or improve a specific aquatic resource function(s). Enhancement results in the gain of selected aquatic resource function(s), but may also lead to a decline in other aquatic resource function(s). Enhancement does not result in a gain in aquatic resource area. Ephemeral stream: An ephemeral stream has flowing water only during, and for a short duration after, precipitation events in a typical year. Ephemeral stream beds are located above the water table year-round. Groundwater is not a source of water for the stream. Runoff from rainfall is the primary source of water for stream flow. Establishment (creation): The manipulation of the physical, chemical, or biological characteristics present to develop an aquatic resource that did not previously exist at an upland site. Establishment results in a gain in aquatic resource area. High Tide Line: The line of intersection of the land with the water’s surface at the maximum height reached by a rising tide. The high tide line may be determined, in the absence of actual data, by a line of oil or scum along shore objects, a more or less continuous deposit of fine shell or debris on the foreshore or berm, other physical markings or characteristics, vegetation lines, tidal gages, or other suitable means that delineate the general height reached by a rising tide. The line encompasses spring high tides and other high tides that occur with periodic frequency but does not include storm surges in which there is a departure from the normal or predicted reach of the tide due to the piling up of water against a coast by strong winds such as those accompanying a hurricane or other intense storm. Historic Property: Any prehistoric or historic district, site (including archaeological site), building, structure, or other object included in, or eligible for inclusion in, the National 20 Register of Historic Places maintained by the Secretary of the Interior. This term includes artifacts, records, and remains that are related to and located within such properties. The term includes properties of traditional religious and cultural importance to an Indian tribe or Native Hawaiian organization and that meet the National Register criteria (36 CFR part 60). Independent utility: A test to determine what constitutes a single and complete non- linear project in the Corps Regulatory Program. A project is considered to have independent utility if it would be constructed absent the construction of other projects in the project area. Portions of a multi-phase project that depend upon other phases of the project do not have independent utility. Phases of a project that would be constructed even if the other phases were not built can be considered as separate single and complete projects with independent utility. Indirect effects: Effects that are caused by the activity and are later in time or farther removed in distance, but are still reasonably foreseeable. Intermittent stream: An intermittent stream has flowing water during certain times of the year, when groundwater provides water for stream flow. During dry periods, intermittent streams may not have flowing water. Runoff from rainfall is a supplemental source of water for stream flow. Loss of waters of the United States: Waters of the United States that are permanently adversely affected by filling, flooding, excavation, or drainage because of the regulated activity. Permanent adverse effects include permanent discharges of dredged or fill material that change an aquatic area to dry land, increase the bottom elevation of a waterbody, or change the use of a waterbody. The acreage of loss of waters of the United States is a threshold measurement of the impact to jurisdictional waters for determining whether a project may qualify for an NWP; it is not a net threshold that is calculated after considering compensatory mitigation that may be used to offset losses of aquatic functions and services. The loss of stream bed includes the acres or linear feet of stream bed that are filled or excavated as a result of the regulated activity. Waters of the United States temporarily filled, flooded, excavated, or drained, but restored to pre- construction contours and elevations after construction, are not included in the measurement of loss of waters of the United States. Impacts resulting from activities that do not require Department of the Army authorization, such as activities eligible for exemptions under section 404(f) of the Clean Water Act, are not considered when calculating the loss of waters of the United States. Navigable waters: Waters subject to section 10 of the Rivers and Harbors Act of 1899. These waters are defined at 33 CFR part 329. Non-tidal wetland: A non-tidal wetland is a wetland that is not subject to the ebb and flow of tidal waters. Non-tidal wetlands contiguous to tidal waters are located landward of the high tide line (i.e., spring high tide line). Open water: For purposes of the NWPs, an open water is any area that in a year with normal patterns of precipitation has water flowing or standing above ground to the extent that an ordinary high water mark can be determined. Aquatic vegetation within the area of flowing or standing water is either non-emergent, sparse, or absent. Vegetated shallows are considered to be open waters. Examples of “open waters” include rivers, streams, lakes, and ponds. Ordinary High Water Mark: An ordinary high water mark is a line on the shore established by the fluctuations of water and indicated by physical characteristics, or by other appropriate means that consider the characteristics of the surrounding areas. Perennial stream: A perennial stream has flowing water year-round during a typical year. The water table is located above the stream bed for most of the year. Groundwater is the 21 primary source of water for stream flow. Runoff from rainfall is a supplemental source of water for stream flow. Practicable: Available and capable of being done after taking into consideration cost, existing technology, and logistics in light of overall project purposes. Pre-construction notification: A request submitted by the project proponent to the Corps for confirmation that a particular activity is authorized by nationwide permit. The request may be a permit application, letter, or similar document that includes information about the proposed work and its anticipated environmental