Loading...
HomeMy WebLinkAbout20190908 Ver 1_Haywood County - B276 - Full Plan Set_20190708o' IT Fi T I 0 L H v 0 See Sheet 1 A For Index of Sheets (Not Included) See Sheet 9 B For Symbology Sheet PO y� 30 aao Meadow Grove Ch. 1104 M V m 276 WHY WORRY BLVD SCRUSO RD R 1103 5 1110 PROJECT 1 OS LOCATION �4 110 BURNETTE COVE RD SR 1104 1104 Q VICINITY MAP 90% SUBMITTAL PLANS STATE OF NORTH CAROLINA DIVISION OF HIGHWAYS HAYWOOD BEGIN TIP PROJECT 17BP.14.R.176 -L- STA. 9+00.00 THIS PROJECT HAS NO CONTROL OF ACCESS. COUNTY LOCATION: REPLACEMENT OF BRIDGE No. 276 OVER B URNETTE CREEK ON SR 1104 (BURNETTE COVE RD) TYPE OF WORK. GRADING, DRAINAGE, WIDENING, CORED BRIDGE AND PAVEMENT MARKINGS END CONSTRUCTION -D R 1- STA. 11 +20.00 /S STEPS F `W 0 \o END CONSTRUCTION -DR2- STA. 10+23.00 END BRIDGE -L- STA. 12+21.17 0 BURNETTE CREEK\/------ � -L- BEGIN BRIDGE -L- STA. 11 +76.17 IWROW*06 SLAB o \\ Fj7, �s � sFc �p F STATE STATE PROJECT REFERENCE NO. SHEET NO. TOTAL SHEETS N.C. 17BP.14.R.176 I STATE PROJ. NO. F. A. PROJ. NO. DESCRIPTION 17BP.14.R.176 WA PE 17BP.14.R.176 WA RIGHT-OF-WAY 17BP.14.R.176 WA CONSTRUCTION \10 END CONSTRUCTION -DR3- STA. 10+33.00 END CONSTRUCTION -L- STA. 15+05.00 Al� 'S F a ✓s� (D s °s 4� END TIP PROJECT 17BP.14.R.176 -L- STA. 13+94.00 DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED GRAPHIC SCALES 50 25 0 50 100 DESIGN DATA77 ADT 2 011 = 6 0 VPD 9 V = 25 MPH* FUNC CLASS —LOCAL SUBREGIONAL TIER *BRIDGE DESIGN SPEED INVESTIGATION PROJECT LENGTH LENGTH ROADWAY PROJECT 17BP.14.R.176 = 0.085 MI LENGTH STRUCTURE PROJECT 17BP.14.R.176 = 0.009 MI TOTAL LENGTH PROJECT 17BP.14.R.176 = 0.094 MI PREPARED IN THE OFFICE OF �vSP USA " SUITE E 1500'EVILLE STREET SUITE 15°° RALEIUH NC 27601 TEL:1.919.836.4040 FAX:1.919.836.4099 LICENSE NO.F_0165 FOR THE NORTH CAROLINA DEPARTMENT OF TRANSPORTATION HYDRAULICS ENGINEER ♦ ..• .. ,� off.• FESso • j� � �;' �� �9 • �9 � • Q i SEAL . _ 27876 = ' 9 �y`��� '�iq�A ..ST P�� �` A.E. �//111111���� SIGNATURE: � a 9 ��s QQ �� o� p PLANS 50 25 0 50 100 2018 STANDARD SPECIFICATIONS RONYELL THIGPEN, PE RIGHT OF WAY DATE: JUNE 30 2018 ROADWAY DESIGN c AR'1'', ENGINEER \ o�;FESSIONgI.r�=; ; •:� _ 043A39 _ _� : : '=��'•••FNGINEF�.:���J� ''' P.E. SIGNATURE: PROJECT ENGINEER HOLLY CHRISTENBURY PROFILE (HORIZONTAL) 10 5 0 10 20 LETTING DATE: JAN UARY 2 8 2 02 0 1 PROJECT DESIGN ENGINEER NCDOT CONTACT: JOSH DEYTON, PE DIVISION 14 BRIDGE PROGRAM MANAGER PROFILE (VERTICAL) I C r C M 0 0 L c9 0 L 0 06 C CL 0 0 LO N GENERAL NOTES: 2018 SPECIFICATIONS INDEX OF SHEETS EFFECTIVE: 01-16-18 SHEET NUMBER SHEET REVISED: 1 TITLE SHEET GRADING AND SURFACING OR RESURFACING AND WIDENING: lA INDEX OF SHEETS, GENERAL NOTES, AND LIST OF STANDARD DRAWINGS THE GRADE LINES SHOWN DENOTE THE FINISHED ELEVATION OF THE PROPOSED SURFACING AT GRADE POINTS SHOWN ON THE TYPICAL SECTIONS. WHERE NO GRADE LINES 2018 ROADWAY ENGLISH STANDARD DRAWINGS 113 CONVENTIONAL SYMBOLS ARE SHOWN, THE PROFILES SHOWN DENOTE THE TOP ELEVATION OF THE EXISTING PAVEMENT 1C-1 SURVEY CONTROL SHEET ALONG THE CENTER LINE OF SURVEY ON WHICH THE PROPOSED RESURFACING WILL BE The following Roadway Standards as appear in "Roadway Standard Drawings" Highway Design PLACED. GRADE LINES MAY BE ADJUSTED BY THE ENGINEER IN ORDER TO SECURE A Branch - N. C. Department of Transportation -Raleigh, N. C., Dated January, 2018 are 2A-1 PAVEMENT SCHEDULE, TYPICAL SECTIONS, AND PROPER TIE-IN. applicable to this project and by reference hereby are considered a part of these plans: WEDGING DETAILS CLEARING: STD.NO. TITLE 3B-1 MISCELLANEOUS SUMMARIES (EARTHWORK, GUARDRAIL, PAVEMENT REMOVAL, & SHOULDER BERM GUTTER) CLEARING ON THIS PROJECT SHALL BE PERFORMED TO THE LIMITS ESTABLISHED BY DIVISION 2 - EARTHWORK 3D-1 DRAINAGE SUMMARY METHOD II. 200.02 225.02 Method of Clearing - Method II 4 PLAN SUPERELEVATION: 225.04 Guide for Grading Subgrade - Secondary and Local 5 PROFILE SHEET Method of Obtaining Superelevation - Two Lane Pavement ALL CURVES ON THIS PROJECT SHALL BE SUPERELEVATED IN ACCORDANCE WITH STD. TMP-1 THRU TMP-5 TRAFFIC MANAGEMENT PLANS NO. 225.04 USING THE RATE OF SUPERELEVATION AND RUNOFF SHOWN ON THE PLANS. DIVISION 3 - PIPE CULVERTS SUPERELEVATION IS TO BE REVOLVED ABOUT THE GRADE POINTS SHOWN ON THE TYPICAL 300.01 Method of Pipe Installation PMP-1 PAVEMENT MARKING PLANS SECTIONS. 300.10 Driveway Pipe Construction EC-1 THRU EC-5 EROSION CONTROL PLANS SHOULDER CONSTRUCTION: X-1A CROSS-SECTION SUMMARY DIVISION 4 -MAJOR STRUCTURES X-1 THRU X-8 CROSS -SECTIONS ASPHALT, EARTH, AND CONCRETE SHOULDER CONSTRUCTION ON THE HIGH SIDE OF 422.01 Bridge Approach Fills - Type I Standard Approach Fill SUPERELEVATED CURVES SHALL BE IN ACCORDANCE WITH STD. NO. 560.01. S-1 THRU S-X STRUCTURE PLANS GUARDRAIL: DIVISION 5 - SUBGRADE, BASES AND SHOULDERS SN STANDARD NOTE SHEET 560.01 Method of Shoulder Construction - High Side of Superelevated Curve - Method THE GUARDRAIL LOCATIONS SHOWN ON THE PLANS MAY BE ADJUSTED DURING CONSTRUCTION AS DIRECTED BY THE ENGINEER. THE CONTRACTOR SHOULD CONSULT WITH THE ENGINEER PRIOR TO ORDERING GUARDRAIL MATERIAL. DIVISION 8 - INCIDENTALS 806.01 Concrete Right -of -Way Marker TEMPORARY SHORING: 806.02 Granite Right -of -Way Marker 840.00 Concrete Base Pool for Drainage Structures SHORING REQUIRED FOR THE MAINTENANCE OF TRAFFIC NOT SHOWN ON THE PLANS 840.25 Anchorage for Frames - Brick or Concrete or Precast WILL BE PAID FOR AT THE CONTRACT PRICE FOR "TEMPORARY SHORING". 840.29 Frames and Narrow Slot Flat Grates 840.35 Traffic Bearing Grated Drop Inlet - for Cast Iron Double Frame and Grates SUBSURFACE PLANS: 840.46 Traffic Bearing Precast Drainage Structure 846.04 Drop Inlet Installation in Shoulder Berm Gutter NO SUBSURFACE PLANS ARE AVAILABLE ON THIS PROJECT. THE CONTRACTOR SHOULD MAKE 862.01 Guardrail Placement HIS OWN INVESTIGATION AS TO THE SUBSURFACE CONDITIONS. 862.02 Guardrail Installation 862.03 Structure Anchor Units END BENTS: 876.01 Rip Rap in Channels 876.02 Guide for Rip Rap at Pipe Outlets THE ENGINEER SHALL CHECK THE STRUCTURE END BENT PLANS, DETAILS, 876.04 Drainage Ditches with Class 'B' Rip Rap AND CROSS-SECTION PRIOR TO SETTING OF THE SLOPE STAKES FOR THE EMBANKMENT OR EXCAVATION APPROACHING A BRIDGE. UTILITIES: UTILITY OWNERS ON THIS PROJECT ARE: Power: Haywood EMC Telephone: AT&T ANY RELOCATION OF EXISTING UTILITIES WILL BE ACCOMPLISHED BY OTHERS, EXCEPT AS SHOWN ON THE PLANS. RIGHT-OF-WAY MARKERS: ALL RIGHT-OF-WAY MARKERS ON THIS PROJECT SHALL BE PLACED BY CONTRACT IN ACCORDANCE WITH SECTION 801 OF THE NCDOT STANDARD SPECIFICATIONS FOR ROADS AND STRUCTURES. U COCO CDM NCO \cc CO— NO. CD N N N BOUNDARIES AND PROPERTY.- State Line ---- ----- County Line Township Line City Line Reservation Line Property Line Existing Iron Pin O Computed Property Corner X Property Monument ECM Parcel/Sequence Number 123 Existing Fence Line -x x x- Proposed Woven Wire Fence e- Proposed Chain Link Fence Proposed Barbed Wire Fence Existing Wetland Boundary - - - -WLB- - - - Proposed Wetland Boundary WLB Existing Endangered Animal Boundary EAB Existing Endangered Plant Boundary EPB Existing Historic Property Boundary_HPB Known Contamination Area: Soil S �- Potential Contamination Area: Soil - S :X - Known Contamination Area: Water W �- Potential Contamination Area: Water - W :M - Contaminated Site: Known or Potential � BUILDINGS AND OTHER CULTURE: Gas Pump Vent or U/G Tank Cap O Sign S Well W w Small Mine Foundation 0 Area Outline Cemetery fi Building School Church Dam HYDROLOGY.- Stream or Body of Water Hydro, Pool or Reservoir IF -- Jurisdictional Stream ,S Buffer Zone I _BZ 1 Buffer Zone 2 BZ 2 Flow Arrow < -- --- Disappearing Stream Spring Wetland Proposed Lateral, Tail, Head Ditch False Sump FLOW w RAILROADS. - Standard Gauge - RR Signal Milepost Switch RR Abandoned RR Dismantled — STATE OF NORTH CAROILINA, DIVISION OF HIGHWAYS CONVENTIONAL PLAN SHEET SYMBOLS Note: Not to Scale *S. U.E. _ CSX TRANSPORTATION 0 MILEPOST 35 0 SWITCH RIGHT OF WAY & PROJECT CONTROL: Secondary Horiz and Vert Control Point Primary Horiz Control Point C Primary Horiz and Vert Control Point Exist Permanent Easment Pin and Cap 0 New Permanent Easement Pin and Cap 0 Vertical Benchmark 11 Existing Right of Way Marker 0 Existing Right of Way Line New Right of Way Line w New Right of Way Line with Pin and Cap — New Right of Way Line with R Concrete or Granite R/W Marker w New Control of Access Line with c Concrete C/A Marker A Existing Control of Access New Control of Access Existing Easement Line E New Temporary Construction Easement E New Temporary Drainage Easement TDE New Permanent Drainage Easement PDE New Permanent Drainage / Utility Easement DUE New Permanent Utility Easement PUE New Temporary Utility Easement TUE New Aerial Utility Easement AUE ROADS AND RELATED FEATURES: Existing Edge of Pavement Existing Curb — Proposed Slope Stakes Cut - - - C - - Proposed Slope Stakes Fill - - - F - - Proposed Curb Ramp ER Existing Metal Guardrail T T Proposed Guardrail T T T Existing Cable Guiderail n n n Proposed Cable Guiderail n n n Equality Symbol 0 Pavement Removal VEGETATION - Single Tree Single Shrub Subsurface Utility Engineering Hedge Woods Line Orchard Vineyard EXISTING STRUCTURES: MAJOR: Bridge, Tunnel or Box Culvert Bridge Wing Wall, Head Wall and End Wall - MINOR: Head and End Wall Pipe Culvert Footbridge Drainage Box: Catch Basin, DI or JB Paved Ditch Gutter Storm Sewer Manhole Storm Sewer UTILITIES.' POWER: Existing Power Pole Proposed Power Pole Existing Joint Use Pole Proposed Joint Use Pole Power Manhole Power Line Tower Power Transformer U/G Power Cable Hand Hole H-Frame Pole U/G Power Line LOS B (S.U.E.*) U/G Power Line LOS C (S.U.E.*) U/G Power Line LOS D (S.U.E.*) TELEPHONE: Existing Telephone Pole Proposed Telephone Pole Telephone Manhole Telephone Pedestal Telephone Cell Tower U/G Telephone Cable Hand Hole U/G Telephone Cable LOS B (S.U.E.*) - U/G Telephone Cable LOS C (S.U.E.*) - U/G Telephone Cable LOS D (S.U.E.*) - U/G Telephone Conduit LOS B (S.U.E.*) U/G Telephone Conduit LOS C (S.U.E.*) U/G Telephone Conduit LOS D (S.U.E.*) U/G Fiber Optics Cable LOS B (S.U.E.*) U/G Fiber Optics Cable LOS C (S.U.E.*) U/G Fiber Optics Cable LOS D (S.U.E.*) 0 0 0 0 Vineyard CONC ) CONC WW CONC HW 11 CB O -s --- -T- - -- - -T- T -TC- - - - -TC- - TC -T FO- - - - -T FO- - T FO WATER: Water Manhole Water Meter o Water Valve Water Hydrant U/G Water Line LOS B (S.U.E*) - - - -W- - - - U/G Water Line LOS C (S.U.E*) - -W- - U/G Water Line LOS D (S.U.E*) W Above Ground Water Line A/G Water TV: TV Pedestal TV Tower U/G TV Cable Hand Hole "H U/G TV Cable LOS B (S.U.E.*) - - - -TV- - - U/G TV Cable LOS C (S.U.E.*) - -TV- - U/G TV Cable LOS D (S.U.E.*) TV U/G Fiber Optic Cable LOS B (S.U.E.*) - - - -TV FO- - - U/G Fiber Optic Cable LOS C (S.U.E.*) - -TV FO- U/G Fiber Optic Cable LOS D (S.U.E.*) TV FO- GAS: Gas Valve Gas Meter U/G Gas Line LOS B (S.U.E.*) - - - -°- - - - U/G Gas Line LOS C (S.U.E.*) - -°- - U/G Gas Line LOS D (S.U.E.*) ° Above Ground Gas Line A/G Gas SANITARY SEWER: Sanitary Sewer Manhole Sanitary Sewer Cleanout U/G Sanitary Sewer Line Above Ground Sanitary Sewer SS Forced Main Line LOS B (S.U.E.*) SS Forced Main Line LOS C (S.U.E.*) SS Forced Main Line LOS D (S.U.E.*) MISCELLANEOUS: Utility Pole Utility Pole with Base Utility Located Object Utility Traffic Signal Box Utility Unknown U/G Line LOS B (S.U.E.*) U/G Tank; Water, Gas, Oil Underground Storage Tank, Approx. Loc. A/G Tank; Water, Gas, Oil Geoenvironmental Boring U/G Test Hole LOS A (S.U.E.*) Abandoned According to Utility Records End of Information O O ss A/G Sanitary Sewer -FSS- - - - Fss 00 0 N 0-�� �o� NORTHCOMPUTED BY: Vm DATE: 6/11118 CHECKED BY: RS DATE: 6/11/18 • OF • • DIVISIONOF Note: Invert Elevations indicated are for Bid Purposes only and shall not be used for project construction stakeout. See "Standard Specifications For Roads and Structures, Section 00 LIST OF PIPES, END WALLS, ETC. (FOR PIPES 48 INCHES & UNDER) LINE & STATION 0mmmmmmmommmmmmmommmmmmmmmmmmmmmo Q. Drainage Pipe R. C. PIPE CLASS III R. C. PIPE CLASSIV .N.S. STRUCTURES NOTE: TOTAL LIN. FT. F R PAY QUANTITY FRAME, GRATES AND HOOD ..... ...______ ABBREVIATIONS C.A.A. CORRUGATED ALUMINUM ALLOY C.B. CATCH BASIN C.S. CORRUGATED STEEL D.I. DROP INLET G.D.I. GRATED DROP INLET H.D.P.E. HIGH DENSITY POLYETHYLENE U.S. JUNCTION BOX NARROW SLOT R. C. REINFORCED CONCRETE W S WIDE SLOT ®z oom ©oo._.. r tN Z 0 w w 00 BEGIN APPROACH SLAB END APPROACH SLAB -L- STA. 11 +65J7 -L- STA. 12+32•I8 �4' PS TRANSITION R=10' 0" PS TO I" PS T APPROACH SLAB 4/* o YPE 111 - SBG =20' GREU T L -2 o BEGIN BRIDGE -L - STA. 11 +76.17 GREU T L -2 24' -/0" CLEAR END BRIDGE RDWY -L- STA. 12+2/•I7 SKETCH SHOWING DIMENSION OF PAVEMENT AND SHOULDERS IN RELATION TO PROPOSED BRIDGE WIDTH 0 PAVED SHOULDER BEGIN TIP PROJECT 178P°I4°R°I76 -L- STA. 9+00°00 FEDERAL NATIONAL MORTGAGE ASSN. DB RB 894 PG 684 PATRICIA LYNN PATERSON DB RB 897 PG 749 O / o S ROCK D x� 9 RETAIN �!T +00.00 �GPS 2 OEiP 14 -0 /S "' 0 -/NV=298 .0// 004' 16 25.00 vJ�o° z 6A 6 W W 00� _W m O O o° QO � v Q_ Q_ Z Ln AUSTIN R. GRIFFIN N � DB RB 844 PG 949 Q Co m BEGIN CONSTRUCTION -DRI -Sta. 11 +20°00 -D OT Sta. 1I +52.30 Z 0) a OW N M. S oq° 2s- O rr �� (A)�6S 3 26„F O 6 LESSLEY D. GRIFFIN, ET AL (( j EiP DB RB 888 PG 877 / 0+25.00-DRI- 8.00 +50.00 `s%`a i9� Gp� 8.00 GRA E T Q 20.0 RAI S 33° 07' 4I °2" E -DRI -Sta• 10+40°93 -DR2-Sta• 10+00.00 A tN Z 0 w w 00 BEGIN APPROACH SLAB END APPROACH SLAB -L- STA. 11 +65J7 -L- STA. 12+32•I8 �4' PS TRANSITION R=10' 0" PS TO I" PS T APPROACH SLAB 4/* o YPE 111 - SBG =20' GREU T L -2 o BEGIN BRIDGE -L - STA. 11 +76.17 GREU T L -2 24' -/0" CLEAR END BRIDGE RDWY -L- STA. 12+2/•I7 SKETCH SHOWING DIMENSION OF PAVEMENT AND SHOULDERS IN RELATION TO PROPOSED BRIDGE WIDTH 0 PAVED SHOULDER BEGIN TIP PROJECT 178P°I4°R°I76 -L- STA. 9+00°00 FEDERAL NATIONAL MORTGAGE ASSN. DB RB 894 PG 684 PATRICIA LYNN PATERSON DB RB 897 PG 749 O / o S ROCK D x� 9 RETAIN �!T +00.00 �GPS 2 OEiP 14 -0 /S "' 0 -/NV=298 .0// 004' 16 25.00 vJ�o° z 6A 6 W W 00� _W m O O o° QO � v Q_ Q_ Z Ln AUSTIN R. GRIFFIN N � DB RB 844 PG 949 Q Co m BEGIN CONSTRUCTION -DRI -Sta. 11 +20°00 -D OT Sta. 1I +52.30 Z 0) a OW N M. S oq° 2s- O rr �� (A)�6S 3 26„F O 6 LESSLEY D. GRIFFIN, ET AL (( j EiP DB RB 888 PG 877 / 0+25.00-DRI- 8.00 +50.00 `s%`a i9� Gp� 8.00 GRA E T Q 20.0 RAI S 33° 07' 4I °2" E -DRI -Sta• 10+40°93 -DR2-Sta• 10+00.00 A • 6LOA ����© ��� w _ 1_ -cm Mm 'k BST TB 1201 Q 25.uv F O\ 146.65 0�00/� E / 30.00 95.00 R= �X\� ° �� 34.00 <� O X�� I SSF D Q)� 25.00 0 +27.00 50.00 30.00 / 25.00 O •,+27.00 +50.00 33.00 30.00 SPECIAL LATERAL 'V' DITCH I `" STA. 10 + 25 TO STA. 11 + 00 -L- RT -_I �, w SEE DETAIL A SPECIA LATERAL 'V' DITCH STA. 11 30 TO STA. 11 + 68 -L- RT 06 S0, SEE TAIL A N 0 N a I M� ^. J i� \ i� 040. F �I R=20' }V/ rue-jPDE 0404 +48.0 25.0 / CL B RIP RAP +18.00 S�2 TON 25..00 GEOTEXTILE 0406 CL B I P NTR 1 T N 5 SY G OTEXTI +18.00 �^ 33.00 'W 0 0/% BEGIN CONSTRUCTION -DR2-Sta° 10+23°00 -DRI -Sta• 10+35.20 z �,Q -DR3-Sta° 10+00°00 N � J cy 6' o rn BEGIN CONSTRUCTION -DR3-Sta° 10+33.00 LINE w/ N 23°50'1l11 W CL B RIPRAP 80,68' EST TONS = 24 cn A EST SY GEOTEXTILE = 53 o o ERIC ILSON °' DB R 831 PG 775 m 6 \' SPECIAL LATERAL 'V' DITCH STA. 13 + 50 TO STA. 15 + 03 -L- LT G SEE DETAIL A �X +94.00 S 60.00 ➢ , '� \ 9 `p O +94.00 32.00 D TIP PROJECT 7BP•14•R.176 -L- STA. /3+94.00 v F +05.00 32.00 FIi �" BT F ✓s 2200 ROBERT DALTON SCOTT DB RB 895 PG 2493 �% • O S 25.00 F63.00 G' ;)5.00 +50.0 \cO�F L BM-2, ELEV. 2951.95' 22.50 Ali N ��o STA. 11+59.78 31.16' LT 1-63.00 P 03° i 56.52 27.000 \r7 9903, RR SPIKE SET IN BASE OF 46" TRIPLE ASH PROJECT REFERENCE NO. 17BP°14°R°176 RAW/ SHEET NO. ROADWAY DESIGN ENGINEER \\<F E Rol Alp OC////� \ Q,:.QQO N9l ;ram SEAL = '��i• FNGINE��' ••�J\ C H RAC) SHEET NO. 4 HYDRAULICS ENGINEER `\\%% IC ARo t��i♦ '• e SEAL 27876 ♦j n% �/ G I NEEC,•' �� DOCUMENT NOT CONSIDERED FINAL I UNLESS ALL SIGNATURES COMPLETED WSP USA 434 FAYETTEVILLE STREET " SUITE 1500 RALEIGH NC 27601 TEL: 1.91q.836.4040 FAX: 1.919.836.4099 LICENSE NO. F-0165 DETAIL A SPECIAL LATERAL 'V' DITCH ( Not to Scale) Natural 1 Fill Ground Z.