Loading...
HomeMy WebLinkAbout20190909 Ver 1_EB-5923 Skyland Dr PERMIT DRAWINGS_annotated__20190708STwTe STATB PRO]BCT RBFeReNCe N SH66T NO. TOTAL SH88TS Nod. EB-5923 � 8TAT6 PROI. NO. A.APAOS.NO DDHCRIP'fION 47589.1.1 WA PE 47589.2.1 WA WW & UTIL 47589.3.1 WA CONST. STATE OF NORTH CAROLINA DIVISION OF HIGHWAYS sal nz ■ 144z 1522 N END1439 1 24 1443 �Z JACKSON COUNTY PROJECT ON PROJECT 1 2 1440 1511 23 1 9Fe�1439 14 1 144 ]4 1� 1786 M LOCATION: SR 1432 (SKYLAND DRIVE) FROM = 147 US 23 BUS (ASHEVILLE HWY) TO W 437 a„ , Vim„ SR 1429 (CHIPPER CURVE RD. ) lsos 2]40 L' • 1- 33 TYPE OF WORK: SIDEWALK, GRADING, DRAINAGE, RETAINING WALL, PAVING CAI Harold SL �% 1793 V Sylva BEGIN a 13H PERMIT DRAWINGS BEGIN �T1 Norfolk � la PROJECT 1449 IV\ Oz" 3 1Z1� O s PERMIT DRAWING 1 lv.J ius SHEET 1 OF 4 12. 1355 ,D] �?� 14a9 1354 ]zo VICINITY MAP NOT TO SCALE 6 7 E D PROJECT EB-5923 \ -L- ST 5+92 SR N432 (SOLAN p DRNE I I. ----------------------------- � � e S19 PROJECT EB-5923 A � CN � �o a O lee Mattern & Craig SURVEYORS 12 BROAD STREET ASHEVILLE, NORTH CAROLINA 28801 (828) 254-2201 DOCUMENT NOT CONSIDERED FINAL CLEARING ON THIS PROJECT SHALL BE PERFORMED TO THE LIMITS ESTABLISHED BY METHOD H FAX (828) 254-4562 UNLESS ALL SIGNATURES COMPLETED V GRAPHIC SCALES DESIGN DATA PROJECT LENGTH HYDRAULICS ENGINEER12 30 15 0 30 60 V = 40 MPH PLANS FUNC CLASS = LENGTH OF ROADWAY TIP PROJECT EB-5923 = 0.645 MILES SUB —REGIONAL TIER P.E. SIGNATURE: m 59 - ROADWAY DESIGN AADT: 6900 TOTAL LENGTH OF TIP PROJECT EB-5923 0.645 MILES ENGINEER OOP Tit A��� V P.E. SIGNATURE. Prepared In the Offloe of: MATTERNoAf� ] CRAIG ASAP P]LLP, NC 38801 FOR NCL10r DIVISION OF HIGHWAYS 2018 STANDARD SPECIFICATIONS AARON CARVER, PE RIGHT OF WAY DATE: PROJECT ENGINEER NICK WOODS J U N E 2018 PROJECT DESIGN ENGINEER LETTING DATE: APRIL 2019 WES JAMESON, PE NCDOT DIVISION ]4 CONTACT I, I, WETLAND AND SURACE WATER IMPACTS SUMMARY WETLAND IMPACTS SURFACE WATER IMPACTS Site No. Station (From/To) Structure Size / Type Permanent Fill In Wetlands (ac) Temp. Fill In Wetlands (ac) Excavation in Wetlands (ac) Mechanized Clearing in Wetlands (ac) Hand Clearing in Wetlands (ac) Permanent SW impacts (ac) Temp. SW impacts (ac) Existing Channel Impacts Permanent (ft) Existing Channel Impacts Temp. (ft) Natural Stream Design (ft) 1 -L- 43+73 LT TO 43+83 LT Creek Excavation/Armoring 0.01 < 0.01 -L- 42+84 RT TO 43+24 RT Creek Excavation/Bank Stabilization 0.01 -L- 43+21 RT TO 43+53 RT 60" CSP 10 -L- 43+64 LT TO 43+94 LT 60" CSP 7 TOTALS*: 0.02 < 0.01 16 0 0 *Rounded totals are sum of actual impacts NOTES: 2018 Feb