effects. Pre-construction notification may be required by the terms and conditions of a nationwide permit, or by regional conditions. A pre- construction notification may be voluntarily submitted in cases where pre-construction notification is not required and the project proponent wants confirmation that the activity is authorized by nationwide permit. Preservation: The removal of a threat to, or preventing the decline of, aquatic resources by an action in or near those aquatic resources. This term includes activities commonly associated with the protection and maintenance of aquatic resources through the implementation of appropriate legal and physical mechanisms. Preservation does not result in a gain of aquatic resource area or functions. Protected tribal resources: Those natural resources and properties of traditional or customary religious or cultural importance, either on or off Indian lands, retained by, or reserved by or for, Indian tribes through treaties, statutes, judicial decisions, or executive orders, including tribal trust resources. Re-establishment: The manipulation of the physical, chemical, or biological characteristics of a site with the goal of returning natural/historic functions to a former aquatic resource. Re-establishment results in rebuilding a former aquatic resource and results in a gain in aquatic resource area and functions. Rehabilitation: The manipulation of the physical, chemical, or biological characteristics of a site with the goal of repairing natural/historic functions to a degraded aquatic resource. Rehabilitation results in a gain in aquatic resource function, but does not result in a gain in aquatic resource area. Restoration: The manipulation of the physical, chemical, or biological characteristics of a site with the goal of returning natural/historic functions to a former or degraded aquatic resource. For the purpose of tracking net gains in aquatic resource area, restoration is divided into two categories: re-establishment and rehabilitation. Riffle and pool complex: Riffle and pool complexes are special aquatic sites under the 404(b)(1) Guidelines. Riffle and pool complexes sometimes characterize steep gradient sections of streams. Such stream sections are recognizable by their hydraulic characteristics. The rapid movement of water over a course substrate in riffles results in a rough flow, a turbulent surface, and high dissolved oxygen levels in the water. Pools are deeper areas associated with riffles. A slower stream velocity, a streaming flow, a smooth surface, and a finer substrate characterize pools. Riparian areas: Riparian areas are lands next to streams, lakes, and estuarine- marine shorelines. Riparian areas are transitional between terrestrial and aquatic ecosystems, through which surface and subsurface hydrology connects riverine, lacustrine, estuarine, and marine waters with their adjacent wetlands, non-wetland waters, or uplands. Riparian areas provide a variety of ecological functions and services and help improve or maintain local water quality. (See general condition 23.) 22 Shellfish seeding: The placement of shellfish seed and/or suitable substrate to increase shellfish production. Shellfish seed consists of immature individual shellfish or individual shellfish attached to shells or shell fragments (i.e., spat on shell). Suitable substrate may consist of shellfish shells, shell fragments, or other appropriate materials placed into waters for shellfish habitat. Single and complete linear project: A linear project is a project constructed for the purpose of getting people, goods, or services from a point of origin to a terminal point, which often involves multiple crossings of one or more waterbodies at separate and distant locations. The term “single and complete project” is defined as that portion of the total linear project proposed or accomplished by one owner/developer or partnership or other association of owners/developers that includes all crossings of a single water of the United States (i.e., a single waterbody) at a specific location. For linear projects crossing a single or multiple waterbodies several times at separate and distant locations, each crossing is considered a single and complete project for purposes of NWP authorization. However, individual channels in a braided stream or river, or individual arms of a large, irregularly shaped wetland or lake, etc., are not separate waterbodies, and crossings of such features cannot be considered separately. Single and complete non-linear project: For non-linear projects, the term “single and complete project” is defined at 33 CFR 330.2(i) as the total project proposed or accomplished by one owner/developer or partnership or other association of owners/developers. A single and complete non-linear project must have independent utility (see definition of “independent utility”). Single and complete non-linear projects may not be “piecemealed” to avoid the limits in an NWP authorization. Stormwater management: Stormwater management is the mechanism for controlling stormwater runoff for the purposes of reducing downstream erosion, water quality degradation, and flooding and mitigating the adverse effects of changes in land use on the aquatic environment. Stormwater management facilities: Stormwater management facilities are those facilities, including but not limited to, stormwater retention and detention ponds and best management practices, which retain water for a period of time to control runoff and/or improve the quality (i.e., by reducing the concentration of nutrients, sediments, hazardous substances and other pollutants) of stormwater runoff. Stream bed: The substrate of the stream channel between the ordinary high water marks. The substrate may be bedrock or inorganic particles that range in size from clay to boulders. Wetlands contiguous to the stream bed, but outside of the ordinary high water marks, are not considered part of the stream bed. Stream channelization: The manipulation of a stream’s course, condition, capacity, or location that causes more than minimal interruption of normal stream processes. A channelized stream remains a water of the United States. Structure: An object that is arranged in a definite pattern of organization. Examples of structures include, without limitation, any pier, boat dock, boat ramp, wharf, dolphin, weir, boom, breakwater, bulkhead, revetment, riprap, jetty, artificial