� D Slope Min. D= 1.0 Ft. FROM STA. 10 + 25 TO STA. 11 + 10 -L- RT FROM STA. 11 + 30 TO STA. 11 + 68 -L- RT FROM STA. 13 + 50 TO STA. 15 + 03 -L- LT DETAIL B STANDARD 'V' DITCH ( Not to Scale) Natural Natural Ground A Ground ?.� D . Min. D = 1.0 Ft. FROM STA. 11 + 68 TO 12 + 08 -L- RT DETAIL C RIP RAP AT EMBANKMENT ( Not to Scale) 10'min. Ditch 1.0'min. I 1 Grade GEOTEXTILE Type of Liner= 4 TONS,CL I Rip -Rap Geotextile= 10 sy FROM STA. 12 + 04 TO STA. 12 + 16 -L- RT *NOTE: AREA BETWEEN PROPOSED BRIDGE AND DRIVEWAY IS TO BE EXCAVATED TO REMOVE THE EXISTING BRIDGE. THE AREA IS TO BE GRADED TO DRAIN INTO THE STREAM FIELD NOTES: NO EXISTING ROADWAY DITCHES WITHIN THE PROJECT LIMITS EXISTING 24" CMP IN GOOD CONDITION -DR3- TO BE GRADED AS SHOWN IN RSD 848.03. �� 3o�gs38 w JACK STEVEN DEAVER, ET AL \��� 238'o�N �\ S N 4° 59 00.0E N li° 39 �'% X DB RB 774 PG 1411 8�oV7„w +48.00���\��� o0N0 �' i BM -I, ELEV. 2984.08 O °' ` 3172 v � S> S +29.43 Gp i' N 2 26, N /0 SS, STA. 5+63°10 112°52 RT N3 vi 11 l � 25.00 RR SPIKE SET IN BASE OF � 39„ ., 32" CHINESE CHESTNUT 206' JOSEPH F. GLOVER CAROLYN R. SINGLETON/ DB 299 PG 234 DB 436 PG 2016 CV ���\ END CONSTRUCTION ANDARD 'V' DITCH N N 203 669„ w �I -L- STA. 15+05.00 TA. 11 + 68 TO 12 + 08 -L- RT-14 �Q / EE DETAIL C /q > NO n co Fip CL I RIP RAP -L-PT Sta. I3+17°62 6 TON N Y 42' 00.0" E c9 12 SY GEOTEXTILE RIPRAP AT EMBANKMENT STA. 12 + 08 TO m STA. 12 + 16 -L- RT SEE DETAIL C -L- POC Sta• 12+61.48= 25' MILLING /RESURFACING -DRI - POT Sta. 10+00°00 -41 o v PAVEMENT REMOVAL o� r ��_ PAVED SHOULDER L 00 0 N oo� c9C STATE OF NORTE CAROLINA DIVISION OF HIGHWAYS TRANSPORTATION MANAGEME..NT PLAIN HAYWOOD BEGIN PROJECT -L- STA. 9+00 COUNTY �01 I ' END PROJECT /L - STA . 13+94 + / - is ------ - - - -- / �s - Js BURNETTE � ' REEK ' SHEET NO. I1VDEX OF SHEETS TMP-1 SHEET —NO. TITLE TMP-1 TITLE SHEET, VICINITY MAP AND INDEX OF SHEETS TMP-2 ROADWAY STANDARD DRAWINGS AND LEGEND TMP-3 GENERAL NOTES AND WRITTEN PHASING TMP-4 TEMPORARY TRAFFIC CONTROL PHASE I TMP-5 TEMPORARY TRAFFIC CONTROL PHASE II APPROVED: PRELIMINARY DEANS III® NOT USE FOR CONSTRUCTION U W O PROJ. REFERENCE NO. I SHEET NO. 17BP.14.R.1 761 TMP-2 ROAD WAY STANDARD DRAWINGS THE FOLLOWING ROADWAY STANDARDS AS SHOWN IN "ROADWAY STANDARD DRAWINGS" - PROJECT SERVICES UNIT - N.C. DEPARTMENT OF TRANSPORTATION - RALEIGH, N.C., DATED JANUARY 2018 ARE APPLICABLE TO THIS PROJECT AND BY REFERENCE HEREBY ARE CONSIDERED A PART OF THESE PLANS: STD. NO. TITLE 1101.01 WORK ZONE ADVANCE WARNING SIGNS 1101.02 TEMPORARY LANE CLOSURES 1101.03 TEMPORARY ROAD CLOSURES 1101.04 TEMPORARY SHOULDER CLOSURES 1101.11 TRAFFIC CONTROL DESIGN TABLES 1110.01 STATIONARY WORK ZONE SIGNS 1110.02 PORTABLE WORK ZONE SIGNS 1130.01 DRUM 1135.01 CONES 1145.01 BARRICADES 1150.01 FLAGGING DEVICES 1170.01 POSITIVE PROTECTION 1180.01 SKINNY -DRUM 1205.01 PAVEMENT MARKINGS - LINE TYPES AND OFFSETS 1205.02 PAVEMENT MARKINGS - TWO-LANE AND MULTI -LANE ROADWAYS 1205.04 PAVEMENT MARKINGS - INTERSECTIONS 1250.01 RAISED PAVEMENT MARKERS - INSTALLATION SPACING 1251.01 RAISED PAVEMENT MARKERS - PERMANENT AND TEMPORARY GENERAL DIRECTION OF TRAFFIC FLOW DIRECTION OF PEDESTRIAN TRAFFIC FLOW ---------- EXIST. PVMT . NORTH ARROW PROPOSED PVMT. WORK AREA TEMPORARY PAVEMENT MARKING PAINT (4" PA WHITE SOLID EDGE LINE LEGEND TRAFFIC CONTROL DEVICES BARRICADE (TYPE III) - CONE DRUM SKINNY DRUM �r TEMPORARY CRASH CUSHION \ � FLASHING ARROW BOARD FLAGGER LAW ENFORCEMENT TRUCK MOUNTED ATTENUATOR (TMA) CHANGEABLE MESSAGE SIGN TEMPORARY SIGNING PORTABLE SIGN STATIONARY SIGN rJ STATIONARY OR PORTABLE SIGN APPROVED: DATE: PRELIMINARY PLANS DO NOT USE FOR CONSTRUCTION TRANSPORTATION MANAGEMENT PLAN ROADWAY STANDARD DRAWINGS & LEGEND GENERAL NOTES PROJ. REFERENCE NO. SHEET NO. 17BP.14.R.176 I TMP-3 CHANGES MAY BE REQUIRED WHEN PHYSICAL DIMENSIONS IN THE DETAIL WHEN PERSONNEL AND/OR EQUIPMENT ARE WORKING ON THE SHOULDER P HAS I N G NOTES DRAWINGS, STANDARD DETAILS, AND ROADWAY DETAILS ARE NOT ATTAINABLE ADJACENT TO A DIVIDED FACILITY AND WITHIN 10 FT OF AN OPEN TO MEET FIELD CONDITIONS OR RESULT IN DUPLICATE OR UNDESIRED TRAVEL LANE, CLOSE THE NEAREST OPEN TRAVEL LANE USING ROADWAY OVERLAPPING OF DEVICES. MODIFICATION MAY INCLUDE: MOVING, STANDARD DRAWING NO. 1101.02 UNLESS THE WORK AREA IS PROTECTED BY PHASE I SUPPLEMENTING, COVERING, OR REMOVAL OF DEVICES AS DIRECTED BY THE BARRIER OR GUARDRAIL. ENGINEER. STEP 1: INSTALL WORK ZONE ADVANCE WARNING SIGNS ON ALL ROADS ACCORDING THE FOLLOWING GENERAL NOTES APPLY AT ALL TIMES FOR THE DURATION OF F) WHEN PERSONNEL AND/OR EQUIPMENT ARE WORKING WITHIN A LANE OF TRAVEL TO ROADWAY STANDARD DRAWING NO. 1101.01 WHERE WORK WILL BE THE CONSTRUCTION PROJECT EXCEPT WHEN OTHERWISE NOTED IN THE PLAN OF AN UNDIVIDED OR DIVIDED FACILITY, CLOSE THE LANE ACCORDING TO OCCURRING NO MORE THAN THREE DAYS PRIOR TO BEGINNING CONSTRUCTION. OR DIRECTED BY THE ENGINEER. THE TRAFFIC CONTROL PLANS, ROADWAY STANDARD DRAWINGS, OR AS DIRECTED BY THE ENGINEER. CONDUCT THE WORK SO THAT ALL PERSONNEL AND/OR STEP 2: USING ROADWAY STANDARD DRAWING NO. 1101.02, SHEET 14 OF 155 TIME RESTRICTIONS EQUIPMENT REMAIN WITHIN THE CLOSED TRAVEL LANE. AS NEEDED, SHIFT TRAFFIC AND INSTALL CONCRETE BARRIER. CONSTRUCT IMPROVEMENTS UP T0, BUT NOT INCLUDING, THE FINAL LAYER OF SURFACECOURSE, A) DO NOT CLOSE OR NARROW TRAVEL LANES AS FOLLOWS: G) DO NOT WORK SIMULTANEOUSLY WITHIN 15 FT ON BOTH SIDES OF AN OPEN AS SHOWN ON SHEET TMP-4. TRAVELWAY, RAMP, OR LOOP WITHIN THE SAME LOCATION UNLESS PROTECTED ROAD NAME DAY AND TIME RESTRICTIONS WITH GUARDRAIL OR BARRIER. NOTE: AUTOMATED FLAGGING OPERATIONS AND DEVICES WILL NEED TO BE ACTIVE US 19 MONDAY THRU FRIDAY 6:00 TO 9:00 AM FOR 24 HOURS FOR THE DURATION OF CONSTRUCTION. CONTRACTOR IS AND 4:00 TO 8:00 PM PAVEMENT EDGE DROP OFF REQUIREMENTS RESPONSIBLE FOR DESIGN, MAINTENANCE, AND OPERATION OF ALL EQUIPMENT. B) DO NOT CLOSE OR NARROW TRAVEL LANES DURING HOLIDAYS AND SPECIAL H) BACKFILL AT A 6:1 SLOPE UP TO THE EDGE AND ELEVATION OF EXISTING PHASE II EVENTS AS FOLLOWS: PAVEMENT IN AREAS ADJACENT TO AN OPENED TRAVEL LANE THAT HAS AN ROAD NAME EDGE OF PAVEMENT DROP-OFF AS FOLLOWS: STEP 1: USING ROADWAY STANDARD DRAWING NO. 1101.02, SHEET 14 OF 15, AS NEEDED, SHIFT TRAFFIC AND INSTALL CONCRETE BARRIER. CONSTRUCT US 19 BACKFILL DROP-OFFS THAT EXCEED 2 INCHES ON ROADWAYS WITH IMPROVEMENTS AS SHOWN ON SHEET TMP-5. INSTALL FINAL LAYER OF POSTED SPEED LIMITS OF 45 MPH OR GREATER. SURFACE COURSE AND FINAL PAVEMENT MARKINGS AND SHIFT TRAFFIC TO HOLIDAY THE FINAL TRAFFIC PATTERN. SEE FINAL PAVEMENT MARKINGS PLANS FOR 1. FOR ANY UNEXPECTED OCCURRENCE THAT CREATES UNUSUALLY HIGH TRAFFIC BACKFILL DROP-OFFS THAT EXCEED 3 INCHES ON ROADWAYS WITH MORE INFORMATION REGARDING LOCATION OF PAVEMENT MARKINGS. VOLUMES, AS DIRECTED BY THE ENGINEER. POSTED SPEED LIMITS LESS THAN 45 MPH. STEP 2: REMOVE LANE CLOSURE DEVICES AND SIGNS AFTER CONSTRUCTION 2. FOR NEW YEAR'S, BETWEEN THE HOURS OF 6:00 A.M. DECEMBER 31st BACKFILL WITH SUITABLE COMPACTED MATERIAL, AS APPROVED BY THE IS COMPLETE. TO 8:00 P.M. JANUARY 2ND. IF NEW YEAR'S DAY IS ON A FRIDAY, ENGINEER, AT NO EXPENSE TO THE DEPARTMENT. SATURDAY, SUNDAY, OR MONDAY THEN UNTIL 8:00 P.M. THE FOLLOWING TUESDAY. I) DO NOT EXCEED A DIFFERENCE OF 2 INCHES IN ELEVATION BETWEEN OPEN LANES OF TRAFFIC FOR NOMINAL LIFTS OF 1.5 INCHES. INSTALL ADVANCE WARNING 3. FOR EASTER, BETWEEN THE HOURS OF 6:00 A.M. THURSDAY AND "UNEVEN LANES" SIGNS (W8-11) 500 FT IN ADVANCE AND A MINIMUM 8:00 P.M. MONDAY. OF EVERY HALF MILE THROUGHOUT THE UNEVEN AREA. 4. FOR MEMORIAL DAY, BETWEEN THE HOURS OF 6:00 A.M. FRIDAY TO TRAFFIC PATTERN ALTERATIONS 8:00 P.M. TUESDAY. J) NOTIFY THE ENGINEER TWENTY ONE (21) CALENDAR DAYS PRIOR TO ANY 5. FOR INDEPENDENCE DAY, BETWEEN THE HOURS OF 6:00 A.M. THE TRAFFIC PATTERN ALTERATION. DAY BEFORE INDEPENDENCE DAY AND 8:00 P.M. THE DAY AFTER INDEPENDENCE DAY. SIGNING IF INDEPENDENCE DAY IS ON A FRIDAY, SATURDAY, SUNDAY OR MONDAY K) INSTALL ADVANCE WORK ZONE WARNING SIGNS WHEN WORK IS WITHIN THEN BETWEEN THE HOURS OF 6:00 A.M. THE THURSDAY BEFORE 40 FT FROM THE EDGE OF TRAVEL LANE AND NO MORE THAN THREE INDEPENDENCE DAY AND 8:00 P.M. THE TUESDAY AFTER (3) DAYS PRIOR TO THE BEGINNING OF CONSTRUCTION. INDEPENDENCE DAY. L) PROVIDE SIGNING AND DEVICES REQUIRED TO CLOSE THE ROAD ACCORDING 6. FOR LABOR DAY, BETWEEN THE HOURS OF 6:00 A.M. FRIDAY AND TO THE ROADWAY STANDARD DRAWINGS AND TRAFFIC CONTROL PLANS. 8:00 P.M. TUESDAY. PROVIDE SIGNING REQUIRED FOR THE OFF -SITE DETOUR ROUTE AS SHOWN 7. FOR THANKSGIVING DAY, BETWEEN THE HOURS OF 6:00 A.M. TUESDAY TO IN THE TRAFFIC CONTROL PLANS. 8:00 P.M. MONDAY. M) ENSURE ALL NECESSARY SIGNING IS IN PLACE PRIOR TO ALTERING ANY 8. FOR CHRISTMAS, BETWEEN THE HOURS OF 6:00 A.M. THE FRIDAY TRAFFIC PATTERN. BEFORE THE WEEK OF CHRISTMAS DAY AND 8:00 P.M. THE FOLLOWING TUESDAY AFTER THE WEEK OF CHRISTMAS. LANE AND SHOULDER CLOSURE REQUIREMENTS C) REMOVE LANE CLOSURE DEVICES FROM THE LANE WHEN WORK IS NOT BEING PERFORMED BEHIND THE LANE CLOSURE OR WHEN A LANE CLOSURE IS NO LONGER NEEDED OR AS DIRECTED BY THE ENGINEER. D) WHEN PERSONNEL AND/OR EQUIPMENT ARE WORKING WITHIN 15 FT OF AN OPEN TRAVEL LANE, CLOSE THE NEAREST OPEN SHOULDER USING ROADWAY STANDARD DRAWING NO. 1101.04 UNLESS THE WORK AREA IS PROTECTED BY BARRIER OR GUARDRAIL OR A LANE CLOSURE IS INSTALLED. E) WHEN PERSONNEL AND/OR EQUIPMENT ARE WORKING ON THE SHOULDER ADJACENT TO AN UNDIVIDED FACILITY AND WITHIN 5 FT OF AN OPEN TRAVEL LANE, CLOSE THE NEAREST OPEN TRAVEL LANE USING ROADWAY STANDARD DRAWING NO. 1101.02 UNLESS THE WORK AREA IS PROTECTED BY BARRIER OR GUARDRAIL. APPROVED: DATE: PRELIMINARY PLANS DO NOT USE FOR CONSTRUCTION TRANSPORTATION MANAGEMENT PLAN GENERAL WRITTEN NOTES AND PHASING PROJ. REFERENCE NO. SHEET NO. 17BP.14.R.176 TMP-4 _j 0 USE NCDOT RSD 1101.02 SHEET 14 OF 15 FOR SIGNS AND DETAILS FOR AUTOMATED FLAGGING OPERATION NOTE: AUTOMATED FLAGGING OPERATIONS AND DEVICES WILL NEED TO BE ACTIVE FOR 24 HOURS FOR THE DURATION OF CONSTRUCTION. CONTRACTOR IS RESPONSIBLE FOR DESIGN, MAINTENANCE, AND OPERATION OF ALL EQUIPMENT. LOCATION/ EST. AVERAGE MAX SHORING SHORING FROM STATION TO STATION OFFSET RANGE SHORING HEIGHT TYPE HEIGHT ROADWAY/ 11 + 62 11 + 78 6.8' LEFT OF -L- TO 4.75' 7.5' BRIDGE 10.5' LEFT OF -L- ROADWAY/ BRIDGE 12 + 00 12 + 25 16.8' LEFT OF -L- 5.15' 6.5' S p, , / rol) QUANTITY = 71.25 SQ FT \ TEMPORARY SHORING \ • \ FROM STA. 11+625 6.8' LT ± • \ TO STA. 1 1 +78 , 10.5' LT ± • (SEE SHEET TMP- � \' TEMPORARY SHORING BEGIN CONSTRUCTION -L- STA. 9+00 ± 11' MIN. 2'1'3' 15' SECTION A - A FOR NOTES) BEGIN PORTABLE CONCRETE BARRIER/ I CRASH CUSHION -L- STA. 11+27 ± I J 4$0 W$01-- n , END PORTABLE CONCRETE BARRIER/ CRASH CUSHION -L- STA. 13+55 ± END -L- CONSTRUCTION STA. 13+94 ± 021 QUANTITY = 79.63 SQ FT TEMPORARY SHORING FROM STA. 12+005 16.8' LT ± TO STA. 12+255 16.8' LT ± I (SEE SHEET TMP- FOR TEMPORARY SHORING NOTES) e�9NFT \ Tic 45r Roq • �S .............. USE NCDOT RSD 1101.02 Y SHEET 14 OF 15 FOR SIGNS AND DETAILS FOR AUTOMATED / FLAGGING OPERATIONS i FRIEUKDMIRW FLAN0 DO mou UZE FOR COOHSURMOUDOOH APPROVED: DATE: TRANSPORTATION MANAGEMENT PLAN TEMPORARY TRAFFIC CONTROL PHASE I PROJ. REFERENCE NO. SHEET NO. 17BP.14.R.176 TMP-5 USE NCDOT RSD 1101.02 SHEET 14 OF 15 FOR SIGNS AND DETAILS FOR AUTOMATED FLAGGING OPERATIONS R \ Y \ r00, BEGIN C -L- STD SECTION A n NOTE: AUTOMATED FLAGGING OPERATIONS AND DEVICES WILL NEED TO BE ACTIVE FOR 24 HOURS FOR THE DURATION OF CONSTRUCTION. CONTRACTOR IS RESPONSIBLE FOR DESIGN, MAINTENANCE, AND OPERATION OF ALL EQUIPMENT. R11-2 48" X 30" SO, USE NCDOT RSD 1101.02 � SHEET 14 OF 15 FOR SIGNS AND DETAILS FOR AUTOMATED FLAGGING OPERATIONS i FRIEUKDMARW FLAN0 DO mou UZE FOR COOHSURMOUDOOH APPROVED: DATE: TRANSPORTATION MANAGEMENT PLAN TEMPORARY TRAFFIC CONTROL PHASE II STATE OF NORTH CAROLINA TIP NO. SHEET NO. 17BP . 14 . R . 