island, artificial reef, permanent mooring structure, power transmission line, permanently moored floating vessel, piling, aid to navigation, or any other manmade obstacle or obstruction. Tidal wetland: A tidal wetland is a jurisdictional wetland that is inundated by tidal waters. Tidal waters rise and fall in a predictable and measurable rhythm or cycle due to the gravitational pulls of the moon and sun. Tidal waters end where the rise and fall of the water 23 surface can no longer be practically measured in a predictable rhythm due to masking by other waters, wind, or other effects. Tidal wetlands are located channelward of the high tide line. Tribal lands: Any lands title to which is either: 1) held in trust by the United States for the benefit of any Indian tribe or individual; or 2) held by any Indian tribe or individual subject to restrictions by the United States against alienation. Tribal rights: Those rights legally accruing to a tribe or tribes by virtue of inherent sovereign authority, unextinguished aboriginal title, treaty, statute, judicial decisions, executive order or agreement, and that give rise to legally enforceable remedies. Vegetated shallows: Vegetated shallows are special aquatic sites under the 404(b)(1) Guidelines. They are areas that are permanently inundated and under normal circumstances have rooted aquatic vegetation, such as seagrasses in marine and estuarine systems and a variety of vascular rooted plants in freshwater systems. Waterbody: For purposes of the NWPs, a waterbody is a jurisdictional water of the United States. If a wetland is adjacent to a waterbody determined to be a water of the United States, that waterbody and any adjacent wetlands are considered together as a single aquatic unit (see 33 CFR 328.4(c)(2)). Examples of “waterbodies” include streams, rivers, lakes, ponds, and wetlands. 24 FINAL REGIONAL CONDITIONS 2017 NOTICE ABOUT WEB LINKS IN THIS DOCUMENT: The web links (both internal to our Wilmington District and any external links to collaborating agencies) in this document are valid at the time of publication. However, the Wilmington District Regulatory Program web page addresses, as with other agency web sites, may change over the timeframe of the five-year Nationwide Permit renewal cycle, in response to policy mandates or technology advances. While we will make every effort to check on the integrity of our web links and provide re-direct pages whenever possible, we ask that you report any broken links to us so we can keep the page information current and usable. We apologize in advanced for any broken links that you may encounter, and we ask that you navigate from the Regulatory home page (Regulatory Permit Program Wetlands and Streams) of the Wilmington District Corps of Engineers, to the “Permits” section of our web site to find links for pages that cannot be found by clicking directly on the listed web link in this document. Final 2017 Regional Conditions for Nationwide Permits (NWP) in the Wilmington District 1.0 Excluded Waters The Corps has identified waters that will be excluded from the use of all NWP’s during certain timeframes. These waters are: 1.1 Anadromous Fish Spawning Areas Waters of the United States identified by either the North Carolina Division of Marine Fisheries (NCDMF) or the North Carolina Wildlife Resources Commission (NCWRC) as anadromous fish spawning areas are excluded during the period between February 15 and June 30, without prior written approval from the Corps and either NCDMF or NCWRC. 1.2 Trout Waters Moratorium Waters of the United States in the designated trout watersheds of North Carolina are excluded during the period between October 15 and April 15 without prior written approval from the NCWRC, or from the Eastern Band of Cherokee Indians (EBCI) Fisheries and Wildlife Management (FWM) office if the project is located on EBCI trust land. (See Section 2.7 for information on the designated trout watersheds). 1.3 Sturgeon Spawning Areas as Designated by the National Marine Fisheries Service (NMFS) Waters of the United States designated as sturgeon spawning areas are excluded during the period between February 1 and June 30, without prior written approval from the NMFS. 25 2.0 Waters Requiring Additional Notification The Corps has identified waters that will be subject to additional notification requirements for activities authorized by all NWPs. These waters are: 2.1 Western NC Counties that Drain to Designated Critical Habitat For proposed activities within waters of the United States that require a Pre-Construction Notification (PCN) and are located in the sixteen counties listed below, permittees must provide a copy of the PCN to the U.S. Fish and Wildlife Service (USFWS), 160 Zillicoa Street, Asheville, North Carolina 28801. This PCN must be sent concurrently to the U.S. Fish and Wildlife Service and the Corps Asheville Regulatory Field Office. Please see General Condition 18 for specific notification requirements related to the Endangered Species Act and the below website for information on the location of designated critical habitat. Counties with tributaries that drain to designated critical habitat that require notification to the Asheville U.S. Fish and Wildlife Service: Avery, Cherokee, Forsyth, Graham, Haywood, Henderson, Jackson, Macon, Mecklenburg, Mitchell, Stokes, Surry, Swain, Transylvania, Union and Yancey. Website and office addresses for Endangered Species Act Information: The Wilmington District has developed the following website for permittees which provides guidelines on how to review linked websites and maps in order to fulfill NWP General Condition 18 requirements: http://www.saw.usace.army.mil/Missions/RegulatoryPermitProgram/AgencyCoordination/ESA.a spx Permittees who do not have internet access may contact the appropriate U.S. Fish and Wildlife Service offices listed below or Corps at (910) 251-4633: Asheville U.S. Fish and Wildlife Service Office counties: All counties west of and including Anson, Stanly, Davidson, Forsythe and Stokes Counties. U.S. Fish and Wildlife Service Asheville Field Office 160 Zillicoa Street Asheville, NC 28801 Telephone: (828) 258-3939 Raleigh U.S. Fish and Wildlife Service Office counties: all counties east of and including Richmond, Montgomery, Randolph, Guilford, and Rockingham Counties. U.S. Fish and Wildlife Service Raleigh Field Office Post Office Box 33726 26 Raleigh, NC 27636-3726 Telephone: (919) 856-4520 2.2 Special Designation Waters Prior to the use of any NWP, except NWP 3, that involves a discharge of dredged or fill material in any of the following identified waters and/or adjacent wetlands in North Carolina, permittees shall submit a PCN to the District Engineer prior to commencing the activity (see General Condition 32). The North Carolina waters and wetlands that require additional notification requirements are: “Outstanding Resource Waters” (ORW) or “High Quality Waters” (HQW) as designated by the North Carolina Environmental Management Commission; “Primary Nursery Areas” (PNA), including inland PNA, as designated by the North Carolina Marine Fisheries Commission and the NCWRC; or wetlands adjacent to these waters. Definitions of ORW, HQW and PNA waters can be found in the North Carolina State Administrative Code, Title 15A, Subchapters 2B and 10C (15A NCAC 02B, 15A NCAC 10C) and at the following World Wide Web page: http://reports.oah.state.nc.us/ncac.asp?folderName=\Title%2015A%20- %20Environmental%20Quality&lookUpError=15A%20NCAC%20000%20. Surface water classifications for waters in North Carolina can be viewed at the North Carolina Division of Water Resources website or at the following World Wide Web Page: https://deq.nc.gov/about/divisions/water-resources/planning/classification- standards/classifications Permittees who do not have internet access may contact the Corps at (910) 251- 4633. 2.3 Coastal Area Management Act (CAMA) Areas of Environmental Concern Non-federal permittees for any NWP in a designated “Area of Environmental Concern” (AEC) in the twenty (20) counties of Eastern North Carolina covered by the North Carolina Coastal Area Management Act (CAMA) must also obtain the required CAMA permit. Development activities for non-federal projects may not commence until a copy of the approved CAMA permit is furnished to the appropriate Wilmington District Regulatory Field Office (Wilmington Field Office – 69 Darlington Avenue, Wilmington, NC 28403, (910) 251-4802 or Washington Field Office – 2407 West 5th Street, Washington, NC 27889, (910) 251-4610). 2.4 Barrier Islands Prior to the use of any NWP on a barrier island of North Carolina, permittees must submit a PCN to the District Engineer prior to commencing the activity (see General Condition 32). 2.5 Mountain or Piedmont Bogs Prior to the use of any NWP in a Bog, as classified by the North Carolina Wetland Assessment Methodology (NCWAM), permittees shall submit a PCN to the District Engineer prior to commencing the activity (see General Condition 32). The latest version of NCWAM can be 27 viewed on the Corps RIBITS (Regulatory In-lieu Fee and Bank Information Tracking System) website or at the following World Wide Web Page: https://ribits.usace.army.mil/ribits_apex/f?p=107:27:0::NO::: 2.6 Animal Waste Facilities Prior to use of any NWP for construction of animal waste facilities in waters of the United States, including wetlands, permittees shall submit a PCN to the District Engineer prior to commencing the activity (see General Condition 32). 2.7 Trout Waters Prior to any discharge of dredge or fill material into streams, waterbodies or wetlands within the 294 designated trout watersheds of North Carolina, the permittee shall submit a PCN (see General Condition 32) to the District Engineer prior to commencing the activity, unless other thresholds are established in the Regional Conditions in Section 4 (Additional Regional Conditions for Specific Nationwide Permits). The permittee shall also provide a copy of the notification to the appropriate NCWRC office, or to the EBCI FWM Office (if the project is located on EBCI trust land), to facilitate the determination of any potential impacts to designated Trout Waters. Notification to the Corps will include a statement with the name of the NCWRC or EBCI FWM biologist contacted, the date of the notification, the location of work, a delineation of wetlands and waters, a discussion of alternatives to working in the mountain trout waters, why alternatives were not selected, and, if applicable, a plan to provide compensatory mitigation for all unavoidable adverse impacts to mountain trout waters. NCWRC and NC Trout Watersheds: NCWRC Contact** Counties that are entirely within Trout Watersheds* Counties that are partially within Trout Watersheds* Mountain Coordinator Balsam Depot 20830 Great Smoky Mountain Expressway Waynesville, NC 28786 Telephone: (828) 558-6011 For NCDOT Projects: NCDOT Coordinator 206 Charter. Street Albemarle, NC 28001 Telephone: (704) 982-9181 Alleghany Ashe Avery Graham Haywood Jackson Macon Swain Transylvania Watauga Burke Buncombe Caldwell Cherokee Clay Henderson Madison McDowell Mitchell Polk Rutherford Surry Wilkes Yancey 28 *NOTE: To determine notification requirements, contact the Corps Asheville Regulatory Field Office at (828) 271-7980 or view maps for each County at the following World Wide Web page: http://www.saw.usace.army.mil/Missions/Regulatory-Permit-Program/Agency- Coordination/Trout/. **If a project is located on EBCI trust land, submit the PCN in accordance with Section 3.14. Contact the Corps Asheville Regulatory Field Office at (828) 271-7980 with questions. 2.8 Western NC Waters and Corridors The permittee shall submit a PCN (see General Condition 32) to the District Engineer prior to commencing the activity in waters of the United States if the activity will occur within any of the following identified waters in western North Carolina, within 0.5 mile on either side of these waters, or within 0.75 mile of the Little Tennessee River, as measured from the top of the bank of the respective water (i.e., river, stream, or creek): Brasstown Creek Burningtown Creek Cane River Caney Fork Cartoogechaye Creek Chattooga River Cheoah River Cowee Creek Cullasaja River Deep Creek Ellijay Creek French Broad River Garden Creek Hiwassee River Hominy Creek Iotla Creek Little Tennessee River (within the river or within 0.75 mile on either side of this river) Nantahala River Nolichucky River North Fork French Broad River North Toe River Nottley River Oconaluftee River (portion not located on trust/EBCI land) Peachtree Creek Shooting Creek Snowbird Creek South Toe River Stecoah Creek Swannanoa River Sweetwater Creek 29 Tuckasegee River (also