176 PMP -1 APPROVED: SHEET NO. INDEX DESCRIPTION DEPARTMENT OF TRANSPORTATION PAVEMENT MARKING HAYWOOD COUNTY PMP-1 PAVEMENT MARKING PLAN TITLE PMP-2 PAVEMENT MARKING PLAN ROADWAY STANDARD DRAWING THE FOLLOWING ROADWAY STANDARDS AS APPEAR IN "ROADWAY STANDARD DRAWINGS" - PROJECT SERVICES UNIT - N.C. DEPARTMENT OF TRANSPORTATION - RALEIGH, N.C., DATED JANUARY 2018 ARE APPLICABLE TO THIS PROJECT AND BY REFERENCE HEREBY ARE CONSIDERED A PART OF THESE PLANS: STD. NO. TITLE 1205.01 PAVEMENT MARKINGS - LINE TYPES AND OFFSETS 1205.02 PAVEMENT MARKINGS - TWO-LANE AND MULTILANE ROADWAYS 1205.04 PAVEMENT MARKINGS - INTERSECTIONS 1205.12 PAVEMENT MARKINGS - BRIDGES 1261.01 GUARDRAIL AND BARRIER DELINEATORS - INSTALLATION SPACING 1261.02 GUARDRAIL AND BARRIER DELINEATORS - TYPES AND MOUNTING 1262.01 GUARDRAIL END DELINEATION 1264.01 OBJECT MARKERS - TYPES 1264.02 OBJECT MARKERS - INSTALLATION PLAN SUBMITTED TO: NCDOT OSHUA DEYTON, PE DIVISION 14 BRIDGE PROGRAM MANAGER PLAN PLAN PREPARED BY: WSP RICHARD ODYNSKI, PE SR. TRAFFIC ENGINEER DERRICK DOHM TRAFFIC ENGINEER DATE: SEAL INCOMPLETE PLANS DO NOT USE FOR R/W ACQUISITION DOCUMENT NOT CONSIDERED FINAL I UNLESS ALL SIGNATURES COMPLETED PAVEMENT MARKING SCHEDULE CVMRnl MARKING TYPE LINEAR DISTANCE PAY ITEM P8 PAINT 2 FT - 6 FT/SP WHITE MINISKIP (4") 53 LF 27 LF PA PAINT WHITE EDGELINE (4") 935 LF 1870 LF PI PAINT YELLOW DOUBLE CENTER (4") 494 LF 1976 LF BEGIN TIF PROJECT 17BF.1,4.R.176 T) 01, L c9 m �9 CV 0 0 CD m N o� 0 0rr-, oocn N = _ ,z T ��z —L — STA. /-� -�94.00 TIE TO EXISTING MARKINGS ip 0 10 0 20 40 V W O C U W co N 0 L C 0 U �M o 00 OJL\oCD N CD L �U j m co M co co See Sheet I -A For Index of Sheets (Not Included) See Sheet I-B For Symbology Sheet ) o� 43 o� PROJECT LOCATION 4 a �A_ Mb✓O weWnoW VICINITY MAP GRAPHIC SCALE 0 20 PLANS 0 50 PROFILE (HORIZONTAL) o to PROFILE (VERTICAL) Li 100 El 011 it MISS LOCATION: REPLACEMENT OF BRIDGE No. 276 OVER B URNETTE CREED ON SR 1104 (BURNETTE COVE RD) TYPE OF WORK: GRADING, DRAINAGE, WIDENING, CORED BRIDGE AND PAVEMENT MARKINGS /S C °�K d END CONST ✓`� -DR1- ST BEGIN TIP PROJECT 17BP.14.R.176 -L- STA. 9+00.00 THESE EROSION AND SEDIMENT CONTROL PLANS COMPLY WITH THE REGULATIONS SET FORTH BY THE NCG-010000 GENERAL CONSTRUCTION PERMIT EFFECTIVE AUGUST 1, 2016 AND ISSUED BY THE NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES DIVISION OF WATER RESOURCES. END BRIDGE 0 -L- STA. 12+21.17 TION . .1 20.00 D / STFjOS S F a p Prepored in the Office of: wSP USA 434 FAYETTEVILLE STREET SUITE 1500 IULEIGH NC 27601 TEL: 1.919.836.4040 FAX: 1.919.836.4099 LICENSE NO. F-0165 Designed bY' RANA STANSELL, PE 3597 NAME LEVEL III CERTIFICATION NO. / 0 BURNETTE CREEK ✓s 0 _ r e� BEGIN BRIDGE -L- STA. 11 +76.17 1 1 1 1 1 1 NkS q �c c 0 SLAB END CONSTRUCTION =�D R2- STA. 10I+23.00 \ EN6CbNSTRUCTION B� -D R3- Sfi 10+25.00 o"` V 0 0`� 1160� o �� F \ -1 46 4b Reylewed to the Office of. - ROADSIDE ENVIRONMENTAL UNIT 1 South Wilmington St. Raleigh, NC 27611 2018 STANDARD SPECIFICATIONS Reyiewed byr �TAT6 OATS P'Ra1B%T RBPMt$N( `Na SHE' NQ TOTAL �HEET� NbOb 17BPVX17 E( ""a P aLINO. R k Wt"'Na D*61U ION ON AND SEDIMENT MyVNTRQL MEA$UkB$ D&Wnab,h y6ihporAry Silt ]Nt6h-------------------- ll-Otnpor4ry Did-Oroiioft -------------------------- T-6rtipor&ry Silt F6no ______----__ $poOal Control F�no------- T�inportry 11�rzfis thJ Slop-o Drtin$----------------- s- + Sil�jD jj�� ) t 1140, h ll yp-6 A ------------------------------ T-onipor:ry Ro& Silt Ch-64 Typo -A T�rhporAry R-o4 Silt 0hok Type -A with Mtwng 4tn4 Polyaoryloni+o (PAM)------------------ T�inporairy Ro6k Silt 044 Tyo-B WAId6/ Coir Fib6r Whtt]6-------------------------------- - Wattlo/ Ooir Fib6r Wittl� with ]l olya,6ry➢arei4(PA T�znpora.ry ]book Wirh-ont Darn Type-A'----------- T&hporary Rork Wirw6hf Dazh Type-11 ---- R-o�k Pio InW &4izn�nt Trap Type -A --------- ---� Rjo4 Pip Inks Wintof Trap TywR----- 0; $(il➢iq Lin-----------------------------------------------� pGi�l �illi�g ------------------------------ l-ook Ink f $�Jirhw Trap. Typ A----------------------------------------------- A J3 13 �yp------------------------------------------------ B Typ� (----------------------------------------------- C Skintih-6r B&s'in Ti�ri6J -------------------------- -------� THIS PROJECT CONTAINS EROSION CONTROL PLANS FOR CLEARING AND GRUBBING PHASE OF CONSTRUCTION. END CONSTRUCTION -L- STA. 15+05.00 END TIP PROJECT 17BP.14.R.176 � -L- STA. 13+94.00 Roadway Standard Drawings The following roadway english standards as appear in "Roadway Standard Drawings"- Roadway Design Unit - N. C. Department of Transportation - Raleigh, N. C., dated January 2012 and the latest revison thereto are applicable to this project and by reference hereby are considered a part of these plans. 1604.01 Railroad Erosion Control Detail 1632.01 Rock Inlet Sediment Trap Type A 1605.01 Temporary Silt Fence 1632.02 Rock Inlet Sediment Trap Type B 1606.01 Special Sediment Control Fence 1632.03 Rock Inlet Sediment Trap Type C 1607.01 Gravel Construction Entrance 1633.01 Temporary Rock Silt Check Type A 1622.01 Temporary Berms and Slope Drains 1633.02 Temporary Rock Silt Check Type B 1630.01 Riser Basin 1634.01 Temporary Rock Sediment Dam Type A 1630.02 Silt Basin Type B 1634.02 Temporary Rock Sediment Dam Type B 1630.03 Temporary Silt Ditch 1635.01 Rock Pipe Inlet Sediment Trap Type A 1630.04 Stilling Basin 1635.02 Rock Pipe Inlet Sediment Trap Type B 1630.05 Temporary Diversion 1640.01 Coir Fiber Baffle 1630.06 Special Stilling Basin 1645.01 Temporary Stream Crossing 1631.01 Matting Installation I PROJECT I7BPJ4RJ76No. :�C �. RW SHEET NO. ROADWAY DESIGN HYDRAULICS TEMPORARY ROCK SILT CHECK TYPE ' A' WITH `""""° `""""' EXCELSIOR MATTING AND POLYACRYLAMIDE (PAM) EXCELSIOR NOTES MATTING FLOW INSTALL TEMPORARY ROCK SILT CHECK TYPE A IN B- ACCORDANCE WITH ROADWAY STANDARD DRAWING N0. 1633-01. SEDIMENT CONTROL STONE USE EXCELSIOR FOR MATTING MATERIAL AND ANCHOR MATTING SECTION AT TOP AND BOTTOM WITH CLASS B STONE. � A 4 n PRIOR TO POLYACRYLAMIDE (PAM) APPLICATION, OBTAIN ,c A SOIL SAMPLE FROM PROJECT LOCATION, AND FROM OFFSITE L � r t � � MATERIAL, AND ANALYZE FOR APPROPRIATE PAM FLOCCULANT D ,' , ,"1 TO BE APPLIED TO EACH ROCK SILT CHECK. Dq 00 00 0�-r 00�P 0 0 Fz''Do pa6_'q D C) 00 0 00 0 0 OD, INITIALLY APPLY 4 OUNCES OF POLYACRYLAMIDE (PAM) r7 ✓TO TOP OF MATTING SECTION AND AFTER EVERY RAINFALL t` 0 EVENT THAT EQUALS OR EXCEEDS 0.50 INCHES. c STRUCTURAL STONE -�'� B� PAM (a oz.� PLAN 00 00 INSET A See Inset A CLASS B STONE 2/3 CHANNEL i, MIN EXCELSIOR WIDTH —.-r—y MATTING y � _ � ... „ 1' MIN .c12 - - H - 2' MIN rIL=1 L=�F_II�iL=111�TI-R= EXCELSIOR MATTING SECTION B-B CLASS B STONE SECTION A —A NOT TO SCALE II9dVISdON OF HIGHWAYS NORTH CAROLINA SOIL STABILIZATION TIM.EFRAMES SITE DESCRIPTION STABILIZATION TIVE TIVEFRAVE EXCEPTIONS PERIMETER DIKES., SINALES, DITCHES AND SLOPES 7 DAYS NONE HIGH QUALITY WATER (HOW) ZONES 7 DAYS NONE SLOPES STEEPER THAN 3e1 7 DAYS IF SLOPES ARE 10' OR LESS IN LENGTH AND ARE NOT STEEPER THAN 2e1914 DAYS ARE ALLOWED, SLOPES 3o1OR FLATTER 14 DAYS 7 DAYS FOR SLOPES GREATER THAN 50'IN LENGTH. ALL OTHER AREAS WITH SLOPES FLATTER THAN 4.1 14 DAYS NONE, EXCEPT FOR PERIMETERS AND HOW ZONES, 'P6 � BEGI do1 17BF -L - ST A. 9 +00.00 �� x \\\A\ G ril TROUT STREAM BUFFER ZONE GRIFFIN9 E 9z 38 PG 8 99 cam\ BEGIN CONSTRUCT ION QRl Sta. II +20.00 , , ♦ ' G re � re ♦ z TB TB B B VAL IF aft' 14 i�-�► ��' - RVIOUS • DIKE PROJECT REFERENCE NO. SHEET NO. 17BP.R.14.176 Ec 41CONSr.4 RiW SHEET NO. ROADWAY DESIGN HYDRAULICS ENGINEER I ENGINEER S \29 \ l tG. l +40.93 BEGIN CONSTRUCT 8 3 19 to: 00.00 -DR2 -Sta. l0 + TO 29, UN 9'S �9� , ,' TES 9,� \\ 40P 2 . BEGIN CONT UCT ION \\ ♦ ' ' - 3-5to. l0 +0 4 - Of -DRI -Sta. 10 -Ff5.20 R3-SfG. /0+00.00 c V ,66.1 -L- POC Sto. Y +.48 \ � / -DRI - POT Sta. l0+ � C 6N S'96 . yTR ,1 I E� L- 5, INSTALL DRIVEWAY PIPE DURING CLEARING & GRUBBING PHASE CLEARING AND GRUBBING EROSION CONTROL FOR CONSTRUCTION SHEET 4 NOTE: PLACE TEMPORARY ROCK SILT CHECKS TYPE - A AT DRAINAGE OUTLETS. BRIDGE REMOVAL AND BRIDGE CONSTRUCTION SHALL BE PER REQUIREMENTS IN THE NCDOT BEST MANAGEMENT PRACTICES FOR CONSTRUCTION AND MAINTENANCE ACTIVITIES MANUAL O \ Q a F 6 V ' re �� � r F Te e END CONS" "RUCT ION \T -L - STA. l5 +05.00 , 11,111, CONTRACTOR SHALL INSTALL AN ONSITE CONCRETE WASHOUT STRUCTURE PER THE NCDOT DETAIL AND SPECIAL PROVISIONS. ACTUAL LOCATION OF THE STRUCTURE SHALL BE DETERMINED IN THE FIELD. CONCRETE WASHOUT STRUCTURE SHALL BE MAINTAINED BY THE CONTRACTOR. ALL CONCRETE TRUCKS SHALL USE THE CONCRETE WASHOUT STRUCTURE. NO WASHOUT OF CONCRETE TRUCKS SHALL BE ALLOWED EXCEPT IN THE CONCRETE WASHOUT STRUCTURE. DEWATER AREA BEHIND IMPERVIOUS DIKES INTO SPECIAL STILLING BASIN(S). 1� `C e04J � 0cv11v / Ir rrrv✓cC, i iicrr✓v.rr.ub L C J J L C I U o U r\ i r r i i v 9 C I H L \ / -L- STA. 9+00.00 DB RB 888 PG 877 � \ O BEGIN CONSTRUCTION -DRI-Sto. 11+20.00 PROJECT REFERENCE NO. SHEET NO. 17BP.R.14.176 EC-51CONSr4 RiW SHEET NO. ROADWAY DESIGN HYDRAULICS ENGINEER I ENGINEER =DRI = ta, 10+40.93 BEGIN CONSTRUCTION " DR2 to. /0 +00.00 -DR2 -Sto. 10 +23.00 Te s BADE TO DRAIN z e eTe (*S E NOTE) ♦ J Te O _TBTB-TB TB TB`TB _ ` ` ` E TB -TB- TB -TB _TB-7'B ` ` y - - - BEGIN CONSTRUCTION ` / / - oo 19A INSTALL MATTING FOR EROSION CONTROL IN THE PROPOSED DITCH LINE. STA 9 + 50 TO 11 + 00 —L— RT STA 11 + 30 TO 12 + 08 —L— RT STA 13 + 50 TO 15 + 03 —L— RT ►'�� W 00.00 IF KRUM an INS 2970.60' .' of z�l " I INSTALL CLASS B RIPRAP IN THE PROPOSED DITCH LINE. STA 12 + 75 TO 13 + 50 —L— LT cm a PDE'�`S HIV - • .c�; `�, 2 9,66 . \ rB O w. -L - POC to I2 +6/.48 = 0 .S -DRI - POT Sta. /0 +00.00 00 c Te TB re T 1 ♦\\ B � \ O 46 ® END TIP PROJECT 17BP.I4.R.176 eT T B \ -L- 2 ST A.13+94.00 �� CO ere ` ♦ � \ OJ \� \re �� ♦ere END COS TIO TB C, STA. /5 +05.00.,,, / S '� PLANTING DETAILS SEEDLING / LINER BAREROOT PLANTING DETAIL HEALING IN 1. Locate a healing —in site in a shady, well protected area. 2. Excavate a flat bottom trench 12 inches deeo and orovide drainage. 3. Backfill the trench with 2 inches well rotted sawdust. Place a 2 inch layer of well rotted sawdust at a sloping angle at one end of the trench. 4. Place a single layer of plants against the sloping end so that the root collar is at ground level. 5. Place a 2 inch layer of well rotte sawdust over the roots maintaining a sloping angle. _ 6. Repeat layers of plants and sawdust as necessary and water thoroughly. DIBBLE PLANTING METHOD USING THE KBC PLANTING BAR 1. Insert planting bar 2. Remove planting bar as shown and pull handle and place seedling at toward planter. correct depth. AN 4. Pull handle of bar 5. Push handle forward toward planter, firming firming soil at top. soil at bottom. PLANTING NOTES: PLANTING BAG During planting, seedlings shall be kept in a moist canvas bag or similar container to prevent the root systems from drying. KBC PLANTING BAR Planting bar shall have a blade with a triangular cross section, and shall be 12 inches long, 4 inches wide and 1 inch thick at center. ROOT PRUNING All seedlings shall be root pruned, if necessary, so that no roots extend more than 10 inches below the root collar. 3. Insert planting bar 2 inches toward planter from seedling. 6. Leave compaction hole open. Water thoroughly. OAW *ATM Wtwe n N<`NQ � O ' TOTAL OHMM NbOb 17BP.14.R.176 RF-1 �"ATB Mahl"a a, PRQ&wa ye*rr ON W-AMRAG-L-00019,6/18/2018,R:\Roadway\XSC\R.176_earthwork xsc volume summary .xls PROD. REFERENCE NO. SHEET NO. STATE OF NORTH CAROLINA 17BP.14.R.176 X-1A DIVISION OF HIGHWAYS NOTE: EMBANKMENT COLUMN DOES NOT INCLUDE BACKFILL FOR UNDERCUT CROSS-SECTION SUMMARY STATION -L- UNCL. EXC. (CY) UN. EMBT. (CY) 9+25.00 0 0 9+50.00 6 1 9+75.00 13 0 10+00.00 13 0 10+25.00 6 1 10+50.00 5 2 10+75.00 6 2 11 +00.00 6 2 11 +25.00 5 2 11 +50.00 13 2 11 +75.00 33 4 12+25.00 4 7 12+50.00 10 23 12+75.00 2 28 13+00.00 5 15 13+25.00 7 7 13+50.00 11 4 13+64.00 4 1 STATION -DR1- UNCL. EXC. (CY) UN. EMBT. (CY) 10+10.00 0 0 10+25.00 11 1 10+50.00 13 0 10+75.00 8 0 11 +00.00 8 0 11 +20.00 3 0 Approximate quantities only. Unclassified excavation, borrow excavation, fine grading, clearing and grubbing, and removal of existing pavement will be paid for at the lump sum price for "Grading". NONE No No l m 00 lalmorAl�olmommommommommommommoommoommom MOMMM loommommomilliavLI!ILolimmommommommobuoiTmEmbimmommommommommoommoommMENNEN mom 00 "mom m - N - No kmJ No - -mm == ffi�m OEM Ono N -g-a M -ii4 moo.,- l i mmii4imolo milwak'loglomm,Aw,mqmm,mkllr moommommommommommommoommommommommommommommoommommommommommommommommommommommomommommommommommommommoommoommommommommommom olinsiIE::=MVAMSZMIIIIIIIMMM00000MMMMMMMMMMNMMMMNE m moommommommillim.WL!ILIAEEEEEEEEEEEEEEEEommommommommommommommoommommommommommoommommommommo -- m �- -A=-- �- �' EEiRE�OMENNOW-ROMENLEMENNIAENommommommommommommommommommommommommo �-�======-=--.m-2i-� .0 w- mm�=E-FE64---M��-�om :A 11 IN " rAE'Dimp,Avqpjmmmmmmommoommommommommommommommommommommoommommommommommommommoommommommommommommommoommommommommommoommommomm ollffailmlloofmimribumAkIrAbloommoommommommoommommommommommommommoommommommommommommoommommommommommommommoommommommommommommommoommommommommommommommommommommommoommoommommom milivijs;;;iMdllilNMRVIJLINMMMMM0000000000000000000000ommoommommommommoommommommommoommommommommommommommoommommommommommommommoommommommommommommommommommommommoommoommommom omililmorAq�NIMEMENEENEENEENEENEENommommommommommoommommommommommoommommommommommommommoommommommommommommommommongEsessommommmmommommommommommoommoommomm.9p.mc linVE!3L§Iimmmmmmmmmmmmbuok-ommismommommommommommoommommoommommommoommoommommommommoommommommommommommommoommoommommumomsommaGREommoommommommommoommommommommoommoommoommommirlugiroP - le -mn-=;---!!9 - -0 = � mil .R oligmilmolOME'AL�EEMIIFIMNMMMMMMMMMMMMM0000000000000000000000ommomommommommommommommommommmommmoommmmommmoMENEEMENEEMENEEMENEEMEMENNEEMEMENEEMENmmommmoommmoommmomMENEENNEEN MIILVIANNINEF',MPqFBM,lFALIF,MMMMMMMMMMMMMMMMMMMMM0000000000000000000000mommoommommoommommommommommommommoommommommommommommommoommommommommommommommomommoommommoommommommommom 1.l tlt)immmmmmmmmmW,-900:mrlrl-mqommmmmmmmmmmmffillnewil�olloommommommommommommommommommommommommommommommommommommommommommoommommommesm2sommoommoommommommommommommommoommommommommommoommommommommommom lson'l�glANNOMEMEMENEEL:dMQMMhiMEMENEENEEMEMENEENEENmmoommommoEREEMENEEMENEEMENEEMENommommMEEMEMEREEMEMENE0000000000000000000000OMENEEMENEENommommommommommommommoommoommommom A !!! = E= ---- Wm-�-M�M == mommiti�D]VA-0�m[olx&,Emmmmmmmmmmmmmmmmommommommommommommommoommommommommommommommoommommommoommommommommommommommommommommommommom c OLE a 6 milisiirmi!Rmlllllmmmlllllmmommoommommommoommommommommommommommommommommommoommommommommommommommoommommommommommommommoommommommommommommommoom mmmmmlmm�mmmml NONE 00=01MEMENE No MEN MEN NONE 00=01MEM No MEN d E I �IllpA[Illoommommooffs'ErsiTipIrmi'loommommommommmmoloommommommommommomommommoommommoommommommommommommommoommommommommommommommoommommommommommommommoommomommommoommoommommommommomm mm - MCM 0 0 0 m ommoomm -alooloommoommommommoommommommommommommommoommoommommoom lip'Sh9,pApi ,il,,I ,Ak-lr,"Emmmmmmmmmmmmmmmommommommommommommommoommoommommommommommoommommom milopFlac:!