spelled Tuckaseegee or Tuckaseigee) Valley River Watauga Creek Watauga River Wayah Creek West Fork French Broad River To determine notification requirements, contact the Corps Asheville Regulatory Field Office at (828) 271-7980 or view maps for all corridors at the following World Wide Web page: http://www.saw.usace.army.mil/Missions/Regulatory-Permit-Program/Agency- Coordination/Designated-Special-Waters.aspx 3.0 List of Corps Regional Conditions for All Nationwide Permits The following conditions apply to all Nationwide Permits in the Wilmington District: 3.1 Limitation of Loss of Stream Bed NWPs may not be used for activities that may result in the loss or degradation of more than 300 total linear feet of stream bed, unless the District Engineer has waived the 300 linear foot limit for ephemeral and intermittent streams on a case-by-case basis and has determined that the proposed activity will result in minimal individual and cumulative adverse impacts to the aquatic environment. Waivers for the loss of ephemeral and intermittent streams must be in writing and documented by appropriate/accepted stream quality assessments*. This waiver only applies to the 300 linear feet threshold for NWPs. This Regional Condition does not apply to NWP 23 (Approved Categorical Exclusions). *NOTE: Permittees should utilize the most current methodology prescribed by Wilmington District to assess stream function and quality. Information can be found at: https://ribits.usace.army.mil/ribits_apex/f?p=107:27:0::NO::: 3.2 Mitigation for Loss of Stream Bed For any NWP that results in a loss of more than 150 linear feet of stream, the permittee shall provide a mitigation proposal to compensate for more than minimal individual and cumulative adverse impacts to the aquatic environment. For stream losses of 150 linear feet or less that require a PCN, the District Engineer may determine, on a case-by-case basis, that compensatory mitigation is required to ensure that the activity results in minimal adverse effect on the aquatic environment. 3.3 Pre-construction Notification for Loss of Streambed Exceeding 150 Feet Prior to use of any NWP for any activity which impacts more than 150 total linear feet of perennial stream, intermittent or ephemeral stream, the permittee shall submit a PCN to the District Engineer prior to commencing the activity (see General Condition 32). This applies to 30 NWPs that do not have specific notification requirements. If a NWP has specific notification requirements, the requirements of the NWP should be followed. 3.4 Restriction on Use of Live Concrete For all NWPs which allow the use of concrete as a building material, live or fresh concrete, including bags of uncured concrete, may not come into contact with the water in or entering into waters of the United States. Water inside coffer dams or casings that has been in contact with wet concrete shall only be returned to waters of the United States after the concrete is set and cured and when it no longer poses a threat to aquatic organisms. 3.5 Requirements for Using Riprap for Bank Stabilization For all NWPs that allow for the use of riprap material for bank stabilization, the following measures shall be applied: 3.5.1. Where bank stabilization is conducted as part of an activity, natural design, bioengineering and/or geoengineering methods that incorporate natural durable materials, native seed mixes, and native plants and shrubs are to be utilized to the maximum extent practicable. 3.5.2. Filter cloth must be placed underneath the riprap as an additional requirement of its use in North Carolina waters. The placement of filter fabric is not required if the riprap will be pushed or “keyed” into the bank of the waterbody. A waiver from the specifications in this Regional Condition may be requested in writing. The waiver will only be issued if it can be demonstrated that the impacts of complying with this Regional Condition would result in greater adverse impacts to the aquatic environment. 3.5.3. The placement of riprap shall be limited to the areas depicted on submitted work plan drawings. 3.5.4. The riprap material shall be clean and free from loose dirt or any pollutant except in trace quantities that would not have an adverse environmental effect. 3.5.5. It shall be of a size sufficient to prevent its movement from the authorized alignment by natural forces under normal conditions. 3.5.6. The riprap material shall consist of clean rock or masonry material such as, but not limited to, granite, marl, or broken concrete. 3.6 Requirements for Culvert Placement 3.6.1 For all NWPs that involve the construction/installation of culverts, measures will be included in the construction/installation that will promote the safe passage of fish and other aquatic organisms. The dimension, pattern, and profile of the stream above and below a pipe or culvert should not be modified by altering the width or depth of the stream profile in connection with the construction activity. The width, height, and gradient of a proposed culvert should be 31 sufficient to pass the average historical low flow and spring flow without adversely altering flow velocity. Spring flow is the seasonal sustained high flow that typically occurs in the spring. Spring flows should be determined from gage data, if available. In the absence of such data, bank-full flow can be used as a comparable indicator. In Public Trust Areas of Environmental Concern (AEC) and/or the Estuarine Waters AEC as designated by the Coastal Area Management Act (CAMA): All pipes/culverts must be sufficiently sized to allow for the burial of the bottom of the culvert at least one foot below normal bed elevation. In all other areas: Culverts greater than 48 inches in diameter will be buried at least one foot below the bed of the stream. Culverts 48 inches in diameter or less shall be buried to maintain aquatic passage and to maintain passage during drought or low flow conditions, and every effort shall be made to maintain the existing channel slope. Culverts must be designed and constructed in a manner that minimizes destabilization and head cutting. Destabilizing the channel and head cutting upstream should be considered and appropriate actions incorporated in the design and placement of the culvert. A waiver from the depth specifications in this condition may be requested, in writing, by the permittee and issued by the Corp; this request must be specific as to the reasons(s) for the request. The waiver will be issued if it can be demonstrated that the proposed design would result in less impacts to the aquatic environment. All counties: Culverts placed within riparian and/or riverine wetlands must be installed in a manner that does not restrict the flow and circulation patterns of waters of the United States. 