=Ellillnmmlllilommmmmommommommommommommommoommommommommommommoommoommommoommommommommommommommoommommommommommommommoommommommommommommommomommoommommoommoommommon �IlEFAililmmmmmmmmmmmoffa'mrmiTipIrmi'loommoommommoommommommommommommommommommommommoommommommommommommommoommommommommommommommoommommommommommommommommommommommoommoommommommommom -B E---="-- WW-ic-_rt-gmrmm�MF�ElionoEENNUMMENEENEENEENEENEommoommommom ".409�olmiimmmmmmmmmmmmmmmmmommommommommommommommoommommommommommommommommom ommilowilooFiompipkwAllqpAmmommommommommommommommoommommommommommommommommommommommoommommommommommommommoommommommommommommommoommommommommommommommommommommommoommommommom No NONE No i- 0 0 am i M 0 moo 0 moo -� "O ... lotao I 111 I A M '1,151omip's leP pI lo,fikIria,mommomoommommommommoommommommommommommommommommommommommandoommommommommommommommoommommommommommoommommommommommooI I illimmom IF I III 1 m oommimmom m 00 mo 4 A molp.mi,Fj�VDIIMEEEEEEEEEEEEEEEEEommoommommommommoo wl w W. P� 0 , , o'll icom 0, lllqo-lmmmmmmmmmmmmommommommommommommommoommommommommommommommoommomommoommommommommommommommoommommommommo MMUMM i w M,A M ........ 0 mmommompo A ll,� I I'll 0,1011 1 NEW li M-pommoommoomp"mmmmmommommommommommommommoommommommommommommommoommommommoommommommommommomm iiii--.,NqFANNEOEEL:Iu mils.olmllONVilldriallE'AkIFA&'100000000000000000ommommommommommommommomommommommommommommommommommommommoommommommumememommommoommommommommommommommoommommommommommommommommooI ollobllic::=EmllllomavljilgmmmmmommommommommommommommoommoommommommoommommommommommoommommommommommommommoommommommommommommommoommommommommommommommommommommommoommommommoI Fill'slmoommommommooffe'ErallLpIrdi'loommommommommoommoommommommoommoommommommommommoommommommommommommommoommommommommommommommoommoommommommoommoommommommommommoommoommommommoI =- E � mffi a N VMENIIII milKwl'MosiomFlqr"mllq,ALIV�mommomm Filill�ommoommommommovilmra-lE-eirA",ImmmmmmmmmmmmmmmmmmmommommommommommommommommommommommommommommommommoommommommommommommommoommommommommommommommoommommommommommommommommommoI EMWiRLIlPFALIPANNEEMEMENEENNEENE0000000000000000000ommommommommommommommommommommommommommoommommommommommommommoommommommommommoommommommommommommommommooI ON mem��-�--M---.�--�=�--.,�----,--R � � , 'ALgIZA:MLgljk�AMENEEMENEEMENEENEENE moommommommommommommoommommommommommommommoommommommommomw , uMo miimr.-4rol!mmlllllmmmlllllmommommommommommommommoommommommommommommommoommommommommommommommommommommommoommommommommommommommoommommommommommommommoommommommommommoommommoI o m llor.maii . l m 6" m 0 l 0 Emmmmi MOMMOMM MEMMOM -moom moommo mmoom mommo I I I I I Pirdilloommommommommoommommommommommommommoommommommommommommommoommommommommoommommommommommommommoommommommommommommomm 01 womm a 9 l mom MENEMI -m=!-p m -EMEN qummm�m---�����- , a lmoomm mo ommommiloommommo . IN 00 0 MOm 0 INEENEEMEMEMENE mmoomisommommom is 44 0 mommoollo�lI 11 IN mommommossommossnommoommommossommoommosommoommommommommo I mm EEF.mi,Fj�VDIIMEEEEEEEEEEEEEEEEEommommommommommomm I I Aill AMER VA 11 JPFAI 11 loommommommommommommoommommommommommommommoommommosommoommommommoommoommommommommommommommommommommoommommommommommommommoommommommommommommommoomm 0 A i &-- I moommmommo - = --!M- i m m IM w solu'A,'Imrmmm,Aff�mmm,AkIl'Am�ommommommommommommommoommommommommommoommommommommommoommommommommommommommoommommommommommommommoommommommommomm milosiIE!!!!!IMVAIWa'gElllllMMMMM0000000000000000000000ommoommommommoommommommommommommommommommommommommoommommommommommommommoommommommommommommoommommommommommommoommommomm ,m�IIJPUIIIJEEEEEEEEEEEEEommommommommommomE.Monamommommommommommoommoommommommommommommommoommommommommommommommoommommommommommommommoomm . .m m a lmvmmllliammmmmmmmommommommommommommommommommommommommommommommoommoommoommmommmoommmmommmommmmmommmommommommmomEMENNEENommmmommmmoommmommmmomEMENEMEMENEENE milawlimmiNEMPALIWBU,IFALIW,MMMMMMMMMMMMMMMMMMMMMOmmommommommommommommommommoommommoommommommommommommommoommommommommommommommoommommommommommommommomommoommommoommoommommom ommoNELOIJILIPiEllsimum[lip�INAMENEEMENEEMENEEMENEommommommommoommommommommommommommommommommommommommommoommommommommommommommoommommommommoommommommommommommommommommommommop.9p.m m-m- M-!P Amams "Elllllommmmmmmmmmmmmommommommommommommommoommommommoommommommommommoommommommommommommommoommommommommommommommoommoommommommoommoommommommommommommommom -m-m rA 11+25 11+50 11+75 12+00 (-)2.5843% A(-)4.0000% PI = 11+42.00-L- 2990 EL. = 2974.52' VC = 30' 2970 2950 FIX W.P.#1 FILL FACE @ END BENT 1 STA. 11+74.87-L- G R A D E DATA GRADE PT. EL. 2973.21 /- EL. 2975± -7171T1�i 7I-------------------------------------- LOW CHORD EL. 2970.63 HP 12 X 53 STEEL PILES--"' (TYP.) RIP RAP CLASS Il (TYP.) SPAN A 1 ' - 6 " TO UNCLASSIFIED STRUCTURE EXCAVATION (TYP.) r'I 7n7z 4- END BENT 1 ft FIX 5'-0" EARTH BERM (TYP.) 0100 EL. 2972.4 NWS - o EL.2967.2 (08/23/16) rn ~ ' . 2964 ± EL. 2964 ± 4TE TO EL. 2967.9 GRADE TO DRAIN SECTION ALONG -L- 12+25 12+50 12+75 13+00 (-)4.0000/ A (-)7 4985% PI = 12+54.00-L- W.P.#2 EL. = 2970.04' FILL FACE @ END BENT 2 VC = 50' STA. 12+22.47-L- GRADE PT. EL. 2971.30 GRADE DATA --L. 2969 ± ---LOW CHORD----------------TiTmE I7L------------------------------EL.-2966+ EL. 2968.88 JWu- --�, APPROXIMATE EXCAVATE TO NATURAL GROUND EL. 2966.3 LINE GRADE TO DRAIN END BENT 2 (SECTION TAKEN AT RIGHT ANGLES TO END BENTS) (F ILL F ACE OD ENU BEN I 1 10 F ILL F ACE OD LNU BEN 1 2) UNCLASSIFIED STRUCTURE EXCAVATION HYDRAULIC DATA DESIGN DISCHARGE = 500 CFS FREQUENCY OF DESIGN FLOOD = 25 YEARS DESIGN HIGH WATER ELEVATION = 2971.3 DRAINAGE AREA = 1.4 SQ.MI. BASE DISCHARGE (0100) = 750 CFS BASE HIGH WATER ELEVATION = 2972.4 OVERTOPPING FLOOD DATA OVERTOPPING DISCHARGE = 2050 CFS FREQUENCY OF OVERTOPPING FLOOD = 500+ YEARS OVERTOPPING FLOOD ELEVATION = 2976.3 *OVERTOPPING WOULD OCCUR AT STA. 12+25 -L- HORIZONTAL CURVE DATA PI STA 12+74.77 -L- 0 = 32°-48'-28.2" (RT) D = 37°-12'-18.2" L = 88.18' T = 45.34' R = 154.00' PROJECT No. 17BPc14cRa176 HAYWOOD rnuNTY STATION: SHEET 1 OF 3 11+98a67—L- REPLACES BRIDGE No.2761 PLAN (FOR CLARITY, PILES ARE NOT SHOWN IN PLAN VIEW) 6/19/2018 J:\188360C - 2015 W Divisions Planning & Design On-Call\I188360C Group 3 Bridges\17BP.R176.430276\Structures\Drafting\DGN's\401-001-17BP.14.R.176-SMU-GDOI.dgn Z O H H U H N Z O U W 0 Q H N Z O h-I U ( H N Z O U h-I W 0 Q H N END BENT 1 END BENT 2 NOTES FOR PILES, SEE GEOTECHNICAL SPECIAL PROVISIONS AND SECTION 450 OF THE STANDARD SPECIFICATIONS. PILES AT END BENT 1 ARE DESIGNED FOR A FACTORED RESISTANCE OF 70 TONS PER PILE. STEEL H-PILE POINTS ARE REQUIRED FOR STEEL H-PILES AT END BENT 1. FOR STEEL PILE POINTS, SEE SECTION 450 OF THE STANDARD SPECIFICATIONS. DRIVE PILES AT END BENT 1 TO A REQUIRED DRIVING RESISTANCE OF 117 TONS PER PILE. FOUNDATION LAYOUT (END BENTS ARE PARALLEL) PILES AT END BENT 2 ARE DESIGNED FOR A FACTORED RESISTANCE OF 70 TONS PER PILE. DRIVE PILES AT END BENT 2 TO A REQUIRED DRIVING RESISTANCE OF 117 TONS PER PILE. STEEL H-PILE POINTS ARE REQUIRED FOR STEEL H-PILES AT END BENT 2. FOR STEEL PILE POINTS, SEE SECTION 450 OF THE STANDARD SPECIFICATIONS. PROJECT NO, 17BP.14.R.176 HAYWOOD STATION: SHEET 2 OF 3 COUNTY 11+98a67—L— 6/19/2018 J:\188360C - 2015 W Divisions Planning & Design On-Call\I188360C Group 3 Bridges\17BP.R176.430276\Structures\Drafting\DGN's\401-003-17BP.14.R.176-SMU-GD02.dgn BM 1*1: STA 10+10o77—L—, 82.96" RT, ELEV.z 2984008% RR SPIKE IN BASE OF 32" CHINESE CHESTNUT TREE NOTES •� a JS—... _✓S e ,s ,s �RNF r TE ✓s js .. Js R s ✓S\ WOODS EXISTING STRUCTURE #276 TO SR 1130 Ll\ STA. 10+40.93-DR1- STA. 10+00.00-DR2- ! BRIDGE STA.11+98.67 -L- r-TEMPORARY SHORING (TYP.) �s �s — 60 °-00'-00" ✓s (TYP.) �s L0CATION SKETCH FOR UTILITY INFORMATION, SEE UTILITY PLANS AND SPECIAL PROVISIONS. .'i -DR1- -DR2- -DR3- i STA. 10+35.20-DR1- STA. 10+00.00-DR3- 1 �POC STA. 12+61.48-L- ' POT STA. 10+00.00-DR1- T0 SR 1103 PROPOSED GUARDRAIL (TYP. AS SHOWN) (ROADWAY DETAIL & PAY ITEM) (TYP.) ASSUMED LIVE LOAD = HL-93 OR ALTERNATE LOADING. FOR OTHER DESIGN DATA AND GENERAL NOTES, SEE SHEET SN. FOR EROSION CONTROL MEASURES, SEE EROSION CONTROL PLANS. THIS BRIDGE HAS BEEN DESIGNED IN ACCORDANCE WITH THE AASHTO LRFD BRIDGE DESIGN SPECIFICATIONS. THE EXISTING STRUCTURE CONSISTING OF A SINGLE SPAN 25'-6",WITH A CLEAR ROADWAY WIDTH OF 19'-2"°TIMBER DECK WITH ASPHALT WEARING SURFACE ON STEEL I -BEAMS WITH TIMBER CAPS, TIMBER POSTS AND SILL END BENTS AND LOCATED AT PROPOSED STRUCTURE SHALL BE REMOVED. THE EXISTING BRIDGE IS PRESENTLY POSTED BELOW LOAD LIMIT. SHOULD THE STRUCTURAL INTEGRITY OF THE BRIDGE FURTHER DETERIORATE, THIS LOAD LIMITATION MAY BE REDUCED AS FOUND NECESSARY DURING THE LIFE OF THE PROJECT. REMOVAL OF THE EXISTING BRIDGE SHALL BE PERFORMED SO AS NOT TO ALLOW DEBRIS TO FALL INTO THE WATER. THE CONTRACTOR SHALL REMOVE THE BRIDGE AND SUBMIT PLANS FOR DEMOLITION IN ACCORDANCE WITH ARTICLE 402-2 OF THE STANDARD SPECIFICATIONS. INASMUCH AS THE PAINT SYSTEM ON THE EXISTING STRUCTURAL STEEL CONTAINS LEAD, THE CONTRACTOR'S ATTENTION IS DIRECTED TO ARTICLE 107-1 OF THE STANDARD SPECIFICATIONS. ANY COSTS RESULTING FROM COMPLIANCE WITH APPLICABLE STATE OR FEDERAL REGULATIONS PERTAINING TO HANDLING OF MATERIALS CONTAINING LEAD BASED PAINT SHALL BE INCLUDED IN THE BID PRICE FOR "REMOVAL OF EXISTING STRUCTURE". THE MATERIAL SHOWN IN THE CROSS -HATCHED AREA ON SHEET S-1 SHALL BE EXCAVATED FOR A DISTANCE OF 25 FT (LEFT) AND 25 FT. (RIGHT) OF CENTERLINE ROADWAY AS DIRECTED BY THE ENGINEER. THIS WORK WILL BE PAID FOR AT THE CONTRACT LUMP SUM PRICE FOR UNCLASSIFIED STRUCTURE EXCAVATION. SEE SECTION 412 OF THE STANDARD SPECIFICATIONS. THE SUBSTRUCTURE OF THE EXISTING BRIDGE INDICATED ON THE PLANS IS FROM THE BEST INFORMATION AVAILABLE. SINCE THIS INFORMATION IS SHOWN FOR THE CONVENIENCE OF THE CONTRACTOR, THE CONTRACTOR SHALL HAVE NO CLAIM WHATSOEVER AGAINST THE DEPARTMENT OF TRANSPORTATION FOR ANY DELAYS OR ADDITIONAL COST INCURRED BASED ON DIFFERENCES BETWEEN THE EXISTING BRIDGE SUBSTRUCTURE SHOWN ON THE PLANS AND THE ACTUAL CONDITIONS AT THE PROJECT SITE. THIS STRUCTURE HAS BEEN DESIGNED IN ACCORDANCE WITH "HEC 18 - EVALUATING SCOUR AT BRIDGES". ASPHALT WEARING SURFACE IS INCLUDED IN THE ROADWAY QUANTITY ON ROADWAY PLANS. FOR SUBMITTAL OF WORKING DRAWINGS, SEE SPECIAL PROVISIONS. FOR FALSEWORK AND FORMWORK, SEE SPECIAL PROVISIONS. FOR CRANE SAFETY, SEE SPECIAL PROVISIONS. FOR GROUT FOR STRUCTURES, SEE SPECIAL PROVISIONS. THIS BRIDGE IS LOCATED IN SEISMIC ZONE 1. FOR ASBESTOS ASSESSMENT FOR BRIDGE DEMOLITION AND RENOVATION ACTIVITIES, SEE SPECIAL PROVISIONS. TEMPORARY SHORING WILL BE REQUIRED IN THE AREA INDICATED IN THE PLAN VIEW. FOR LIMITS OF TEMPORARY SHORING FOR MAINTENANCE OF TRAFFIC, SEE TRAFFIC CONTROL PLANS. FOR PAY ITEM FOR TEMPORARY SHORING FOR MAINTENANCE OF TRAFFIC, SEE ROADWAY PLANS. TOTAL BILL OF MATERIAL REMOVAL OF EXISTING STRUCTURE (q� STA.11+98.67 -L- UNCLASSIFIED STRUCTURE EXCAVATION CLASS A CONCRETE BRIDGE APPROACH SLABS REINFORCING STEEL PILE DRIVING EQUIPMENT SETUP FOR HP 12 x 53 STEEL PILES HP 12 X 53 STEEL PILES STEEL PILE POINTS VERTICAL CONCRETE BARRIER RAIL RIP RAP CLASS B RIP RAP CLASS II (2'-O" THICK) RIP RAP CLASS II (3'-O" THICK) GEOTEXTILE FOR DRAINAGE ELASTOMERIC BEARINGS 3'-0"X 1'-9" PRESTRESSED CONCRETE CORED SLABS ASBESTOS ASSESSMENT LUMP SUM LUMP SUM CU. YDS. LUMP SUM LBS. No. No. LIN. FT. EACH LIN. FT. TONS TONS TONS SO. YDS. LUMP SUM No. LIN. FT. LUMP SUM SUPERSTRUCTURE LUMP SUM 90.00 LUMP SUM 9 405.00 END BENT 1 LUMP SUM 21.0 2651 5 5 125 5 11 18 29 53 END BENT 2 LUMP SUM 20.9 2543 5 5 175 5 - 16 29 39 TOTAL LUMP SUM LUMP SUM 1 41.9 ILUMP SUMI 5194 1 10 1 10 1 300 1 10 1 90.00 1 11 1 34 1 58 1 92 1 LUMP SUM 1 9 1 405.00 1 LUMP SUM DESIGNED BY: S. NATARAJAN DATE : APR 2017 DRAWN BY: M. HOBBS DATE : APR 2017 CHECKED BY: N. PIERCE DATE : APR 2017 DESIGN ENGINEER OF RECORD: - DATE : - WSP USA Inc. 434 FAYETTEVILLE STREET SUITE 1500 RALEIGH, NC 27601 TEL: 1.919.836.4040 LICENSE NO. F-0165 DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED PRELO t UMARY PLANS DO NOT USE F O R 60O MS4RM64DOO M PROJECT No. 17BPn14nRa176 HAYWOOD rnuNTY STATION: SHEET 3 OF 3 11+98a67—L— STATE OF NORTH CAROLINA DEPARTMENT OF TRANSPORTATION RALEIGH GENERAL DRAWING FOR BRIDGE ON SR 1104 (BURNETTE COVE RD) OVER BURNETTE CREEK BETWEEN SR 1103 AND SR 1130 REVISIONS SHEET NO. 40. BY: DATE: NO. BY: DATE: S — 3 ,j TOTAL UU SHEETS 141 1 11 22 6/19/2018 J:\188360C - 2015 W Divisions Planning & Design On-Call\I188360C Group 3 Bridges\17BP.R176.430276\Structures\Drafting\DGN's\401-005-17BP.14.R.176-SMU-GD03.dgn LOAD FACTORS: LOAD AND RESISTANCE FACTOR RATING (LRFD) SUMMARY FOR PRESTRESSED CONCRETE GIRDERS STRENGTH I LIMIT STATE SERVICE III LIMIT STATE MOMENT SHEAR MOMENT o 0 o V) CC O L_ Ir Z CC O H H :2CC Q Z O H Q Z CC O H Q W m c� o Z Z U X o^ H U a U Of LL_ LL_ p Q -- H U a U Of LL W Q p .-. H D U a U CC W L.L. O M H H Q H .