32 Culverts placed across wetland fills purely for the purposes of equalizing surface water do not have to be buried, but the culverts must be of adequate size and/or number to ensure unrestricted transmission of water. 3.6.2 Bank-full flows (or less) shall be accommodated through maintenance of the existing bank- full channel cross sectional area. Additional culverts or culvert barrels at such crossings shall be allowed only to receive bank-full flows. 3.6.3 Where adjacent floodplain is available, flows exceeding bank-full should be accommodated by installing culverts at the floodplain elevation. Additional culverts or culvert barrels at such crossings should not be buried, or if buried, must have sills at the inlets to ensure that they only receive flows exceeding bank-full. 3.6.4 Excavation of existing stream channels shall be limited to the minimum necessary to construct or install the proposed culvert. The final width of the impacted stream at the culvert inlet and outlet should be no greater than the original stream width. A waiver from this condition may be requested in writing; this request must be specific as to the reason(s) for the request. The waiver will be issued if the proposed design would result in less impacts to the aquatic environment and/or if it can be demonstrated that it is not practicable to restore the final width of the impacted stream at the culvert inlet and outlet to the width of the original stream channel. 3.6.5 The width of the culvert shall be comparable to the width of the stream channel. If the width of the culvert is wider than the stream channel, the culvert shall include baffles, benches and/or sills to maintain the width of the stream channel. A waiver from this condition may be requested in writing; this request must be specific as to the reason(s) for the request. The waiver will be issued if it can be demonstrated that it is not practicable or necessary to include baffles, benches or sills and the design would result in less impacts to the aquatic environment. 3.7 Notification to NCDEQ Shellfish Sanitation Section Permittees shall notify the NCDEQ Shellfish Sanitation Section prior to dredging in or removing sediment from an area closed to shell fishing where the effluent may be released to an area open for shell fishing or swimming in order to avoid contamination from the disposal area and cause a temporary shellfish closure to be made. Such notification shall also be provided to the appropriate Corps Regulatory Field Office. Any disposal of sand to the ocean beach should occur between November 1 and April 30 when recreational usage is low. Only clean sand 33 should be used and no dredged sand from closed shell fishing areas may be used. If beach disposal were to occur at times other than stated above or if sand from a closed shell fishing area is to be used, a swimming advisory shall be posted, and a press release shall be issued by the permittee. 3.8 Submerged Aquatic Vegetation Impacts to Submerged Aquatic Vegetation (SAV) are not authorized by any NWP, except NWP 48, unless EFH Consultation has been completed pursuant to the Magnuson-Stevens Fisheries Conservation and Management Act (Magnuson-Stevens Act). Permittees shall submit a PCN (See NWP General Condition 32) to the District Engineer prior to commencing the activity if the project would affect SAV. The permittee may not begin work until notified by the Corps that the requirements of the Magnuson-Stevens Act have been satisfied and that the activity is authorized. 3.9 Sedimentation and Erosion Control Structures and Measures All PCNs will identify and describe sedimentation and erosion control structures and measures proposed for placement in waters of the United States. The structures and measures should be depicted on maps, surveys or drawings showing location and impacts to jurisdictional wetlands and streams. 3.10 Restoration of Temporary Impacts to Stream Beds Upon completion of work that involves temporary stream impacts, streambeds are to be restored to pre-project elevations and widths using natural streambed material such that the impacted stream reach mimics the adjacent upstream and downstream reach. The impacted area shall be backfilled with natural streambed material to a depth of at least 12 inches or to the bottom depth of the impacted area if shallower than 12 inches. An engineered in-stream structure or material can be used to provide protection of a buried structure if it provides benefits to the aquatic environment and can be accomplished by a natural streambed design. A permittee may request a waiver of this condition if it is determined a buried structure needs significant physical protection beyond those provided in this condition. This condition does not apply to NWP 27 – Aquatic Habitat Restoration, Enhancement, and Establishment Activities. 3.11 Restoration of Temporary Impacts to Stream Banks Upon completion of work involving temporary stream bank impacts, stream banks are to be restored to pre-project grade and contours or beneficial grade and contours if the original bank slope is steep and unstable. Natural durable materials, native seed mixes, and native plants and shrubs are to be utilized in the restoration. Natural designs which use bioengineered and/or geo- engineered methods are to be applied. An engineered structure or material can be used to provide protection of a buried structure if it provides benefits to the stream bank environment, provided it is not in excess of the minimum amount needed for protection and does not exceed an average of one cubic yard per running foot placed along the bank below the plane of the ordinary high water mark. A permittee may request a waiver of this condition if it is determined a buried structure 34 needs significant physical protection beyond those provided in this condition. This condition does not apply to NWP 27 – Aquatic Habitat Restoration, Enhancement, and Establishment Activities. 