� Q Q H .. Q Q Q Q Z W v J H J Q L 3: Q Q (n m to L.L. J W p+ U Z ,} m N Li- J W p} U Z �} Q Q to co (n Li- J _ W Q} U Z �} H J 0 QC � p =Z ii 0 QC " 0-1 CD CC Z W H CC CD Of Z LU 0 CC " QI CD Z W Z W J U H =CD N CC Q H H (n JO Ld H CCO H H Z H Z W Q Q H H Z CCO H H Z i--i Z W Q Q H H Z JO W H Of0 H H Z H Z W Q Q IZ - H :2W H Z Z Q Z H LL z > U (n U H Q CC cn LL_ Q cn U H Q 0C cn L_ Q > U cn U H Q CC cn L_ Q = W W Ld 0 00 H Q O H Q H Q Q CL H H W CL H Q Q CL H H W CL H Q H Q Q a_ H H W CL O J > U J fr J L._ Q L._ Of 0 U Q J 0 Q LL CC to U Q J to J L.L. Q L.L. CC to U Q J to U HL-93(Inv) N/A 1 1.179 -- 1.75 0.251 1.48 45' EL 21.923 0.654 1.18 45' EL 8.769 0.80 0.251 1.20 45' EL 21.923 HL-93(Opr) N/A -- 1.529 -- 1.35 0.251 1.92 45' EL 21.923 0.654 1.53 45' EL 8.769 N/A -- -- -- -- -- DESIGN LOAD HS-20(Inv) 36.000 2 1.36 48.973 1.75 0.251 1.82 45' EL 21.923 0.654 1.36 45' EL 8.769 0.80 0.251 1.47 45' EL 21.923 RATING HS-20(Opr) 36.000 -- 1.763 63.484 1.35 0.251 2.36 45' EL 21.923 0.654 1.76 45' EL 8.769 N/A -- -- -- -- -- SNSH 13.500 -- 2.873 38.783 1.4 0.251 4.44 45' EL 21.923 0.654 3.59 45' EL 8.769 0.80 0.251 2.87 45' EL 21.923 SNGARBS2 20.000 -- 2.321 46.427 1.4 0.251 3.59 45' EL 21.923 0.654 2.69 45' EL 8.769 0.80 0.251 2.32 45' EL 21.923 SNAGRIS2 22.000 -- 2.277 50.09 1.4 0.251 3.48 45' EL 17.538 0.654 2.55 45' EL 8.769 0.80 0.251 2.28 45' EL 21.923 SNCOTTS3 27.250 -- 1.434 39.088 1.4 0.251 2.22 45' EL 21.923 0.654 1.81 45' EL 8.769 0.80 0.251 1.43 45' EL 21.923 V' SNAGGRS4 34.925 -- 1.266 44.231 1.4 0.251 1.96 45' EL 21.923 0.654 1.6 45' EL 8.769 0.80 0.251 1.27 45' EL 21.923 SNSSA 35.550 -- 1.234 43.856 1.4 0.251 1.91 45' EL 21.923 0.654 1.67 45' EL 8.769 0.80 0.251 1.23 45' EL 21.923 SNS6A 39.950 -- 1.162 46.437 1.4 0.251 1.8 45' EL 21.923 0.654 1.57 45' EL 8.769 0.80 0.251 1.16 45' EL 21.923 SNS7B 42.000 3 1.108 46.54 1.4 0.251 1.71 45' EL 21.923 0.654 1.61 45' EL 8.769 0.80 0.251 1.11 45' EL 21.923 LEGAL LOAD TNAGRIT3 33.000 -- 1.427 47.083 1.4 0.251 2.21 45' EL 21.923 0.654 1.83 45' EL 8.769 0.80 0.251 1.43 45' EL 21.923 RATING TNT4A 33.075 -- 1.442 47.687 1.4 0.251 2.23 45' EL 21.923 0.654 1.74 45' EL 8.769 0.80 0.251 1.44 45' EL 21.923 TNT6A 41.600 -- 1.21 50.352 1.4 0.251 1.87 45' EL 21.923 0.654 1.71 45' EL 8.769 0.80 0.251 1.21 45' EL 21.923 N TNT7A 42.000 -- 1.234 51.826 1.4 0.251 1.91 45' EL 21.923 0.654 1.59 45' EL 8.769 0.80 0.251 1.23 45' EL 21.923 TNT7B 42.000 -- 1.285 53.952 1.4 0.251 1.99 45' EL 21.923 0.654 1.52 45' EL 8.769 0.80 0.251 1.28 45' EL 21.923 TNAGRIT4 43.000 -- 1.224 52.616 1.4 0.251 1.89 45' EL 21.923 0.654 1.46 45' EL 8.769 0.80 0.251 1.22 45' EL 21.923 TNAGTSA 45.000 -- 1.138 51.23 1.4 0.251 1.76 45' EL 21.923 0.654 1.52 45' EL 8.769 0.80 0.251 1.14 45' EL 21.923 TNAGTSB 45.000 -- 1.111 1 50.015 1.4 0.251 1.72 45' EL 21.923 0.654 1.38 45' EL 8.769 0.80 0.251 1.11 45' EL 21.923 0 0 0 LRFR SUMMARY FOR SPAN 'A' DESIGN LOAD LIMIT STATE YDC YDW RATING STRENGTH I 1.25 1.50 FACTORS SERVICE III 1.00 1.00 NOTES: MINIMUM RATING FACTORS ARE BASED ON THE STRENGTH I AND SERVICE III LIMIT STATES. ALLOWABLE STRESSES FOR SERVICE III LIMIT STATE ARE AS REQUIRED FOR DESIGN. COMMENTS: 1. 2. 3. 4. 0 CONTROLLING LOAD RATING 0 DESIGN LOAD RATING (HL-93) DESIGN LOAD RATING (HS-20) LEGAL LOAD RATING SEE CHART FOR VEHICLE TYPE GIRDER LOCATION I - INTERIOR GIRDER EL - EXTERIOR LEFT GIRDER ER -EXTERIOR RIGHT GIRDER PROJECT No. 17BPc14cRc176 HAYWOOD rniiNTY STATION: 11+98a67 -L- 6/19/2018 J:\188360C - 2015 W Divisions Planning & Design On- Call\I188360C Group 3 Bridges\17BP.R176.430276\Structures\Drafting\DGN's\401-007-17BP.14.R.176-SMU-LRFR.dgn STD. NO. 21LRFR1_60&120S_45L NOTES STAGE I TRAFFIC (EXISTING STRUCTURE) -------------------------------------------------------------------------- ------------------------------------------------------------------------------- - VERTICAL CONCRETE BARRIER RAIL (TYP.) 1" I1'-0" 3'-0" (TYP.) 13'-6" 12'-5" ASPHALT WEARING SURFACE (SEE ROADWAY PLANS) 0.02 4 PRESTRESSED CONCRETE CORED SLAB UNITS = 12'-0" (STAGE II) -L- 2,-2" 13'-6" 11'-9" 1'-0" TEMPORARY GUARDRAIL ANCHORED TO DECK (ROADWAY PAY ITEM AND DETAILS) ASPHALT WEARING SURFACE (SEE ROADWAY PLANS) 0.02 1'-10" 3'-0" (TYP.) 5 PRESTRESSED CONCRETE CORED SLAB UNITS = 15'-O" (STAGE I) STAGE I -L- ---d 27'-O" (OUT TO OUT) 13'-6" 24'-10" (CLEAR ROADWAY) 12'-5" 1'-6" 1 1 1'-0" 1 1" 1 1 1 1 0.0 2 1 -----------------------L--- - - - - -- ' STAGE II STAGING SEQUENCE. VERTICAL CONCRETE BARRIER RAIL FOR TEMPORARY GUARDRAIL DETAILS AND PAY ITEMS, SEE ROADWAY PLANS. PROJECT NO. 17BPc14cRc176 HAYWOOD rniiNTY STATION: 11+98a67 —L- 6/19/2018 J:\188360C - 2015 W Divisions Planning & Design On- Call\I188360C Group 3 Bridges\17BP.R176.430276\Structures\Drafting\DGN's\401-009-17BP.14.R.176-SMU-STOl.dgn 1" CONST. JT. — (TYP.) Fl" C �► C 12'-0"- STAGE II 1' - 0" 27'-0" (OUT TO OUT) 24'-10" (CLEAR ROADWAY) 15'-0" - STAGE I 12'-5" I 12'-5" -L- VERTICAL CONCRETE BARRIER RAIL (TYP.) 2%4" 6� BRG. FOR DETAILS SEE "VERTICAL CONCRETE BARRIER RAIL SECTION" 2%4" BRG. 2%4" BRG. GRADE PT. ASPHALT WEARING 0.02 ANN_ FO_ B 0.02 SURFACE (SEE ROADWAY PLANS) 00 O 0000 00 -` nn 3'-0„ L* B 0.6" 0 L.R. TRANSVERSE SHEAR KEYS TO BE FILLED WITH POST -TENSIONING STRAND (TYP.) GROUT AFTER ALL ERECTION HAS IN 21/2" 0 HOLE BEEN COMPLETED AND AFTER FINAL TENSIONING OF TRANSVERSE STRANDS TYPE V TYPE IV UNIT TYPE III TYPE II UNIT TYPE I UNIT UNIT UNIT �I� 9 PRESTRESSED CONCRETE CORED SLAB UNITS = 27'-0" HALF SECTION HALF SECTION THROUGH VOIDS TYPICAL SECTION AT INTERMEDIATE DIAPHRAGMS *-THE MAXIMUM BARRIER RAIL HEIGHT AND ASPHALT THICKNESS IS SHOWN. THE HEIGHT OF THE BARRIER RAIL AND ASPHALT THICKNESS VARIES WHILE THE TOP OF THE BARRIER RAIL FOLLOWS THE PROFILE OF THE GUTTERLINE. FOR RAIL HEIGHT DETAILS AND ASPHALT THICKNESS SEE THE "VERTICAL CONCRETE BARRIER RAIL SECTION" DETAIL. SEE SHEET 2 OF 5 FOR SECTION VIEWS A-A,B-B.AND C-C. PERMITTED THREADED INSERT CAST IN OUTSIDE FACE OF EXTERIOR UNIT AND RECESSED %". SIZE TO BE DETERMINED BY CONTRACTOR. v ° ° D v v o v ° THREADED INSERT DETAIL 3/8 „ • . . . ° ° ° �. if 41 41 ° . SHEAR KEY DETAIL FIXED END 61/2 "x 61/2 „X 3„ BLOCKOUT FOR ASPHALT ANCHOR BOLT WEARING SURFACE 21/2" 0 HOLE \ I 12 0 i VOIDS 6„ I I /-------- ---- SEE "BRIDGE ' APPROACH SLAB" I SHEET FOR DETAILS �- - - - - - - -; rn 2 LAYERS OF 30 LB. i ROOFING FELT TO PREVENT BOND.! 11/2" QS BACKER ROD � ELASTOMERIC i BEARING PAD SEE "END BENT" C 7/8" 0 X 3'-3" SHEETS FOR DETAILS ANCHOR BOLT SECTION AT END BENT NOTE°OMIT SHEAR KEY ON OUTSIDE FACE OF EXTERIOR CORED SLABS. 3%" CL. M 0 0 r" TYPICAL PLAN (ANCHOR BOLT BLOCKOUTS) 0 61/2 " Ia Ia 4" THREAD (TYP.) ANCHOR BOLTS SECTION D-D (FIXED) C BRG. AND 21/2" 0 HOLE F CORED UNIT �- 11/8" 0 HOLES PLATE DETAILS - P1 (FIXED) P1 (36 REQ'D) BLOCKOUT DETAIL FOR ANCHOR BOLTS 3'-0" 10" 1'-41, 101, 5 S 3 #4 „B„ r,3- N `N + vo o #4 S2 12" 0 VOIDS N 3„ ]- EXTc SLAB SECTION TYPE I AND TYPE V (FOR PRESTRESSED STRAND LAYOUT, SEE INTERIOR SLAB SECTIONS - TYPE II & IV.) 3, - 0„ 1'-6" 1'-6" $1/2„ 91/2„ 91/2„ $1/2„ No 1'-2" 4" 4111'-2„ 3„ 3„ �N N #5 S1 I° i IIIU ° . I 1 I. I• #5 Si J I I I 1. L IT ♦ ♦ F +< N� #5 S1 END ELEVATION C 21/2 " 0 HOLES #5 S1 SHOWING PLACEMENT OF DOUBLE STIRRUPS AND LOCATION OF DOWEL HOLES. (STRAND LAYOUT NOT SHOWN.) INTERIOR SLAB UNIT SHOWN -EXTERIOR SLAB UNIT SIMILAR EXCEPT SHEAR KEY LOCATION. 3„ 3'-0" 1'-6" 1'-6" 1 1'-4" 10" 10 11" .4"14 11" 3" 12" 0 VOIDS N O I N 114 S 2 O t®t ttttf IF t 3 7 7 3 2 SPA. 4 SPA. 2 SPA. C� 2"CTS. 2" CTS. 2" CTS. INTERIOR SLAB SECTION TYPE II AND TYPE IV (13 STRANDS REQUIRED) Oc6`/ QS LOW RELAXATION STRAND LAYOUT ❑® BOND SHALL BE BROKEN ON THESE STRANDS FOR A DISTANCE OF 2'-0"FROM END OF CORED SLAB UNIT. SEE STANDARD SPECIFICATIONS, ARTICLE 1078-7. OPTIONAL FULL LENGTH DEBONDED STRANDS. THESE STRANDS ARE NOT REQUIRED. IF THE FABRICATOR CHOOSES TO INCLUDE THESE STRANDS IN THE CORED SLAB UNIT, THE STRANDS SHALL BE DEBONDED FOR THE FULL LENGTH OF THE UNIT AT NO ADDITIONAL COST. SEE STANDARD SPECIFICATIONS, ARTICLE 1078-7. DEBONDING LEGEND 5„ 1'-2" 7" 7" 1'-0" TEMPORARY GUARDRAIL ASSEMBLY 3 ,-I „ 0 1,-6„ I 1,-6„ 10, I 1'-4" 10" 3" I 11" I 4„ 4„ 11„ 3„ #4 "B" L 12" 0 VOID `V 8" 0 VOID O #3 BAR Wl #4 S2 1 0 00 3„ L3 INTERIOR SLAB SECTION PROJECT No. 17BP.14eRe176 HAYWOOD COUNTY TYPE III (FOR PRESTRESSED STRAND LAYOUT, SEE STATION: INTERIOR SLAB SECTIONS - TYPE II & IV.) FOR TEMPORARY GUARDRAIL ANCHOR ASSEMBLY LOCATION, SHEET 1 OF 5 SEE SECTION OF ANCHOR ASSEMBLY LOCATION ON "ANCHORAGE DETAILS FOR TEMPORARY GUARDRAIL ANCHOR ASSEMBLY FOR TYPE III CORED SLAB UNIT" SHEET. np PAPTk 11+98a67 —L— 6/19/2018 J:\188360C - 2015 W Divisions Planning & Design On- Call\I188360C Group 3 Bridges\17BP.R176.430276\Structures\Drafting\DGN's\401-011-17BP.14.R.176-SMU-CSOl.dgn HOLr rnn TRANSVERSE S A STRAND 1*1 0 UPSTATION VIEW A -A SEE SHEET 1 OF 5 C 0.6" 0 L.R. TRANSVERSE POST -TENSIONING STRAND SHEATHED WITH A NON -CORROSIVE PIPE. STRAND VISE o °o .-- OUTSIDE FACE 1 OF TYPE I CORED SLAB HOLr rnn TRANSVERSE S UPSTATION VIEW B-B SEE SHEET 1 OF 5 C 0.6" 0 L.R. TRANSVERSE POST -TENSIONING STRAND SHEATHED WITH A NON -CORROSIVE PIPE. HOLr rnn TRANSVERSE S 0 UPSTATION 19 VIEW C-C SEE SHEET 1 OF 5 C 0.6" 0 L.R. TRANSVERSE POST -TENSIONING STRAND SHEATHED WITH A NON -CORROSIVE PIPE. A STRAND #1 x 5x 5"/x 5" x 5" I la°y ° I ° STRAND #2 x 5" x 5" o STRAND #2 STRAND #2 STRAND VISE %°��I I o I STRAND VISE ° °° °°a° FILL RECESS FILL RECESS WITH GROUT OUTSIDE FACE FILL RECESS WITH GROUT 5i OF TYPE III OUTSIDE FACE /4 WITH GROUT /4 /4 CORED SLAB 4 51 LV OF TYPE V 1/4V4CORED SLAB /A 11 UPSTATION SECTION X-X (TYPE I UNIT) UPSTATION SECTION Y-Y (TYPE III UNIT) GROUTED RECESS AT END OF POST -TENSIONED STRAND CORED SLABS STRAND 41 GOES THROUGH 5 CORED SLAB UNITS (TO BE TENSIONED DURING STAGE I CONSTRUCTION) STRAND #2 GOES THROUGH ALL 9 CORED SLAB UNITS (TO BE TENSIONED DURING STAGE II CONSTRUCTION) UPSTATION SECTION Z-Z (TYPE V UNIT) PROJECT No. 17BPc14cRc176 HAYWOOD rniiNTY STATION: SHEET 2 OF 5 11+98a67 -L- 6/19/2018 J:\188360C - 2015 W Divisions Planning & Design On- Call\I188360C Group 3 Bridges\17BP.R176.430276\Structures\Drafting\DGN's\401-013-17BP.14.R.176-SMU-CS02.dgn H H W C' Q I— H W 0 a V) %4" CHAMFER 0 N N a Q 0 Q w J U 0 -L- 3'-1" 8 SPACES Ca) 5'-0"CTS. = 40'-0" FOR TEMPORARY GUARDRAIL ANCHOR ASSEMBLY LOCATION, SEE SECTION OF ANCHOR ASSEMBLY LOCATION ON "ANCHORAGE DETAILS FOR TEMPORARY GUARDRAIL ANCHOR ASSEMBLY FOR TYPE III CORED SLAB UNIT" SHEET. 0 LIMITS OF ASPHALT PAVEMENT (STAGE I) AE — C 21/2 " 0 DOWEL HOLES #4 S8 (IN PAIRS) 1*4 S7 (IN PAIRS) #4 S6 (IN PAIRS) #4 S5 (IN PAIRS) 1*4 "S" BARS SPLAYED () APPROX. EO. SPA. #5 S3 Cq� 1'-O" CTS. (a) b " U 1 5. DETAIL "A" (SIMILAR EACH END OF UNIT) NOTE:EXTERIOR UNIT SHOWN - INTERIOR UNIT SIMILAR EXCEPT OMIT #5 S3 BARS. #4 S2 PAIRS () 1'-0" CTS. 1'-91- SEE GROUTED RECESS SEE DETAIL "C", DETAIL, VIEW B-B, SEE SHEET 4 OF 5 SPLICE (SHEET 2 OF 5) (TYP.) (TYP.) — — — — — — — — — — — Ak .111 — — — — — — — — — — — — — — — — — — — — — — — — — — — I — — — — } — — — — — — — ----------------------- E 0-7 ---------------------�-y♦♦`�♦ L--------------------J--�\`i\-� L----------------------- V \ k „ 0.6" 0 L.R. TRANSVERSE , 00 6'TE�N LIONINGNSTRAND `VERSE♦\��� #q B5 (TYP.) 3 11 POST -TENSIONING STRAND `♦, S 1 ", S S ���� (2 BAR RUNS) 3'-0" IN 2/2 Qs HOLE (STRAND 2 IN 21/2" 0 HOLE (STRAND ``♦ ``` 1 -3 1 -3 • #1 -STAGE I) (TYP.) 4��` ��� TO BE TENSIONED IN q-,��, ��� � ♦� STAGE II) (TYP.) �♦ ♦♦ \\ ♦� ----------------� \♦--------------------7♦\♦♦ F — — — — — — — — — — — — — — — — — — L-----------------J L-------__-------------J L — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — ` ` — — — — — — — — — — — — — — — — — — \ \` ---------------- 0 L — — — — — — — — — — — — — — — — — J L---- —------------ L----------------- \ ♦\♦ q „ \- q • ��. �. 1- 11 \ \\ 1 - U ♦ ♦\ 3'-0" 12" 0 VOIDS "`` (TYP. EA. SLAB 0� UNIT) ♦♦ ♦♦ 3" - 5 �" ♦\\X), \\ \\\ \\\ #5 S3 & 0 SEE DETAIL "B" #5 S4 4 S \ SPLICE �; , (TYP.) GUTTERLINE # I— I (T Y P.) \ J \ \ ----��\_10-#5 B12 IN �� 10-#5 B12 IN_x VERTICAL CONCRETE C 1/2"EXP. JT. SEE GROUTED RECESS VERTICAL CONCRETE BARRIER RAIL MAT'L. IN RAIL DETAIL, VIEW A -A, BARRIER RAIL SEE DETAIL "A„ (2 BAR RUNS) (SHEET 2 OF 5) (2 BAR RUNS) (TYP.) (TYP.) 15'-0" 15'-0" 15'-0" A #4 S2 12" 0 VOIDS C 0.6" 0 L.R. TRANSVERSE POST -TENSIONING STRAND IN 21/2" 0 HOLE (STRAND #1 - STAGE I) 1*4 "S" PAIRS (SPACED AS SHOWN IN DETAIL "A") (TYP. EA. UNIT) 52-1*5 S3 (SPACED AS SHOWN IN DETAIL "A") (TYP. EA. EXT. UNIT) 52-1*5 S4 (SPACED TO MATCH S3 IN VERTICAL CONCRETE BARRIER RAIL) 22'-6" \ ♦\♦ ♦\ ♦\♦ ♦\ �� I `� r- — — — — — — — \\ I 12" 0 VOIDS I I 12" 0 VOIDS \ \\\ q„ q„ 15'-0" DETAIL "B" 15'-0" #4 S11 BARS MAY BE SHIFTED AS NECESSARY TO MAINTAIN 1" CLEAR TO GROUTED RECESS AND 21/2"0 TRANSVERSE POST -TENSIONING STRAND HOLES (TYPE I UNIT SHOWN) 45'-0" PLAN OF SPAN A STAGE I CONSTRUCTION C 0.6" 0 L.R. TRANSVERSE POST -TENSIONING STRAND IN 21/2" 0 HOLE (STRAND #2 TO BE TENSIONED IN STAGE II) 22'-6" o� 0 3'-11" • 600-00'-001, (TYP.) A #5 S3 & #5 S4 PROJECT No. 17BPc14cRc176_ HAYWOOD rniiNTY STATION: SHEET 3 OF 5 11+98a67 -L- 6/19/2018 J:\188360C - 2015 W Divisions Planning & Design On- Call\I188360C Group 3 Bridges\17BP.R176.430276\Structures\Drafting\DGN's\401-015-17BP.14.R.176-SMU-CS03.dgn 45'- 0" LL a v^ z x LL 22'-6" 6" 1 52-#5 S3 (SPACED AS SHOWN IN DETAIL "A") (TYP. EA. EXT. UNIT) I 52-#5 S4 (SPACED TO MATCH S3 IN VERTICAL CONCRETE BARRIER RAIL) 1*4 "S" PAIRS (SPACED AS SHOWN IN DETAIL "A") (TYP. EA. UNIT) 15'-0" #5 S3 & SEE DETAIL "D" #5 S4 10-#5 B12 IN (TYP.) VERTICAL CONCRETE C 0.6" 0 L.R. TRANSVERSE POST -TENSIONING STRAND IN 21/2" 0 HOLE (STRAND #1 - STAGE I) 22'-6" 15'-0" 15'-0" SEE GROUTED RECESS 10-#5 B12 IN 1/2"EXP. JT. DETAIL, VIEW C-C, VERTICAL CONCRETE MAT'L. IN RAIL (SHEET 2 OF 5) BARRIER RAIL (TYP.) (2 BAR RUNS) 0.6" 0 L.R. TRANSVERSE 3'-5" POST -TENSIONING STRAND `��, SPLICE IN 21/2" 0 HOLE (STRAND #2 (TYP.) TO BE TENSIONED IN \; STAGE II) (TYP.) SPLICE 1'-0" 1'-3" 12" 0 VOIDS (TYP. EA. SLAB UNIT) 15'-0" 15'-0" C 0.6" 0 L.R. TRANSVERSE POST -TENSIONING STRAND 611 8„ IN 21/2" 0 HOLE (STRAND #2 TO BE TENSIONED IN \ \ STAGE II) ------ r-------- 1 12" 0 VOID 12" 0 VOID #5 S3 & #5 S4 DETAIL "D"\ #4 \%S" #4 S11 BARS MAY BE SHIFTED AS NECESSARY TO MAINTAIN 1" CLEAR TO GROUTED RECESS AND 21/2"0 TRANSVERSE POST -TENSIONING STRAND HOLES (TYPE V UNIT SHOWN) \-#4 B5 (TYP.) (2 BAR RUNS) 1,_0„ 1,_3„ 3 -p ------� \\\, F------------------� �,----------------� O ------� ---------------J ��\`L----------------� --------� -- ----------------- ----------------� --------J L---------------------J L-----------------J \ `F. 1'-0" 1'-3" 1'-0" 3'-11" ` 60 °-00'-00" (TYP.) ------------------------------------------------- L----------------------------------------------- ` L------------------------------------------------� 15'-0" 15'-0" 4" 1 4" r- - - - - - - - - 8" 0 VOID 11 1 8" 0 VOID 12" 0 VOID 1 1 12" 0 VOID DETAIL "C" PLAN OF SPAN A C 0.6" 0 L.R. TRANSVERSE POST -TENSIONING STRAND IN 21/2" 0 HOLE (STRAND #2 TO BE TENSIONED IN STAGE II) STAGE II CONSTRUCTION PROJECT No. 17BP.14cRc176 HAYWOOD STATION: SHEET 4 OF 5 11+98a67 COUNTY -L- #4 S11 BARS MAY BE SHIFTED AS NECESSARY TO MAINTAIN 1" CLEAR TO GROUTED RECESS AND 21/2"0 TRANSVERSE POST -TENSIONING STRAND HOLES (TYPE III UNIT SHOWN) 6/19/2018 J:\188360C - 2015 W Divisions Planning & Design On- Call\I188360C Group 3 Bridges\17BP.R176.430276\Structures\Drafting\DGN's\401-017-17BP.14.R.176-SMU-CSO4.dgn BILL OF MATERIAL FOR ONE 45' CORED SLAB UNIT STAGE I STAGE II TYPE I UNIT TYPE II UNIT TYPE III UNIT TYPE IV UNIT TYPE V UNIT BAR NUMBER SIZE TYPE LENGTH WEIGHT LENGTH WEIGHT LENGTH WEIGHT LENGTH WEIGHT LENGTH WEIGHT B5 4 #4 STIR 23'-3" 62 23'-3" 62 23'-3" 62 23'-3" 62 23'-3" 62 Si 8 #5 3 4'-6" 38 4'-6" 38 4'-6" 38 4'-6" 38 4'-6" 38 S2 92 #4 3 5'-4" 328 5'-4" 328 5'-4" 328 5'-4" 328 5'-4" 328 S3 54 #5 1 5'-7" 314 5'-7" 314 S5 4 #4 3 5'-5" 14 5'-5" 14 5'-5" 14 5'-5" 14 5'-5" 14 S6 4 #4 3 5'-6" 15 5'-6" 15 5'-6" 15 5'-6" 15 5'-6" 15 S7 4 #4 3 5'-7" 15 5'-7" 15 5'-7" 15 5'-7" 15 5'-7" 15 S8 4 #4 3 5'-9" 15 5'-9" 15 5'-9" 15 5'-9" 15 5'-9" 15 REINFORCING STEEL LBS. 487 487 487 487 487 EPDXY COATED REINFORCING STEEL LBS. 314 314 5000 P.S.I. CONCRETE CU. YDS. 6.7 6.7 7.4 6.7 6.7 0.6" 0 L.R. STRANDS No. 13 13 13 13 13 BILL OF MATERIAL FOR VERTICAL CONCRETE BARRIER RAIL STAGE I BAR BARS PER TYPE I UNIT TOTAL NO. SIZE TYPE LENGTH WEIGHT • B12 40 40 #5 STIR 13'-0" 542 • S4 54 54 #5 2 7'-2" 404 i i EPDXY COATED REINFORCING STEEL LBS. 946 CLASS AA CONCRETE CU.YDS. 5.8 TOTAL VERTICAL CONCRETE BARRIER RAIL LN.FT. 45.00 STAGE II BAR BARS PER TYPE V UNIT TOTAL NO. SIZE TYPE LENGTH WEIGHT • B12 40 40 #5 STIR 13'-0" 542 • S4 54 54 #5 2 7'-2" 404 EPDXY COATED REINFORCING STEEL LBS. 946 CLASS AA CONCRETE CU.YDS. 5.8 TOTAL VERTICAL CONCRETE BARRIER RAIL LN.FT. 45.00 CO c� r 00 i M J Q =rr Q n V) a- LJj = J LL Of, = Ld �a CD rr Uj 0� Uj v V) �LL cn z w Y I —I u rr- �-- Q= >� 1'-0" 1" 10" 1" 2" CL. MIN. DESIGNED BY: S. NATARAJAN DATE : MAR 2017 DRAWN BY: M.J.OSTRISHKO DATE : MAR 2017 CHECKED BY: N.A. PIERCE DATE : APR 2017 DESIGN ENGINEER OF RECORD: - DATE : - L D J n C01 ASPHALT WEARING SURFACE CONCRETE RELEASE STRENGTH UNIT PSI 45' UNITS 4000 GRADE 270 STRANDS 0.6" 0 L.R. AREA ( SQUARE INCHES ) 0.217 ULTIMATE STRENGTH 58,600 ( LBS. PER STRAND ) APPLIED PRESTRESS 43,950 ( LBS. PER STRAND ) CORED SLABS REQUIRED STAGE I NUMBER LENGTH TOTAL LENGTH TYPE I 1 45'-0" 45'-0" TYPE II 3 45'-0" 135'-0" TYPE III 1 45'-0" 45'-0" STAGE II NUMBER LENGTH TOTAL LENGTH TYPE IV 3 45'-0" 135'-0" TYPE V 1 45'-0" 45'-0" TOTAL 9 405'-0" SECTION S-S AT DAM IN OPEN JOINT (THIS IS TO BE USED ONLY WHEN SLIP FORM IS USED) DEAD LOAD DEFLECTION AND CAMBER 3'-0"x 1'-9" 45' CORED SLAB UNIT 0.6" 0 L.R. STRAND CAMBER ( SLAB ALONE IN PLACE DEFLECTION DUE TO SUPERIMPOSED DEAD LOAD I „ /8 + FINAL CAMBER Y4 *K INCLUDES FUTURE WEARING SURFACE C I/2" EXP. JT. MAT'L. S HELD IN PLACE WITH GALVANIZED NAILS. NOTE: OMIT EXP. JT. CHAMFER 34"' MAT'L. WHEN SLIP FORM IS USED) (SEE "PLAN OF "FOR SPACING) ELEVATION AT Y4" IPICHAMFER S EXPANSION JOINTS VERTICAL CONCRETE BARRIER RAIL DETAILS FIELE #5 Q0 Q0 11 CV 7„ BAR TYPES ao V) Ln V) Ln V) CV N N O M Q w 7 Y4 ALL BAR DIMENSIONS ARE OUT TO OUT if BEARING PAD 8" 1" 0 HOLES SEARING PAD - TYPE I - FIXED END ( TYPE I - 18 REQ' D ) ELASTOMERIC BEARING DETAILS ELASTOMER IN ALL BEARINGS SHALL BE 50 DUROMETER HARDNESS. 1,-0„ 1" 10" 1" END VIEW FIELD BEND "B" BARS 0 FIEL Cut #5 c 2'-0," 4-#5 I. VIVJ 1 a U I . SIDE VIEW END OF RAIL DETAILS NOTES ALL PRESTRESSING STRANDS SHALL BE 7-WIRE LOW RELAXATION GRADE 270 STRANDS AND SHALL CONFORM TO AASHTO M203 EXCEPT FOR SAMPLING REQUIREMENTS WHICH SHALL BE IN ACCORDANCE WITH THE STANDARD SPECIFICATIONS. ALL REINFORCING STEEL CAST WITH THE CORED SLAB SECTIONS SHALL BE GRADE 60 AND SHALL BE INCLUDED IN THE UNIT PRICE BID FOR PRESTRESSED CONCRETE CORED SLABS. RECESSES FOR TRANSVERSE STRANDS SHALL BE GROUTED AFTER THE TENSIONING OF THE STRANDS. THE 21/2"0 HOLES AT FIXED ENDS OF SLAB SECTIONS SHALL BE FILLED WITH NON -SHRINK GROUT. THE BACKER RODS SHALL CONFORM TO THE REQUIREMENTS OF TYPE M BOND BREAKER. SEE SECTION 1028 OF THE STANDARD SPECIFICATIONS. WHEN CORED SLABS ARE CAST, AN INTERNAL HOLD-DOWN SYSTEM SHALL BE EMPLOYED TO PREVENT VOIDS FROM RISING OR MOVING SIDEWAYS. AT LEAST SIX WEEKS PRIOR TO CASTING CORED SLABS, THE CONTRACTOR SHALL SUBMIT TO THE ENGINEER FOR REVIEW AND COMMENT, DETAILED DRAWINGS OF THE PROPOSED HOLD-DOWN SYSTEM. IN ADDITION TO STRUCTURAL DETAILS, LOCATION AND SPACING OF THE HOLD-DOWNS SHALL BE INDICATED. ALL REINFORCING STEEL IN THE VERTICAL CONCRETE BARRIER RAIL SHALL BE EPDXY COATED. PRESTRESSING STRANDS SHALL BE CUT FLUSH WITH THE CORED SLAB UNIT ENDS. APPLY EPDXY PROTECTIVE COATING TO CORED SLAB UNIT ENDS. GROOVED CONTRACTION JOINTS,I/2" IN DEPTH, SHALL BE TOOLED IN ALL EXPOSED FACES OF THE BARRIER RAIL AND IN ACCORDANCE WITH ARTICLE 825-10(B)OF THE STANDARD SPECIFICATIONS.A CONTRACTION JOINT SHALL BE LOCATED AT EACH THIRD POINT BETWEEN BARRIER RAIL EXPANSION JOINTS. ONLY ONE CONTRACTION JOINT IS REQUIRED AT MIDPOINT OF BARRIER RAIL SEGMENTS LESS THAN 20 FEET IN LENGTH AND NO CONTRACTION JOINTS ARE REQUIRED FOR THOSE SEGMENTS LESS THAN 10 FEET IN LENGTH. FLAME CUTTING OF THE TRANSVERSE POST -TENSIONING STRAND IS NOT ALLOWED. THE TRANSFER OF LOAD FROM THE ANCHORAGES TO THE CORED SLAB UNIT SHALL BE DONE WHEN THE CONCRETE HAS REACHED A COMPRESSIVE STRENGTH OF NOT LESS THAN THE REQUIRED STRENGTH SHOWN IN THE "CONCRETE RELEASE STRENGTH" TABLE. FOR GROUT FOR STRUCTURES, SEE SPECIAL PROVISIONS. THE PERMITTED THREADED INSERTS ARE DETAILED AS AN OPTION FOR THE CONTRACTOR TO ATTACH FALSEWORK AND FORMWORK DURING CONSTRUCTION. THE PERMITTED THREADED INSERTS IN THE EXTERIOR UNITS SHALL BE SIZED BY THE CONTRACTOR, SPACED AT 4'-0"CENTERS AND GALVANIZED IN ACCORDANCE WITH SECTION 1076 OF THE STANDARD SPECIFICATIONS. STAINLESS STEEL THREADED INSERTS MAY BE USED AS AN ALTERNATE. THE PERMITTED THREADED INSERTS SHALL BE GROUTED BY THE CONTRACTOR IMMEDIATELY FOLLOWING REMOVAL OF THE FALSEWORK. THE COST OF THE PERMITTED THREADED INSERTS SHALL BE INCLUDED IN THE PRICE BID FOR THE PRECAST UNITS. AT ALL FIXED ENDS OF CORED SLAB UNITS, NUTS FOR ANCHOR BOLTS ARE TO BE TIGHTENED FINGER TIGHT AND THEN BACKED OFF I/2 TURN. THE THREAD OF THE NUT AND BOLT SHALL THEN BE BURRED WITH A SHARP POINTED TOOL. ANCHOR BOLTS, NUTS, WASHERS AND PLATES SHALL BE GALVANIZED IN ACCORDANCE WITH THE STANDARD SPECIFICATIONS. ANCHOR BOLTS SHALL MEET THE REQUIREMENTS OF ASTM A449.NUTS SHALL MEET THE REQUIREMENTS OF AASHTO M291-DH OR AASHTO M292-2H.WASHERS SHALL MEET THE REQUIREMENTS OF AASHTO M293.SHOP DRAWINGS ARE NOT REQUIRED FOR ANCHOR BOLTS, NUTS, WASHER AND PLATES. SHOP INSPECTION IS REQUIRED. 17 B P a 14 R a 17 6 PROJECT NO. HAYWOOD W SY USA Inc. 434 FAYETTEVILLE STREET SUITE 1500 RALEIGH, NC 27601 TEL: 1.919.836.4040 DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED PRIELONUMARV PLAMS [DO moo USE FOR C OO I`iIn sTRUC TUCH STATION: SHEET 5 OF 5 11+98a67 COUNTY —L— STATE OF NORTH CAROLINA DEPARTMENT OF TRANSPORTATION RALEIGH 3/_O// X 11_9/1 PRESTRESSED CONCRETE CORED SLAB UNIT 600 SKEW REVISIONS SHEET NO. 40. BY: DATE: NO. BY: DATE: S — 1 O TOTAL SHEETS 2 1 22 6/19/2018 J:\188360C - 2015 W Divisions Planning & Design On- Call\I188360C Group 3 Bridges\17BP.R176.430276\Structures\Drafting\DGN's\401-019-17BP.14.R.176-SMU-CS05.dgn LICENSE NO. F-0165 POST AND GUARDRAIL ANCHOR ASSEMBLY NOTES H w 0 a V) D) SECTION OF ANCHOR ASSEMBLY LOCATION (TYPE III UNIT OF STAGE I) THE #3 BARS ARE INCIDENTAL AND THEIR COST SHALL BE INCLUDED IN THE PRICE BID FOR THE PRESTRESSED CONCRETE CORED SLABS. 12'-O" (APPROACH SLAB) 1* i M A ii r it l A /1 r A e- 1 I- 7 // PLAN - SIDE VIEW ELEVATION 0.375" 0 WIRE STRUT THREADED STEEL FERRULE -0 FIT 1" 0 X 2 1/4" BOLT JITH ROUND WASHER RPW TEMPORARY GUARDRAIL ANCHOR ASSEMBLY (9 ASSEMBLIES REQUIRED IN THE TYPE III CORED SLAB UNIT) (6 ASSEMBLIES REQUIRED IN THE APPROACH SLABS) 45'-0" (CORED SLAB LENGTH) 2'-1" 4'-0" 4'-0" 5'-0" 8 SPA. na 5'-O" CTS. TEMPORARY GUARDRAIL ANCHOR ASSEMBLY (TOTAL 15 REQUIRED) 1'-11" 3'-1" LIMITS OF ASPHALT 8"- VOID PAVEMENT (STAGE I) 8'"VOID LiL:j —� W.P. #1 `♦ H ♦ � H FILL FACE (a) �♦ ♦� '-' w Q z END BENT 1 , ♦ o 0- ` 12'-0" (APPROACH SLAB) 5'-0" 1'-11"I 3'-1" 8" VOID THE TEMPORARY GUARDRAIL ANCHOR ASSEMBLY SHALL CONSIST OF THE FOLLOWING COMPONENTS: A. FERRULES SHALL BE MADE FROM STEEL MEETING THE REQUIREMENTS OF ASSHTO M169, GRADE 12L14 AND SHALL HAVE A MINIMUM LENGTH OF THREADS OF 21/2". B. 4 - 1" (-� X 21/4" BOLTS WITH WASHERS. BOLTS SHALL CONFORM TO THE REQUIREMENTS OF ASTM A307. BOLTS AND WASHERS SHALL BE GALVANIZED. AT HE CONTRACTOR'S OPTION, STAINLESS STEEL BOLTS AND WASHERS MAY BE USED AS AN ALTERNATE FOR THE PO X 21/4" GALVANIZED BOLTS AND WASHERS. THEY SHALL CONFORM TO OR EXCEED THE MECHANICAL REQUIREMENTS OF ASTM A307. THE USE OF THIS ALTERNATE SHALL BE APPROVED BY THE ENGINEER. C. WIRE STRUTS SHOWN IN THE TEMPORARY GUARDRAIL ANCHOR ASSEMBLY DETAIL ARE THE MINIMUM ALLOWABLE SIZE AND SHALL HAVE A MINIMUM TENSILE STRENGTH OF 100,000 PSI. TEMPORARY GUARDRAIL ANCHOR ASSEMBLY WITH BOLTS SHALL BE ASSEMBLED IN THE SHOP. BOLT THREADS MAY BE RECUT AS NECESSARY TO INSURE FIT. THE COST OF THE TEMPORARY GUARDRAIL ANCHOR ASSEMBLY COMPLETE IN PLACE,SHALL BE INCLUDED, AS APPLICABLE, IN THE UNIT CONTRACT PRICE BID FOR 3'-O" X 1'-9" PRESTRESSED CONCRETE CORED SLAB OR LUMP SUM PRICE BID FOR APPROACH SLABS. FERRULES TO BE PLUGGED DURING THE CASTING OF THE CORED SLAB UNITS OR POURING OF APPROACH SLAB AS RECOMMENDED BY THE MANUFACTURER. AT THE CONTRACTOR'S OPTION, FERRULES WITH OPEN OR CLOSED ENDS MAY BE USED. PAYMENT FOR TEMPORARY GUARDRAIL,POST AND POST PLATES IS INCLUDED IN ROADWAY PAY ITEMS. 4'-0" 4'-0" . 1 11" ---------------------- --- - ------------------------- ♦♦ — —I ` ` W.P. #2 12" V O I D `♦ `\�♦ (TYP, EXCEPT ♦ `, AS NOTED) `♦ Q FILL FACE END BENT 2 ,. RAIL POST SPACING FOR TEMPORARY GUARDRAIL -STAGE I -L- APPROACH SLAB CONST. JOINT (TYP.) N N PROJECT No, 17BPc14cRc176 HAYWOOD rniiNTY STATION: 11+98a67 —L— 6/19/2018 J:\188360C - 2015 W Divisions Planning & Design On- Call\I188360C Group 3 Bridges\17BP.R176.430276\Structures\Drafting\DGN's\401-021-17BP.14.R.176-SMU-TGRAOI.dgn NOTES GUARDRAIL CHOR ASSEI C 1%16" 0 HOLES ( 1/4" HOLD-DOW F+E PLAN ro M r M r n 1/4" HOLD-DOWN F C GUARDR� ANCHOR ASS Q0 SECTION E—E Fr1R 10('ATToKi r1F M lApnPATl AK11"H P DLT GUARDRAIL ANCHOR ASSEMBLY DETAILS ELEVATION PLAN LOCATION OF ANCHORS FOR GUARDRAIL END BENT 1 SHOWN, END BENT 2 SIMILAR. THE GUARDRAIL ANCHOR ASSEMBLY SHALL CONSIST OF A 1/4" HOLD DOWN PLATE AND 7 - 7/8" 0 BOLTS WITH NUTS AND WASHERS. THE HOLD-DOWN PLATE SHALL CONFORM TO AASHTO M270 GRADE 36.AFTER FABRICATION, THE HOLD-DOWN PLATE SHALL BE HOT -DIP GALVANIZED IN ACCORDANCE WITH AASHTO M111. BOLTS SHALL CONFORM TO THE REQUIREMENTS OF ASTM A307 AND NUTS SHALL CONFORM TO THE REQUIREMENTS OF AASHTO M291. BOLTS, NUTS AND WASHERS SHALL BE GALVANIZED. (AT THE CONTRACTOR'S OPTION, STAINLESS STEEL BOLTS, NUTS AND WASHERS MAY BE USED AS AN ALTERNATE FOR THE 7/8" 0 GALVANIZED BOLTS, NUTS AND WASHERS. THEY SHALL CONFORM TO OR EXCEED THE MECHANICAL REQUIREMENTS OF ASTM A307.THE USE OF THIS ALTERNATE SHALL BE APPROVED BY THE ENGINEER.) THE GUARDRAIL ANCHOR ASSEMBLY IS REQUIRED AT ALL POINTS WHERE APPROACH GUARDRAIL IS TO BE ATTACHED TO THE END OF BARRIER RAIL. FOR POINTS OF ATTACHMENT, SEE SKETCH. AFTER INSTALLATION, THE EXPOSED THREAD OF THE BOLT SHALL BE BURRED WITH A SHARP POINTED TOOL. THE COST OF THE GUARDRAIL ANCHOR ASSEMBLY SHALL BE INCLUDED IN THE UNIT CONTRACT PRICE BID FOR VERTICAL CONCRETE BARRIER RAIL. THE VERTICAL REINFORCING BARS MAY BE SHIFTED SLIGHTLY IN THE VERTICAL CONCRETE BARRIER RAIL TO CLEAR ASSEMBLY BOLTS. THE 11/4" 0 HOLES SHALL BE FORMED OR DRILLED WITH A CORE BIT. IMPACT TOOLS WILL NOT BE PERMITTED. ANY CONCRETE DAMAGED BY THIS WORK SHALL BE REPAIRED TO THE SATISFACTION OF THE ENGINEER. BEGIN OF CORED -- SLAB UNITS @ END BENT 1 END OF CORED SLAB UNITS Cq� END BENT 2 SKETCH SHOWING POINTS OF ATTACHMENT DENOTES GUARDRAIL ANCHOR ASSEMBLY PROJECT NO. 17BP.14eRe176 HAYWOOD rniiNTY STATION: 11+98a67 —L- 6/19/2018 J:\188360C - 2015 W Divisions Planning & Design On- Call\I188360C Group 3 Bridges\17BP.R176.430276\Structures\Drafting\DGN's\401-023-17BP.14.R.176-SMU-gro0l.dgn STD. NOa GRA3 12" X SHEAI i 0 i 0.0373 SLOPE A EL. 2971.11—\ I +1 EL. 2971.20 #4 B2 TO PROJECT 3'-O" INTO STAGE II CONST. —� 0 JOINT N 12" X 31/2 ", SHEAR KEY c\, EL.2967.18 114 B2 (EACH FACE) G1'11:31 38'-2" EL. 2972.96 TOP OF WING #4 B3 UNDER #4 B2 (LEVEL) OVER PILES Ca) 4'-0"CTS. (6 REO'D) CONST. JT. cr w Ln a U OUR #2 PPER PART F WING POUR # 1 CAP, LOWER PART OF WING & CONCRETE COLLARS TOP OF PILE ELEVATIONS O2969.09 Q� 2968.77 O2968.46 NOTES STIRRUPS IN CAP MAY BE SHIFTED AS NECESSARY TO CLEAR ANCHOR BOLTS. THE CONCRETE IN THE SHADED AREA OF THE WING SHALL BE POURED AFTER THE VERTICAL CONCRETE BARRIER RAIL IS CAST IF SLIP FORMING IS USED. FOR PILE SPLICE DETAILS,SEE SHEET 4 OF A. FOR WING DETAILS, SEE SHEET 3 OF 4. ANCHOR BOLTS SHALL MEET THE REOUIREMENTS OF ASTM A449 AND SHALL BE GALVANIZED. NO SEPARATE PAYMENT WILL BE MADE FOR THE ANCHOR BOLTS AND THE COST OF MATERIALS AND INSTALLATION SHALL BE INCLUDED IN OTHER PAY ITEMS. THE CONTRACTOR'S ATTENTION IS CALLED TO THE FACT THAT THE LENGTHS OF THE #9 "B" BARS AT THE CONSTRUCTION JOINT MAY NEED TO BE ADJUSTED DUE TO THE TYPE OF MECHANICAL BUTT SPLICE CHOSEN BY THE CONTRACTOR. NO ADDITIONAL PAYMENT WILL BE MADE FOR ANY ADJUSTMENTS. MECHANICAL COUPLERS SHALL BE USED TO JOIN THE 119 "B" BARS IN BOTTOM AND TOP OF CAP IN STAGE I WITH THE #9 "B" BARS IN THE BOTTOM AND TOP OF CAP IN STAGE II. THE LOCATION OF THE COUPLERS SHALL BE STAGGERED ON ALTERNATING BARS BY 1 FOOT AND THE BARS SHALL BE CUT ACCORDINGLY TO ALLOW A MINIMUM OF 1'-O" AND A MAXIMUM OF 2'-O" EXTENSION INTO STAGE II CONSTRUCTION. THE CONTRACTOR'S ATTENTION IS CALLED TO THE FACT THAT THIS ANCHOR BOLT MAY BE PLACED IN STAGE I OR DRILLED AND GROUTED IN STAGE II. STAGE II PLAN CAP STAGE I SECTION THRU SHEAR KEY MECHANICAL COUPLER-" Lp\ LP 4j0 \\— EL. 2966.34 (TYP. #9 BARS) 41�2„ A /,,-#4 3"HIGH BEAM BOLSTER &WTIO OF CAP 119 B1 TO PROJECT 1. B2 - C� 5'-0"CTS. G PROJECT NO. 17BPc14cRc176 1'-O" MIN. TO 2'-O" MAX. 2'-O" MIN. (OVER PILES) 7 8 # 5- 4 S1 & S2 EMBEDMENT -- 7 7 # 12- 4 S1 & S2 (TYP4-#4 EA 7 (TYP. EA. PILE) �� H A Y W O O D COUNTY (� 7 T S. (TYP.) (a� 8 CTS. (TYP. EACH BAY) #4 S1 & S2 (TYP.) 11+98a67 —L— STATION:. „ gl/2 8,_6„ 8,_6„ 1-4 SHEET 1 OF 4 C HP 12 X 53 STEEL PILES 3 0 ELEVATION 9 WINGS NOT SHOWN FOR CLARITY. FOR SECTION A -A, SEE SHEET 2 OF 4. CONCRETE COLLARS FOR STEEL PILES NOT SHOWN IN PLAN AND ELEVATION VIEWS FOR CLARITY. SEE "CORROSION PROTECTION FOR STEEL PILES DETAIL", SHEET 4 OF 4. 