3.12 Federal Navigation Channel Setbacks and Corps Easements 3.12.1 Authorized structures and fills located in or adjacent to Federally authorized waterways will be constructed in accordance with the latest setback criteria established by the Wilmington District Engineer. You may review the setback policy at http://www.saw.usace.army.mil/Missions/Navigation/Setbacks.aspx. This general permit does not authorize the construction of hardened or permanently fixed structures within the Federally Authorized Channel Setback, unless the activity is approved by the Corps. The permittee shall submit a PCN (see General Condition 32) to the District Engineer prior to the construction of any structures or fills within the Federally Authorized Channel Setback. 3.12.2 The permittee shall obtain a Consent to Cross Government Easement from the Wilmington District’s Land Use Coordinator prior to any crossing of the Corps easement and/or prior to commencing construction of any structures, authorized dredging or other work within the right-of-way of, or in proximity to, a federally designated disposal area. The Land Use Coordinator may be contacted at: CESAW-OP-N, 69 Darlington Avenue, Wilmington, North Carolina 28403-1343, email: SAWWeb-NAV@usace.army.mil 3.13 Northern Long-eared Bat – Endangered Species Act Compliance The Wilmington District, U.S. Army Corps of Engineers has consulted with the United States Fish and Wildlife Service (USFWS) in regards to the threatened Northern long-eared bat (NLEB) (Myotis septentrionalis) and Standard Local Operating Procedures for Endangered Species (SLOPES) have been approved by the Corps and the USFWS. This condition concerns effects to the NLEB only and does not address effects to other federally listed species and/or federally designated critical habitat. A. Procedures when the Corps is the lead federal* agency for a project: The permittee must comply with (1) and (2) below when: • the project is located in the western 41 counties of North Carolina, to include non- federal aid North Carolina Department of Transportation (NCDOT) projects, OR; • the project is located in the 59 eastern counties of North Carolina, and is a non- NCDOT project. *Generally, if a project is located on private property or on non-federal land, and the project is not being funded by a federal entity, the Corps will be the lead federal agency due to the requirement to obtain Department of the Army authorization to impact waters of the United States. If the project is located on federal land, contact the Corps to determine the lead federal agency. 35 (1) A permittee using a NWP must check to see if their project is located in the range of the NLEB by using the following website: http://www.fws.gov/midwest/endangered/mammals/nleb/pdf/WNSZone.pdf. If the project is within the range of the NLEB, or if the project includes percussive activities (e.g., blasting, pile driving, etc.), the permittee is then required to check the appropriate website in the paragraph below to discover if their project: • is located in a 12-digit Hydrologic Unit Code area (“red HUC” - shown as red areas on the map), AND/OR; • involves percussive activities within 0.25 mile of a red HUC. Red HUC maps - for the western 41 counties in NC (covered by the Asheville Ecological Services Field Office), check the project location against the electronic maps found at: http://www.fws.gov/asheville/htmls/project_review/NLEB_in_WNC.html. For the eastern 59 counties in NC (covered by the Raleigh Ecological Services Field Office), check the project location against the electronic maps found at: https://www.fws.gov/raleigh/NLEB_RFO.html. (2) A permittee must submit a PCN to the District Engineer, and receive written authorization from the District Engineer, prior to commencing the activity, if the activity will involve any of the following: • tree clearing/removal, construction/installation of wind turbines in a red HUC, AND/OR; • bridge removal or maintenance, unless the bridge has been inspected and there is no evidence of bat use, (applies anywhere in the range of the NLEB), AND/OR: • percussive activities in a red HUC, or within 0.25 mile of a red HUC. The permittee may proceed with the activity without submitting a PCN to either the Corps or the USFWS, provided the activity complies with all applicable NWP terms and general and regional conditions, if the permittee’s review under A.(1) and A.(2) above shows that the project is: • located outside of a red HUC (and there are no percussive activities), and the activity will NOT include bridge removal or maintenance, unless the bridge has been inspected and there is no evidence of bat use, OR; • located outside of a red HUC and there are percussive activities, but the percussive activities will not occur within 0.25-mile of a red HUC boundary, and the activity will NOT include bridge removal or maintenance, unless the bridge has been inspected and there is no evidence of bat use, OR; 36 • located in a red HUC, but the activity will NOT include: tree clearing/removal; construction/installation of wind turbines; bridge removal or maintenance, unless the bridge has been inspected and there is no evidence of bat use, and/or; any percussive activities. B. Procedures when the USACE is not the lead federal agency: For projects where another federal agency is the lead federal agency - if that other federal agency has completed project-specific ESA Section 7(a)(2) consultation for the NLEB, and has (1) determined that the project would not cause prohibited incidental take of the NLEB, and (2) completed coordination/consultation that is required by the USFWS (per the directions on the respective USFWS office’s website), that project may proceed without notification to either the USACE or the USFWS, provided all General and Regional Permit Conditions are met. The NLEB SLOPES can be viewed on the USACE website at the following World Wide Web Page: http://www.saw.usace.army.mil/Missions/Regulatory-Permit-Program/Agency- Coordination/ESA/. Permittees who do not have internet access may contact the USACE at (910) 251- 4633. 3.14 Work on Eastern Band of Cherokee Indians Land All PCNs submitted for activities in waters of the United States on Eastern Band of Cherokee Indians (EBCI) trust land (i.e., Qualla Boundary and non-contiguous tracts of trust land), must comply with the requirements of the latest MOU between the Wilmington District and the Eastern Band of Cherokee Indians. 