6/19/2018 J:\188360C - 2015 W Divisions Planning & Design On- Call\I188360C Group 3 Bridges\17BP.R176.430276\Structures\Drafting\DGN's\401-025-17BP.14.R.176-SMU-EB101.dgn Kf:1WA NOTES POUR # UPPER PAR OF WIN POUR #3 CAP, LOWER PART OF WING & CONCRETE COLLARS ELEVATION WINGS NOT SHOWN FOR CLARITY. CONCRETE COLLARS FOR STEEL PILES NOT SHOWN IN PLAN AND ELEVATION VIEWS FOR CLARITY. SEE "CORROSION PROTECTION FOR STEEL PILES DETAIL", SHEET 4 OF 4. -L- �� 1-44 "B" B) EA. FACE TOP OF PILE ELEVATIONS Q2969.72 E02969.41 1'-0" 11" 10" 1'-71//„ - STIRRUPS IN CAP MAY BE SHIFTED AS NECESSARY TO CLEAR ANCHOR BOLTS. THE CONCRETE IN THE SHADED AREA OF THE WING SHALL BE POURED AFTER THE ERTICAL CONCRETE BARRIER RAIL IS CAST IF SLIP FORMING IS USED. FOR PILE SPLICE DETAILS,SEE SHEET 4 OF 4. FOR WING DETAILS, SEE SHEET 3 OF 4. ANCHOR BOLTS SHALL MEET THE REQUIREMENTS OF ASTM A449 AND SHALL BE GALVANIZED. NO SEPARATE PAYMENT WILL BE MADE FOR THE ANCHOR BOLTS AND THE COST OF MATERIALS AND INSTALLATION SHALL BE INCLUDED IN OTHER PAY ITEMS. THE CONTRACTOR'S ATTENTION IS CALLED TO THE FACT THAT THIS ANCHOR BOLT MAY BE PLACED IN STAGE I OR DRILLED AND GROUTED IN STAGE II. C 7/8" O X 3'-Y ANCHOR BOLT SECTION A -A MOB0141AWIP 17BP.14eRe176 HAYWOOD rniiNTY (CONCRETE COLLAR NOT SHOWN FOR CLARITY. SEE "CORROSION PROTECTION FOR STEEL PILES DETAIL.") STATION: SHEET 2 OF 4 11+98a67 —L— 6/19/2018 J:\188360C - 2015 W Divisions Planning & Design On- Call\I188360C Group 3 Bridges\17BP.R176.430276\Structures\Drafting\DGN's\401-027-17BP.14.R.176-SMU-EB102.dgn #4 K1 rM rr O J U N O J U N 3" 1 2'-01/4„ I 91_01, PLAN OF WING(W1 I (LA. FAUL) I I "� PLAN OF WING (W2 STAGE II STAGE I #4 V1 BARS (EA. FACE) 3" 3" #4 V1 BARS (EA. FACE) ELEVATION OF WING W1 STAGE II EL.2966.34 (LEVEL) WING DETAILS ELEVATION OF WINUGW2 STAGE I 2,_01/4„ E) E a LL a LL rr- Q # 9 2,,CL. 2,,CL. V) a I- C� U N 00 rM W W L U U Q a L J Y J U LL CO = N 2 V # # C° 'O N ,� a I- '� a_ U (n 00 Ln T 1T1f7-1 �"1 -#4 V1 FILL FACE CONST. JT. 3"HIGH B.B. SECTION X—X 1,_0„ #4 V1 ONST. JT. J nlun o.o. SECT ION Y—Y PROJECT No. 17BPc14cRc176 HAYWOOD rniiNTY STATION: SHEET 3 OF 4 11+98a67 —L- 6/19/2018 J:\188360C - 2015 W Divisions Planning & Design On- Call\I188360C Group 3 Bridges\17BP.R176.430276\Structures\Drafting\DGN's\401-029-17BP.14.R.176-SMU-EB103.dgn MINIMUM OF 3- ONE CUBIC FOOT BAGS OF #78M STONE. BAGS SHALL BE OF POROUS- FABRIC,SECURELY TIED. GRADE TO DRAIN TOE OF SLOPE 6"( MIN.) PIPE FOR DRAINAGE BAGGED STONE AND PIPE SHALL BE PLACED IMMEDIATELY AFTER COMPLETION OF END BENT EXCAVATION. PIPE MAY BE EITHER CONCRETE, CORRUGATED STEEL, CORRUGATED ALUMINUM ALLOY, OR CORRUGATED PLASTIC. PERFORATED PIPE WILL NOT BE ALLOWED. BAGGED STONE SHALL REMAIN IN PLACE UNTIL THE ENGINEER DIRECTS THAT IT BE REMOVED. THE CONTRACTOR SHALL REMOVE AND DISPOSE OF SILT ACCUMULATIONS AT BAGGED STONE WHEN SO DIRECTED BY THE ENGINEER. BAGS SHALL BE REMOVED AND REPLACED WHENEVER THE ENGINEER DETER- MINES THAT THEY HAVE DETERIORATED AND LOST THEIR EFFECTIVENESS. NO SEPARATE PAYMENT WILL BE MADE FOR THIS WORK AND THE ENTIRE COST OF THIS WORK SHALL BE INCLUDED IN THE UNIT CONTRACT PRICE BID FOR THE SEVERAL PAY ITEMS. TEMPORARY DRAINAGE AT END BENT C BEARING 1"X 8"X ELASTOMERI PAD (TYPE I CORED 2'-6" SLAB UNIT DETAIL "A" DESIGNED BY: S. NATARAJAN DATE : APR 2017 DRAWN BY: M.J.OSTRISHKO DATE : APR 2017 CHECKED BY: N.A. PIERCE DATE : APR 2017 DESIGN ENGINEER OF RECORD: - DATE : - BACK GOUGE DETAIL B BACK GOUGE DETAIL A v PILE VERTICAL PILE HORIZONTAL O 00 x o p„ T p I/s„ O 0 OR VERTICAL 600"100 p„ T p I/8 1 1 DETAIL A o 0 A DETAIL B POSITION OF PILE DURING WELDING. PILE SPLICE DETAILS -- -- r r PILES -__ CONCRETE COLLARS FILL FACE 2'-0" 0 CONCRETE COLLAR (TYP. EACH PILE) PLAN CONCRETE 11 COLLAR C HP 12 X 53 STEEL PILE BAR TYPES BILL OF MATERIAL STAGE I O BAR NO. SIZE TYPE LENGTH WEIGHT HK. B1 8 #9 1 26'-3" 714 B2 14 #4 STIR 25'-0" 234 B3 6 #4 STIR 2'-5" 10 B1 1'-3" 25'-Oil H3 20 #4 3 8'-10" 118 B4 1'-3" 16'-1" K1 8 #4 STIR 3'-3" 17 S1 31 #4 4 10'-5" 216 q„ S2 31 #4 5 3'-2" 66 S3 12 #4 6 6'-6" 52 3 �- O V1 26 #4 STIR 6'-2" 107 OCP REINFORCING STEEL 1534 LBS. 8'-8" H2 CLASS A CONCRETE BREAKDOWN ql/2" 2-_5" 41/211 POUR #1 CAP, PART COLLARS 10.8 C.Y. WINGSHK. HK. Y = POUR 112 UPPER PART OF 1.1 C.Y. C 5 WINGS O 1'-3" LAP TOTAL CLASS A CONCRETE 11.9 C.Y. q0 BILL OF MATERIAL STAGE II BAR NO. SIZE TYPEI LENGTH WEIGHT © B4 8 #9 1 17'-4" 471 2'-5" B5 14 #4 STIR 16'-1" 150 B3 4 #4 STIR 2'-5" 6 1'-8" 0 H1 10 1 114 2 9'-91, 65 H2 10 #4 2 9'-4" 62 ALL BAR DIMENSIONS ARE OUT TO OUT. K1 8 #4 STIR 3'-3" 17 END BENT 1 - STAGE I END BENT 1 - STAGE II S1 22 114 4 10'-5" 153 HP 12 X 53 STEEL PILES HP 12 X 53 STEEL PILES S2 22 #4 5 3'-2" 47 N0: 3 LIN. FT. = 75 N0: 2 LIN. FT. = 50 S3 8 #4 6 6'-6" 35 STEEL PILE POINTS NO:3 STEEL PILE POINTS NO:2 V1 27 #4 STIR 6'-2" 111 REINFORCING STEEL 1117 LBS. CLASS A CONCRETE BREAKDOWN POUR #3 CAP, LOWER PART 8.0 C.Y. OF WINGS & COLLARS II II POUR #4 UPPER PART OF 1.1 C.Y. II I II WINGS II II TOTAL CLASS A CONCRETE 9.1 C.Y. II II VBOTTOM OF CAP II I II ELEVATION CORROSION PROTECTION FOR STEEL PILES DETAIL W SY USA Inc. 434 FAYETTEVILLE STREET SUITE 1500 RALEIGH, NC 27601 TEL: 1.919.836.4040 LICENSE NO. F-0165 DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED PRELONUMARV PLAMB DO NOT USE FOR C OO f`iIn sTRUC TOOa PROJECT No. 17BP.14eRe176 HAYWOOD rniiNTY STATION: SHEET 4 OF 4 11+98a67 -L- STATE OF NORTH CAROLINA DEPARTMENT OF TRANSPORTATION RALEIGH SUBSTRUCTURE END BENT 1 DETAILS REVISIONS BY: I DATE: I N0. BY: I DATE: SHEET NO. S-16 TOTAL SHEETS 22 6/19/2018 J:\188360C - 2015 W Divisions Planning & Design On- Call\I188360C Group 3 Bridges\17BP.R176.430276\Structures\Drafting\DGN's\401-031-17BP.14.R.176-SMU-EB104.dgn F1 NOTES 0 c w �LL_ LQ U EL. 2970.( EL. 296( BOTTOM C & WII C HP 12 X 53 i PLAN 0.0373 (SLOPE ELEVATION r�0 m 'OUR #2 'ER PART WINGS POUR # 1 'AP, LOWER F OF WINGS & :RETE COLLARS Qo 0-) STIRRUPS IN CAP MAY BE SHIFTED AS NECESSARY TO ANCHOR BOLTS. THE CONCRETE IN THE SHADED AREA OF THE WING SHALL BE POURED AFTER THE VERTICAL CONCRETE BARRIER RAIL IS CAST IF SLIP FORMING IS USED. FOR PILE SPLICE DETAILS,SEE SHEET 3 OF 3.1 FOR WING DETAILS, SEE SHEET 2 OF 3. ANCHOR BOLTS SHALL MEET THE REQUIREMENTS OF ASTM A449 AND SHALL BE GALVANIZED. NO SEPARATE PAYMENT WILL BE MADE FOR THE ANCHOR BOLTS AND THE COST OF MATERIALS AND INSTALLATION SHALL BE INCLUDED IN OTHER PAY ITEMS. TOP OF PILE ELEVATIONS O2967.95 O2967.64 O2967.32 O2967.00 O2966.68 PROJECT No. 17BPc14cRc176 HAYWOOD rniiNTY STATION: SHEET 1 OF 3 11+98a67 —L— WINGS NOT SHOWN FOR CLARITY. FOR SECTION A -A, SEE SHEET 3 OF 3. CONCRETE COLLARS FOR STEEL PILES NOT SHOWN IN PLAN AND ELEVATION VIEWS FOR CLARITY. SEE "CORROSION PROTECTION FOR STEEL PILES DETAIL", SHEET 3 OF 3. 6/19/2018 J:\188360C - 2015 W Divisions Planning & Design On- Call\I188360C Group 3 Bridges\17BP.R176.430276\Structures\Drafting\DGN's\401-033-17BP.14.R.176-SMU-EB201.dgn STD. NO. EB_27_6OS4 #4 K1 N # O n 3" 1 2'-01/4„ I 91_01, PLAN OF WING(W1 (LA. F AUL) PLAN OF WINGI #4 V1 BARS (EA. FACE) 3" 3" #4 V1 BARS (EA. FACE) ELEVATION OF WING(W1 EL.2966.05 (LEVEL) WING DETAILS ELEVATION OF WING M2 2,_0114„ E) E a LL a LL rr Q # 9 2,,CL. 2,,CL. V) a I- C� U N 00 rn W W L U U Q a L J Y J U LL CO = N 2 V # # C° 'O N ,� a I- '� a_ U (n 00 Ln T 1T1f7-1 �"1 -#4 V1 FILL FACE CONST. JT. 3"HIGH B.B. SECTION X—X 1,_0„ #4 V1 ONST. JT. J nlun o.o. SECT ION Y—Y PROJECT No. 17BPc14cRc176 HAYWOOD rniiNTY STATION: SHEET 2 OF 3 11+98a67 —L— 6/19/2018 J:\188360C - 2015 W Divisions Planning & Design On- Call\I188360C Group 3 Bridges\17BP.R176.430276\Structures\Drafting\DGN's\401-035-17BP.14.R.176-SMU-EB202.dgn STD. NO. EB_27_6OS4 MINIMUM OF 3- ONE CUBIC FOOT BAGS OF #78M STONE. BAGS SHALL BE OF POROUS- FABRIC,SECURELY TIED. GRADE TO DRAIN TOE OF SLOPE 6" ( MIN.) PIPE FOR DRAINAGE 1-#4 B2 EA. FACE BAGGED STONE AND PIPE SHALL BE PLACED IMMEDIATELY AFTER COMPLETION OF END BENT EXCAVATION. PIPE MAY BE EITHER CONCRETE, CORRUGATED STEEL, CORRUGATED ALUMINUM ALLOY, OR CORRUGATED PLASTIC. PERFORATED PIPE WILL NOT BE ALLOWED. BAGGED STONE SHALL REMAIN IN PLACE UNTIL THE ENGINEER DIRECTS THAT IT BE REMOVED. THE CONTRACTOR SHALL REMOVE AND DISPOSE OF SILT ACCUMULATIONS AT BAGGED STONE WHEN SO DIRECTED BY THE ENGINEER. BAGS SHALL BE REMOVED AND REPLACED WHENEVER THE ENGINEER DETER- MINES THAT THEY HAVE DETERIORATED AND LOST THEIR EFFECTIVENESS. NO SEPARATE PAYMENT WILL BE MADE FOR THIS WORK AND THE ENTIRE COST OF THIS WORK SHALL BE INCLUDED IN THE UNIT CONTRACT PRICE BID FOR THE SEVERAL PAY ITEMS. TEMPORARY DRAINAGE AT END BENT (TYP.) CORED SLAB UNIT MUM DETAIL "A" 8"X 2,_6" DMERIC BRG. YPE I) (TYP.) ti BEARING CONCRETE r ; COLLAR ,'% PILES & CONCRETE COLLARS •-__- FILL FACE 2'-0" 0 CONCRETE COLLAR (TYP. EACH PILE) PLAN HP 12 X 53 STEEL PILE ELEVATION 1'-0" 11" 10" SECTION A -A (CONCRETE COLLAR NOT SHOWN FOR CLARITY. SEE "CORROSION PROTECTION FOR STEEL PILES DETAIL.") BOTTOM OF CAP CORROSION PROTECTION FOR STEEL PILES DETAIL DESIGNED BY: S. NATARAJAN DATE : APR 2017 DRAWN BY: M.J.OSTRISHKO DATE : APR 2017 CHECKED BY: N.A. PIERCE. DATE : APR 20107 DESIGN ENGINEER DRAWN BY WJH 12111 OF RECORD: - DATE : - CHECKED BY : AAC 12/11 BACK GOUGE DETAIL B BACK GOUGE DETAIL A V PILE HORIZONTAL PILE VERTICAL 0 0o x o 0", TO I/s„ 0 0 OR VERTICAL 600 +10 0 -0 lAri z 0" T O I/s'" DETAIL -A 0 0 DETAIL B POSITION OF PILE DURING WELDING. PILE SPLICE DETAILS BAR TYPES No 4" HK. 1 HK. 1' 3 37' - - O "" -8 "" 1' 3" 4 ", 9'-1" H1 3 C9_ 8 -8 H2 O Y 2 8"_2„ H3 4 I/2," 2, _ 5 ", 4 I/2," HK. HK. 5 O /-1'-3" LAP 2'-5" 1'-8" 0 ALL BAR DIMENSIONS ARE OUT TO OUT. END BENT 2 HP 12 X 53 STEEL PILES N0: 5 LIN. FT. = 175 STEEL PILE POINTS NO:5 W SY USA Inc. 434 FAYETTEVILLE STREET SUITE 1500 RALEIGH, NC 27601 TEL: 1.919.836.4040 LICENSE NO. F-0165 BILL OF MATERIAL FOR END BENT 2 BAR NO. SIZE TYPE LENGTH WEIGHT B1 8 #9 1 40'-2" 1093 B2 28 #4 STIR 20'-2" 377 B3 10 #4 STIR 2'-5" 16 H1 10 #4 2 9'-9" 65 H2 10 #4 2 9'-4" 62 H3 20 #4 3 8'-10" 118 K1 1 16 1 #4 1 STIR 1 3'-3" 1 35 1 S1 52 #4 1 4 1 10'-5" 362 S2 52 #4 5 3'-2" 110 S3 20 #4 6 6'-6" 87 V1 1 53 1 #4 1 STR 1 6'-2" 1 218 1 REINFORCING STEEL (FOR END BENT 2) 2543 LBS. CLASS A CONCRETE BREAKDOWN (FOR END BENT 2) POUR #1 CAP, LOWER PART 18.7 C.Y. OF WINGS & COLLARS POUR #2 UPPER PART OF 2.2 C.Y. WINGS TOTAL CLASS A CONCRETE 20.9 C.Y. 1 PROJECT No. 17BP.14eRe176 HAYWOOD COUNTY STATION: SHEET 3 OF 3 11+98.67 -L- STATE OF NORTH CAROLINA DEPARTMENT OF TRANSPORTATION RALEIGH DOCUMENT NOT CONSIDERED FINAL SUBSTRUCTURE UNLESS ALL SIGNATURES COMPLETED END BENT 2 DETAILS PRIELONON&RV PLb%H3 DO moo USE FOR C OO f`iIn sTRUC4UOa REVISIONS BY: I DATE: 1NO.1 BY: I DATE: SHEET NO. S-19 TOTAL SHEETS 22 6/19/2018 J:\188360C - 2015 W Divisions Planning & Design On- Call\I188360C Group 3 Bridges\17BP.R176.430276\Structures\Drafting\DGN's\401-037-17BP.14.R.176-SMU-EB203.dgn F1 STD. NO. EB_27_6OS4 TO SR 1130 Q0 v SHOULDER LINE n F— SHOULDER LINE W.P. #1 C BRIDGE STA. = 11+98.67-L- RIP RAP CLASS II (TYP.) S�OQ PtiN AS MR . 5'-0" (TYP.) END BENT 1 EL.2968.78 (LEFT) EL.2967.36 (RIGHT) END BENT 2 ---- EL. 2967.02 (LEFT) O ' EL.2965.60 (RIGHT) GROUND LINE GEOTEXTILE 0 M SECTION H-H -L- RIP RAP CLASS B (TYP.) PLAN 60 °-00'-00" (TYP.) SHOULDER LINE W.P. #2 EXTENDED TANGENT -DR1- POC STA.12+61.48-L- POT STA.10+00.00-DR1- `-PC STA. 12+29.43-L- Tp SR llp 3 �C :]N c SHOULDER LINE END BENT 1 EL.2973.95 (LEFT) EL.2972.53 (RIGHT) END BENT 2 EL.2972.18 (LEFT) EL. 2970.71 (RIGHT) W I N G W A L L SLOPE 2:1 (RIGHT) (TYP. AT END BENT 1 & END BENT 2) SLOPE TO DRAIN (LEFT) (TYP. AT END BENT 1 & END BENT 2) GEOTEXTILE SECT ION C-C `O r ESTIMATED QUANTITIES BRIDGE RIP RAP RIP RAP RIP RAP GEOTEXTILE STA.11+98.67 -L- CLASS B CLASS II CLASS II FORR DRAINAGE GE (2'-0" THICK) (2'-0" THICK) (3'-0" THICK) TONS TONS TONS SQUARE YARDS END BENT 1 11 18 29 53 END BENT 2 - 16 29 39 GROUND LINE PROJECT No. 17BPc14cRc176 HAYWOOD COUNTY STATION: 11+98a67 —L— 6/19/2018 J:\188360C - 2015 W Divisions Planning & Design On- Call\I188360C Group 3 Bridges\176P.R176.430276\Structures\Drafting\DGN's\401-039-17BP.14.R.176-SMU-RROI.dgn NOTES w c� a v, BEGIN 9--- mm SLAB rn ~ m a m Q J N J V) LL- O H O � w 0 a0 � � O a N II m V) i N U z cD ~ U m N In # m �Q0 N i 01 N l'-3" 11-1*4 Al (a) 1'-0"CTS. 9" (TOP OF SLAB) 1'-3" 11-1*4 A2 (q) l'-O" CTS. 9" (BOTTOM OF SLAB) 3" #4 Al OR #4 A2 TO PROJECT A MIN. 2'-2" INTO STAGE II W.P. #1 -L- IF$i0 9" 11-1*4 Al (c) l'-O" CTS. 1'-3" (TOP OF SLAB) 9" 11-#4 A2 Q 1'-0"CTS. (BOTTOM OF SLAB) 3" 3" `�♦ W.P. a ♦ ZTEMPORARY GUARDRAIL �♦ 600-00'-00" 9 ANCHOR ASSEMBLY (TYP.) (TYP.) (FOR LOCATIONS SEE SHEET 5-11) �♦ ♦ FILL FACE (a) ��♦ (BOTT40F END BENT 1 `�` '*4A2 OR SLAB) #4A1 (TOP OF SLAB) ` o� Ni � H �} N PLAN Cad END BENT 1 51/4" CONTINUOUS PROPOSED HIGH CHAIR UPPER (CHCU) ASPHALT Q 3'-0"CTS. ACROSS SLAB PAVEMENT I (V 0OF A- A. a -----w— IROADWAY \"* #6B2 Q APPROVED WIRE BAR SUPPORTS (Z 3'-O" CTS. APPROXIMATE--' 1: 1 SLOPE (TO BE DETERMINED BY THE CONTRACTOR) t NORMAL TO END BENT 4"0 PERFORATED H E 4 #4A1 U N #4 Al OR 1*4 A2 TO PROJECT A MIN. 2'-2" INTO STAGE II �♦ w w w 3" 9„ ♦ 60 °-00'-00" ` (TYP.) ♦ �♦ FILL FACE Q �,.--END BENT 2 ♦ ♦ ♦ #4A1 OR `♦ #4A1 #4A2 `� (TOP OF ♦ SLAB) ♦ N N END APPROACH SLAB #4A2 (BOTT. OF SLAB) PLAN END BENT 2 f���,�d����iL���I�T►9� � - �1��iLl��il:1•:Ie� �`�u�LI�•�1:L� t2 : 1 SLOPE L T SELEC MATERIAL (CLASS V OR CLASS VI)-7 GEOTEXTILE 3'-0" SECTION THRU SLAB (TYPE II - MODIFIED APPROACH FILL) rn m J Q N J V) L.L. O :2 O CL O ~ O m ~ V) U �- m N In m # N a1 i N FOR BRIDGE APPROACH FILL INCLUDING GEOTEXTILE, 4"0 DRAINAGE PIPE, AND SELECT MATERIAL BACKFILL, SEE ROADWAY PLANS. GEOTEXTILE SHALL BE TYPE 1 IN ACCORDANCE WITH THE STANDARD SPECIFICATIONS SECTION 1056. SELECT MATERIAL BACKFILL (CLASS V OR CLASS VI)SHALL BE IN ACCORDANCE WITH STANDARD SPECIFICATIONS SECTION 1016. SELECT MATERIAL BACKFILL IS TO BE CONTINUOUS ALONG FILL FACE OF BACKWALL FROM OUTSIDE EDGE TO OUTSIDE EDGE OF APPROACH SLAB. FOR THE 4"0 DRAINAGE PIPE OUTLET(S),SEE ROADWAY STANDARD DRAWINGS. AREA BETWEEN THE WINGWALL AND APPROACH SLAB SHALL BE GRADED TO DRAIN THE WATER AWAY FROM THE FILL FACE OF THE BRIDGE AND SHALL BE PAVED.SEE ROADWAY PLANS. APPROACH SLAB GROOVING IS NOT REQUIRED. SECTION N-N R CLASS "B" STONE FOR EROSION CONTROL ---------- --------- TEMP. SLOPE DRAIN 2'-0"MIN. 1'-0" EARTH 4-1 MIN. FUTURE DITCH S _ SHOULDER BLOCK I I I I I I APPROACH I I 3'-11/2„ END OF CURB WITHOUT SHOULDER BERM GUTTER CURB DETAILS TEMPORARY SLOPE DRAIN ELBOW TOE OF FILL CLASS "B" STONE FOR EROSION CONTROL SLAB 7 OSECTION R-R Z H R PZNN H :2 000, P� z pP�P S �--� �, 12"MIN. R4J c� FLOW LINE END OF EROSION RESISTANT MATERIAL —ram APPROACH SLAB 1'-6"MIN. CORED NOTE: IMMEDIATELY AFTER THE CONSTRUCTION OF THE APPROACH SLAB SLAB THE CONTRACTOR SHALL PROVIDE TEMPORARY BERM AND SLOPE t V-1�/2" DRAIN. CONTRACTOR SHALL GRADE TO PIPE INLET AND PROVIDE EROSION RESISTANT MATERIAL AS SHOWN. THE EROSION RESISTANT MATERIAL SHALL BE EITHER 1)ASPHALT PLANT MIX, TYPE 1 OR TYPE 2, MIN. 2" DEPTH, 2) EROSION CONTROL 1'/2" BACKER ROD MAT, OR 3) CONCRETE, AS DIRECTED BY THE ENGINEER. THE SLOPE DRAIN SHALL CONSIST OF A NON -PERFORATED 2 LAYERS OF 30 LB. TEMPORARY DRAINAGE PIPE,12 INCHES IN DIAMETER. ROOFING FELT TO PREVENT BOND I PLAN VIEW �IM f URB BRIDGE DECK CAP FLOW LINE ONLY WITH EROSION RESISTANT MATERIAL BACKFILL EXCAVATION HOLE AND GRADE TO DRAIN NOTE: IF THE APPROACH SLAB IS NOT CONSTRUCTED IMMEDIATELY AFTER THE BACKFILLING OF THE END BENT EXCAVATION, GRADE TO DRAIN TO THE BOTTOM OF THE SLOPE AND PROVIDE EROSION RESISTANT MATERIAL, SUCH AS FIBERGLASS ROVING OR AS DIRECTED BY THE ENGINEER TO PREVENT SOIL EROSION AND TO PROTECT THE AREA ADJACENT TO THE STRUCTURE. THE CONTRACTOR WILL BE REQUIRED TO REMOVE THESE MATERIALS PRIOR TO CONSTRUCTION OF THE APPROACH SLAB. TEMPORARY DRAINAGE DETAIL 3"EROSION RESISTANT MATERIAL OVER PIPE EARTH DITCH BLOCK N T— -------- 4'-0" MIN. FILL SLOPE SECTION S-S TEMPORARY BERM AND SLOPE DRAIN DETAILS (TO BE USED WHEN SHOULDER BERM GUTTER IS REOUIRED) SPLICE LENGTHS BAR SIZE EPDXY COATED UNCOATED #q 2,-0„ 1' 9" #5 2'-6„ 2'-211 #6 1 31-10" 2'-7" PROJECT No. 17BP.14eRe176 HAYWOOD COUNTY STATION: 11+98a67 —L— 6/19/2018 J:\188360C - 2015 W Divisions Planning & Design On- Call\I188360C Group 3 Bridges\17BP.R176.430276\Structures\Drafting\DGN's\401-041-17BP.14.R.176-SMU-ASOI.dgn 1 9' - O'• 191 - O'• NOTES h-I W 0 Q F- IN h-1 w a N V- 3" 11-1*4 Al (4) 1'-0" CTS. 9" V- 3" (TOP OF SLAB) 11-n4 A2 (a) 1'-0"CTS. 9" (BOTTOM OF SLAB) N -41 3" 9" 11-#4 Al Q 1'-0"CTS. 1'-3" 9" (TOP OF SLAB) 11-1*4 A2 (a) 1'-O" CTS. 1'-3" 3" (BOTTOM OF SLAB) N -41 ` mQ a J o� 3 N-*j �♦ �` N 4J L.L. 0 �♦ ` - O ~ O m ♦ ♦♦ ♦♦ `♦� ' U U FILL FACE C�-`♦ FILL FACE e r. Z END BENT 1 n4A1 OR ♦� END BENT 2 `a `O '' ♦♦ tt 4 A 2 x♦ m N m #4A1` 1*4A1 OR �♦♦ Qo l4A2 (TOP OF `♦♦ #4A2 (BOTT. OF SLAB) ♦` `♦ N cv SLAB) ♦ �♦ ` W.P. #1 ♦ ♦ CONST. JT. BEGIN APPROACH SLAB �♦ �♦ �♦ 3" `9„ #4A2 (BOTT. OF SLAB) 4 (TOP OF SLAB) , CONST. JT. ♦ W.P. #2 60 °-00'-00" �♦ �♦ �♦ (TYP.) 600-00'-00" (TYP.) In om a Q J J N N O F- O ~ O F- Co N F— F- U U is m N m Qo tt M � N N j END APPROACH SLAB FOR BRIDGE APPROACH FILL INCLUDING GEOTEXTILE, 4"0 DRAINAGE PIPE, AND SELECT MATERIAL BACKFILL, SEE ROADWAY PLANS. GEOTEXTILE SHALL BE TYPE 1 IN ACCORDANCE WITH THE STANDARD SPECIFICATIONS SECTION 1056. SELECT MATERIAL BACKFILL (CLASS V OR CLASS VI)SHALL BE IN ACCORDANCE WITH STANDARD SPECIFICATIONS SECTION 1016. SELECT MATERIAL BACKFILL IS TO BE CONTINUOUS ALONG FILL FACE OF BACKWALL FROM OUTSIDE EDGE TO OUTSIDE EDGE OF APPROACH SLAB. FOR THE 4"0 DRAINAGE PIPE OUTLET(S),SEE ROADWAY STANDARD DRAWINGS. AREA BETWEEN THE WINGWALL AND APPROACH SLAB SHALL BE GRADED TO DRAIN THE WATER AWAY FROM THE FILL FACE OF THE BRIDGE AND SHALL BE PAVED.SEE ROADWAY PLANS. APPROACH SLAB GROOVING IS NOT REQUIRED. 8„ N Q SECTION N-N 3'-11/2„ END OF CURB WITHOUT SHOULDER BERM GUTTER CURB DETAILS BRIDGE DECK 5 PLAN END BENT 1 PLAN (q-) END BENT 2 GAP p�� DIMENSIONS SHOWN ARE TYPICAL FOR BOTH APPROACH SLABS �p g 51/4" CONTINUOUS PROPOSED HIGH CHAIR UPPER (CHCU) ASPHALT Q 3'-0"CTS. ACROSS SLAB PAVEMENT ' IA #561 N I (V f I \ -.1 00F I A 1 " ROADWAY \'-* #6B2 Q APPROVED WIRE BAR SUPPORTS (a) 3'-O" CTS. APPROXIMATE--' 1: 1 SLOPE (TO BE DETERMINED BY THE CONTRACTOR) t NORMAL TO END BENT 4"0 PERFORATED H 4 n4A1 U N t2 : 1 SLOPE LSELECT MATERIAL (CLASS V OR CLASS VI)-7 GEOTEXTILE 3'-0" SECTION THRU SLAB R CLASS "B" STONE FOR EROSION CONTROL -- - - - - - - ----- - - - - - - TEMP. SLOPE DRAIN 2'-0"MIN. 1'-0" EARTHMIN. FUTURE DITCH S _ SHOULDER BLOCK I I I I I I APPROACH I I SLAB � z R PZN �c\, H � p NLO� :2 0 , o z G pP PSP� S iv R4J FLOW LINE END OF EROSION RESISTANT MATERIAL APPROACH SLAB 1'-6"MIN. CORED NOTE: IMMEDIATELY AFTER THE CONSTRUCTION OF THE APPROACH SLAB SLAB THE CONTRACTOR SHALL PROVIDE TEMPORARY BERM AND SLOPE t V-1�/2" DRAIN. CONTRACTOR SHALL GRADE TO PIPE INLET AND PROVIDE EROSION RESISTANT MATERIAL AS SHOWN. THE EROSION RESISTANT MATERIAL SHALL BE EITHER 1)ASPHALT PLANT MIX, TYPE 1 OR TYPE 2, MIN. 2" DEPTH, 2) EROSION CONTROL V— 1'/2" BACKER ROD MAT, OR 3) CONCRETE, AS DIRECTED BY THE ENGINEER. THE SLOPE DRAIN SHALL CONSIST OF A NON -PERFORATED 2 LAYERS OF 30 LB. TEMPORARY DRAINAGE PIPE,12 INCHES IN DIAMETER. ROOFING FELT TO PREVENT BOND PLAN VIEW CIS w ELBOW TEMPORARY SLOPE DRAIN 4'-0" ELBOW TOE OF FILL• CLASS "B" STONE —7 FOR EROSION CONTROL SECTION R-R —'' LZN� F �0`N CAP FLOW LINE ONLY WITH \ EROSION RESISTANT MATERIAL BACKFILL EXCAVATION HOLE AND GRADE TO DRAIN NOTE: IF THE APPROACH SLAB IS NOT CONSTRUCTED IMMEDIATELY AFTER THE BACKFILLING OF THE END BENT EXCAVATION, GRADE TO DRAIN TO THE BOTTOM OF THE SLOPE AND PROVIDE EROSION RESISTANT MATERIAL, SUCH AS FIBERGLASS ROVING OR AS DIRECTED BY THE ENGINEER TO PREVENT SOIL EROSION AND TO PROTECT THE AREA ADJACENT TO THE STRUCTURE. THE CONTRACTOR WILL BE REQUIRED TO REMOVE THESE MATERIALS PRIOR TO CONSTRUCTION OF THE APPROACH SLAB. TEMPORARY DRAINAGE DETAIL 3"EROSION RESISTANT 12" MIN. I MATERIAL OVER PIPE EARTH DITCH BLOCK N 4'-0" MIN. FILL SLOPE SECTION S-S TEMPORARY BERM AND SLOPE DRAIN DETAILS (TO BE USED WHEN SHOULDER BERM GUTTER IS REQUIRED) SPLICE LENGTHS BAR SIZE EPDXY COATED UNCOATED # q 2"-0" 1 `9„ #5 21-6„ -211 21 #6 1 31-10" 2'-7" PROJECT No. 17BPc14cRc176_ HAYWOOD rniiNTY STATION: 11+98a67 —L— 6/19/2018 J:\188360C - 2015 W Divisions Planning & Design On- Call\I188360C Group 3 Bridges\17BP.R176.430276\Structures\Drafting\DGN's\401-043-17BP.14.R.176-SMU-AS02.dgn DESIGN DATA-. SPECIFICATIONS - - - - - - - - - - - - - - - - - A.A.S.H.T.O. (CURRENT) LIVE LOAD - - - - - - - - - - - - - - - - - - - - SEE PLANS IMPACT ALLOWANCE - - - - - - - - - - - - - - - - SEE A.A.S.H.T.O. STRESS IN EXTREME FIBER OF STRUCTURAL STEEL - AASHTO M270 GRADE 36 - - 20,000 LBS. PER SO. IN. - AASHTO M270 GRADE 50W - - 27,000 LBS. PER SO. IN. - AASHTO M270 GRADE 50 - - 27,000 LBS. PER SO. IN. REINFORCING STEEL IN TENSION - GRADE 60 - - - CONCRETE IN COMPRESSION - - - - - - - - - - - - CONCRETE IN SHEAR - - - - - - - - - - - - - - - - STRUCTURAL TIMBER - TREATED OR UNTREATED EXTREME FIBER STRESS - -- COMPRESSION PERPENDICULAR TO GRAIN OF TIMBER - - - - - EQUIVALENT FLUID PRESSURE OF EARTH - - - - - MATERIAL AND WORKMANSHIP-. 24,000 LBS. PER SO. IN. 1,200 LBS. PER SO.IN. SEE A.A.S.H.T.O. 1,800 LBS. PER SO.IN. 375 LBS. PER SO. IN. 30 LBS. PER CU. FT. (MINIMUM) EXCEPT AS MAY OTHERWISE BE SPECIFIED ON PLANS OR IN THE SPECIAL PROVISIONS, ALL MATERIAL AND WORKMANSHIP SHALL BE IN ACCORDANCE WITH THE 2018 "STANDARD SPECIFICATIONS FOR ROADS AND STRUCTURES"OF THE N.C.DEPARTMENT OF TRANSPORTATION. STEEL SHEET PILING FOR PERMANENT OR TEMPORARY APPLICATIONS SHALL BE HOT ROLLED. CONCRETE-. UNLESS OTHERWISE REQUIRED ON PLANS,CLASS A CONCRETE SHALL BE USED FOR ALL PORTIONS OF ALL STRUCTURES WITH THE EXCEPTION THAT: CLASS AA CONCRETE SHALL BE USED IN BRIDGE SUPERSTRUCTURES, ABUTMENT BACKWALLS, AND APPROACH SLABS; AND CLASS B CONCRETE SHALL BE USED FOR SLOPE PROTECTION AND RIP RAP. CONCRETE CHAMFERS-. UNLESS OTHERWISE NOTED ON THE PLANS,ALL EXPOSED CORNERS ON STRUCTURES SHALL BE CHAMFERED 3/4"WITH THE FOLLOWING EXCEPTIONS: TOP CORNERS OF CURBS MAY BE ROUNDED TO 11/2"RADIUS WHICH IS BUILT INTO CURB FORMS; CORNERS OF TRANSVERSE FLOOR EXPANSION JOINTS SHALL BE ROUNDED WITH A 1/4"FINISHING TOOL UNLESS OTHERWISE REQUIRED ON PLANS;AND CORNERS OF EXPANSION JOINTS IN THE ROADWAY FACES AND TOPS OF CURBS AND SIDEWALKS SHALL BE ROUNDED TO A 1/4"RADIUS WITH A FINISHING STONE OR TOOL UNLESS OTHERWISE REQUIRED ON PLANS. DOWELS -.- DOWELS WHEN INDICATED ON PLANS AS FOR CULVERT EXTENSIONS,SHALL BE EMBEDDED AT LEAST 12"INTO THE OLD CONCRETE AND GROUTED INTO PLACE WITH 1:2 CEMENT MORTAR. STANDARD NOTES ALLOWANCE FOR DEAD LOAD DEFLECTIONS SETTLEMENT, ETC.IN CASTING SUPERSTRUCTURES. - BRIDGES SHALL BE BUILT ON THE GRADE OR VERTICAL CURVE SHOWN ON PLANS. SLABS, CURBS AND PARAPETS SHALL CONFORM TO THE GRADE OR CURVE. ALL DIMENSIONS WHICH ARE GIVEN IN SECTION AND ARE AFFECTED BY DEAD LOAD DEFLECTIONS ARE DIMENSIONS AT CENTER LINE OF BEARING UNLESS OTHERWISE NOTED ON PLANS. IN SETTING FORMS FOR STEEL BEAM BRIDGES AND PRESTRESSED CONCRETE GIRDER BRIDGES, ADJUSTMENTS SHALL BE MADE DUE TO THE DEAD LOAD DEFLECTIONS FOR THE ELEVATIONS SHOWN. WHERE BLOCKS ARE SHOWN OVER BEAMS FOR BUILDING UP TO THE SLAB, THE VERTICAL DIMENSIONS OF THE BLOCKS SHALL BE ADJUSTED BETWEEN BEARINGS TO COMPENSATE FOR DEAD LOAD DEFLECTIONS, VERTICAL CURVE ORDINATE, AND ACTUAL BEAM CAMBER. WHERE BOTTOM OF SLAB IS IN LINE WITH BOTTOM OF TOP FLANGES, DEPTH OF SLAB BETWEEN BEARINGS SHALL BE ADJUSTED TO COMPENSATE FOR DEAD LOAD DEFLECTION,VERTICAL CURVE ORDINATE,AND ACTUAL BEAM CAMBER. IN SETTING FALSEWORK AND FORMS FOR REINFORCED CONCRETE SPANS, AN ALLOWANCE SHALL BE MADE FOR DEAD LOAD DEFLECTIONS, SETTLEMENT OF FALSEWORK, AND PERMANENT CAMBER WHICH SHALL BE PROVIDED FOR IN ADDITION TO THE ELEVATIONS SHOWN. AFTER REMOVAL OF THE FALSEWORK, THE FINISHED STRUCTURES SHALL CONFORM TO THE PROFILE AND ELEVATIONS SHOWN ON THE PLANS AND CONSTRUCTION ELEVATIONS FURNISHED BY THE ENGINEER. DETAILED DRAWINGS FOR FALSEWORK OR FORMS FOR BRIDGE SUPERSTRUCTURE AND ANY STRUCTURE OR PARTS OF A STRUCTURE AS NOTED ON THE PLANS SHALL BE SUBMITTED TO THE ENGINEER FOR APPROVAL BEFORE CONSTRUCTION OF THE FALSEWORK OR FORMS IS STARTED. REINFORCING STEEL-. ALL REINFORCING STEEL SHALL BE DEFORMED. DIMENSIONS RELATIVE TO PLACEMENT OF REINFORCING ARE TO CENTERS OF BARS UNLESS OTHERWISE INDICATED IN THE PLANS. DIMENSIONS ON BAR DETAILS ARE TO CENTERS OF BARS OR ARE OUT TO OUT AS INDICATED ON PLANS. WIRE BAR SUPPORTS SHALL BE PROVIDED FOR REINFORCING STEEL WHERE INDICATED ON THE PLANS. WHEN BAR SUPPORT PIECES ARE PLACED IN CONTINUOUS LINES, THEY SHALL BE SO PLACED THAT THE ENDS OF THE SUPPORTING WIRES SHALL BE LAPPED TO LOCK LEGS ON ADJOINING PIECES. STRUCTURAL STEEL-. AT THE CONTRACTOR'S OPTION, HE MAY SUBSTITUTE 7/8"O SHEAR STUDS FOR THE 3/4"0 STUDS SPECIFIED ON THE PLANS. THIS SUBSTITUTION SHALL BE MADE AT THE RATE OF 3 - 7/8" 0 STUDS FOR 4 - %4" 0 STUDS, AND STUD SPACING CHANGES SHALL BE MADE AS NECESSARY TO PROVIDE THE SAME EQUIVALENT NUMBER OF 7/8"O STUDS ALONG THE BEAM AS SHOWN FOR %4" O STUDS BASED ON THE RATIO OF 3 - 7/8" O STUDS FOR 4 - %4"0 STUDS. STUDS OF THE LENGTH SPECIFIED ON THE PLANS MUST BE PROVIDED. THE MAXIMUM SPACING SHALL BE 2'-0". EXCEPT AT THE INTERIOR SUPPORTS OF CONTINUOUS BEAMS WHERE THE COVER PLATE IS IN CONTACT WITH BEARING PLATE, THE CONTRACTOR MAY, AT HIS OPTION, SUBSTITUTE FOR THE COVER PLATES DESIGNATED ON THE PLANS COVER PLATES OF THE EQUIVALENT AREA PROVIDED THESE PLATES ARE AT LEAST 5/6"IN THICKNESS AND DO NOT EXCEED A WIDTH EQUAL TO THE FLANGE WIDTH LESS 2"OR A THICKNESS EQUAL TO 2 TIMES THE FLANGE THICKNESS. THE SIZE OF FILLET WELDS SHALL CONFORM TO THE REQUIREMENTS OF THE CURRENT ANSI/AASHTO/AWS "BRIDGE WELDING CODE". ELECTROSLAG WELDING WILL NOT BE PERMITTED. WITH THE SOLE EXCEPTION OF EDGES AT SURFACES WHICH BEAR ON OTHER SURFACES,ALL SHARP EDGES AND ENDS OF SHAPES AND PLATES SHALL BE SLIGHTLY ROUNDED BY SUITABLE MEANS TO A RADIUS OF APPROXIMATELY %16INCH OR EQUIVALENT FLAT SURFACE AT A SUITABLE ANGLE PRIOR TO PAINTING, GALVANIZING, OR METALLIZING. HANDRAILS AND POSTS-. METAL STANDARDS AND FACES OF THE CONCRETE END POSTS FOR THE METAL RAIL SHALL BE SET NORMAL TO THE GRADE OF THE CURB,UNLESS OTHERWISE SHOWN ON PLANS. THE METAL RAIL AND TOPS OF CONCRETE POSTS USED WITH THE ALUMINUM RAIL SHALL BE BUILT PARALLEL TO THE GRADE OF THE CURB. METAL HANDRAILS SHALL BE IN ACCORDANCE WITH THE PLANS. RAILS SHALL BE AS MANUFACTURED FOR BRIDGE RAILING. CASTINGS SHALL BE OF A UNIFORM APPEARANCE. FINS AND OTHER DEFORMATIONS RESULTING FROM CASTING OR OTHERWISE SHALL BE REMOVED IN A MANNER SO THAT A UNIFORM COLORING OF THE COMPLETED CASTING SHALL BE OBTAINED. CASTINGS WITH DISCOLORATIONS OR OF NON -UNIFORM COLORING WILL NOT BE ACCEPTED.CERTIFIED MILL REPORTS ARE REQUIRED FOR METAL RAILS AND POSTS. SPECIAL NOTES-. GENERALLY, IN CASE OF DISCREPANCY, THIS STANDARD SHEET OF NOTES SHALL GOVERN OVER THE SPECIFICATIONS, BUT THE REMAINDER OF THE PLANS SHALL GOVERN OVER NOTES HEREON, AND SPECIAL PROVISIONS SHALL GOVERN OVER ALL. SEE SPECIFICATIONS ARTICLE 105-4. ENGLISH REV. 6-16-95 EEM (✓) RGW REV. 5-7-03 RWW GO JTE REV. 10-1-11 MAA (✓) GM 6/19/2018 REV. 8-16-99 RWW (✓) LES REV. 5-1-06 TLA (✓) GM REV. 12-17 MAA (4) THC$$$$$$$$$$$$$$$$$$$$$$$DGN$$$$$$$$$$$$$$$$$$$$$$$ HobbsM JANUARY9 1990 STD. NO. SN