4.0 Additional Regional Conditions for Specific Nationwide Permits 4.1 NWP #12 - Utility Line Activities 4.1.1 Pipeline/utility line construction through jurisdictional waters and wetlands will be accomplished utilizing directional drilling/boring methods to the maximum extent practicable. 4.1.2 Temporary discharge of excavated or fill material into wetlands and waters of the United States will be for the absolute minimum period of time necessary to accomplish the work. Temporary discharges will be fully contained with appropriate erosion control or containment methods or otherwise such fills will consist of non-erodible materials. 4.1.3 The work area authorized by this permit, including temporary and/or permanent fills, will be minimized to the greatest extent practicable. Justification for work corridors exceeding forty (40) feet in width is required and will be based on pipeline diameter and length, size of equipment required to construct the utility line, and other construction information deemed necessary to support the request. The permittee is required to provide this information to the Corps with the initial notification package. 37 4.1.4 Excavated materials shall be returned to the excavated areas and any remaining materials shall be disposed of in uplands, unless the Corps authorizes disposal in waters of the United States. 4.1.5 In areas where a sub-aqueous utility line is to cross a federally-maintained channel, (i.e., the Atlantic Intracoastal Waterway [AIWW]), the line will be buried at least six (6) feet below the allowable overdepth of the authorized channel, including all side slopes. For areas outside federally-maintained channels, sub-aqueous lines must be installed at a minimum depth of two (2) feet below the substrate when such lines might interfere with navigation. 4.1.6 The minimum clearance*(see NOTE in 4.1.7) for aerial communication lines, or any lines not transmitting electrical power, will be ten (10) feet above the clearance required for nearby stationary bridges as established by the U.S. Coast Guard. In the event the U.S. Coast Guard has not established a bridge clearance, minimum vertical clearances for power and aerial lines will not be less than required by Section 23, Rule 232, of the latest revision of the National Electrical Safety Code (ANSI C2). Clearances will not be less than shown in Table 232-1, Item 7, ANSI C2. 4.1.7 The minimum clearance* for an aerial line, transmitting electrical power, is based on the low point of the line under conditions that produce the greatest sag, taking into consideration temperature, load, wind, length or span and the type of supports. The minimum clearance for an aerial electrical power transmission line crossing navigable waters of the United States, where there is an established bridge clearance established by the U.S. Coast Guard, shall be governed by the system voltage, as indicated below: Nominal System Minimum Clearance Voltage, kilovolt Above Bridge Clearance (As Established by the U.S. Coast Guard) 115 and below 20 feet 138 22 161 24 230 26 350 30 500 35 700 42 750 to 765 45 *NOTE: Minimum clearance is the distance measured between the lowest point of a stationary bridge, including any infrastructure attached to underside of the bridge, and the Mean High Water (MHW) of the navigable waters of the United States beneath the bridge. 4.1.8 On navigable waters of the United States, including all federal navigation projects, where there is no bridge for reference for minimum clearance, the proposed project will need to be reviewed by the Corps in order to determine the minimum clearance between the line and MHW necessary to protect navigational interests. 38 4.1.9 A plan to restore and re-vegetate wetland areas cleared for construction must be submitted with the required PCN. Cleared wetland areas shall be re-vegetated to the maximum extent practicable with native species of canopy, shrub, and herbaceous species. Fescue grass shall not be used. 4.1.10 Any permanently maintained corridor along the utility right of way within forested wetlands shall be considered a permanent impact. A compensatory mitigation plan will be required for all such impacts associated with the requested activity if the activity requires PCN and the cumulative total of permanent forested wetland impacts exceeds 1/10-acre, unless the District Engineer determines in writing that either some other form of mitigation would be more environmentally appropriate or the adverse effects of the proposed activity are minimal. For permanent forested wetland impacts of 1/10-acre or less, the District Engineer may determine, on a case-by-case basis, that compensatory mitigation is required to ensure that the activity results in minimal adverse effects on the aquatic environment. 4.1.11 Use of rip-rap or any other engineered structures to stabilize a stream bed should be avoided to the maximum extent practicable. If riprap stabilization is needed, it should be placed only on the stream banks, or, if it is necessary to be placed in the stream bed, the finished top elevation of the riprap should not exceed that of the original stream bed. 4.1.12 When directional boring or horizontal directional drilling (HDD) under waters of the United States, including wetlands, permittees shall closely monitor the project for hydraulic fracturing or “fracking.” Any discharge from hydraulic fracturing or “fracking” into waters of the United States, including wetlands, shall be reported to the appropriate Corps Regulatory Field Office within 48 hours. Restoration and/or compensatory mitigation may be required as a result of any unintended discharges. 4.1.13 For purposes of this NWP, the term utility line does not include pipes or culverts associated with driveways, roadways, lots, etc. 4.1.14 The permittee shall submit a PCN to the District Engineer prior to commencing the activity if the activity will involve the discharge of dredged or fill material into more than 1/10- acre of wetlands or 150 linear feet of stream channel for the construction of temporary access fills and/or temporary road crossings. The PCN must include a restoration plan that thoroughly describes how all temporary fills will be removed, describes how pre-project conditions will be restored, and includes a timetable for all restoration activities.