HomeMy WebLinkAboutNCS000330_Email_20190404Garcia, Lauren V
From:
Mercer, Tyler <Tyler.Mercer@ATlmetals.com>
Sent:
Thursday, April 04, 2019 4:23 PM
To:
Garcia, Lauren V; Moore, James
Cc:
McManus, Mike; Ryan, Scott
Subject:
RE: [External] RE: [Attachment Warning!!!] [EXTERNAL EMAIL]: NCS000329 and
NCS000330 Permit Renewal/Updated Information
External email. Do not click links or open attachments unless you verify. Send all suspicious email as an attachment to
report.spam@nc.gov
Lauren,
Thank you for the quick response in getting these drafts sent to us! There are a few comments I have, but really
nothing major. Looks like a few of my comment may be due to the Draft coming from a standard template used before
issuing the actual permit for all permitted facilities. Below are my comments for Permit No. NCS000330.
• On the cover page it lists our facility as one that is engaged in "research and development, manufacturing and
packaging of herbicides, algaecides, etc." Our facility SIC code in regards to this Permit is 3341. Which is
manufacturer of nickel based -based and titanium -based alloys, etc...
• The topography map on page 2 lists "ATI Allvac" as the facility name. I will put in the request next week, but the
facility is currently known as ATI Specialty Materials -Monroe Plant.
• Can we have the Period Monitoring Schedule on page 9 changed to match the facility inspection schedule
mentioned on page 5? Was looking to have both schedules running From January to June and July to December
for both monitoring and facility inspections if possible?
• There is a slight discrepancy on record retention on page 14 it lists retention requirement as 3 years and on page
21 it states 5 year retention. We have always been required to keep 5 years so we are going to meet the
requirement whichever way you plan to go, but just wanted some clarification on which one is the requirement
for the new permit.
Any feedback is greatly appreciated. I will send the comments for the Bakers Permit #NCS000329 next week.
Thanks again,
-OA1 I
Specialty Materials
Tyler Mercer
Coordinator -Environmental Health & Safety
ATI Specialty Materials
2020 Ashcraft Avenue
Monroe, NC 28110
ATImetals.com
T: 704-289-4511 Ext. 3823
C: 704-290-6427
From: Garcia, Lauren V <lauren.garcia@ncdenr.gov>
Sent: Monday, April 01, 2019 10:21 AM
To: Mercer, Tyler <Tyler.Mercer@ATlmetals.com>; Moore, James <james.moore@ncdenr.gov>
Cc: Hinkle, Joe <Joe.Hinkle@ATlmetals.com>; McManus, Mike <Mike.McManus@ATlmetals.com>
Subject: RE: [External] RE: [Attachment Warning!!!] [EXTERNAL EMAIL]: NCS000329 and NCS000330 Permit
Renewal/Updated Information
Hey Tyler,
Thank you for sending me the monitoring data! Here are your draft permits for the NCS000329 and NCS000330 facilities.
Our permit template has been updated and a list of the changes is included in a cover letter in the attachment. Besides a
few updates to impaired water parameters, the basic information is the same; the template will just look different
compared to your old permit. Starting today (4/1/19), you will have a comment period of 30 days and I will be able to
answer questions and address any concerns.
The permit draft will also be sent to the Mooresville Regional Office Stormwater Contact, who will be giving me their
comments simultaneously. The draft will be going through a public notice process during the same 30 days (approx.).
The public notice process is expected to start next week. Once the public notice process ends, I will receive an affidavit.
By this time your and the MRO Contact's comments should have been addressed and the permit can be issued as soon
as I have the affidavit.
Let me know if you have any questions,
Lauren
From: Mercer, Tyler <TVIer.Mercer@ATlmetals.com>
Sent: Monday, April 01, 2019 8:07 AM
To: Garcia, Lauren V <lauren.garcia@ncdenr.gov>; Moore, James <james.moore@ncdenr.gov>
Cc: Hinkle, Joe <Joe.Hinkle@ATlmetals.com>; McManus, Mike <Mike.McManus@ATlmetals.com>
Subject: [External] RE: [Attachment Warning!!!] [EXTERNAL EMAIL]: NCS000329 and NCS000330 Permit
Renewal/Updated Information
External email. Do not click links or open attachments unless you verify. Send all suspicious email as an attachment to
report.spam@nc.gov
Lauren,
I confirmed with Joe that no changes have taken place that would affect either facility Stormwater Permits.
Also, confirmed the renewal packet is still current. Attached are the spreadsheets with the monitoring data you
requested. Please let me know if I can be of more assistance.
Thanks again,
-OA1 I
Specialty Materials
Tyler Mercer
Coordinator -Environmental Health & Safety
ATI Specialty Materials
2020 Ashcraft Avenue
Monroe, NC 28110
ATImetals.com
T: 704-289-4511 Ext. 3823
C: 704-290-6427
From: Garcia, Lauren V <lauren.garcia@ncdenr.gov>
Sent: Friday, March 29, 2019 9:03 AM
To: Hinkle, Joe <Joe.Hinkle@ATlmeta ls.com>
Subject: [Attachment Warning!!!] [EXTERNAL EMAIL]: NCS000329 and NCS000330 Permit Renewal/Updated Information
*** Attachment Warning ***
Please make certain you know the sender and were expecting the attachment, before attempting to open.
--------------------------------------------------------------------------------
--------------------------------------------------------------------------------
Hey Joe,
I am touching base with you again because I have not heard from you since our phone call.
I am working on renewing your individual stormwater permits (Permit No. NCS000329 and NCS000330). The permits are
drafted, but there is some information I am required to ask you for to (1.) confirm that the information I have is correct
and (2.) make sure the permit adequality serves the needs of the facility.
What I need from you:
• A spreadsheet summarizing all of the monitoring data that has been collected since the effective date of the
current permit;
• A verification that the information in the renewal application is still is still complete and correct; and
• An explanation of any operational changes since the renewal application was submitted.
The following link will take you to an online search box where you will be able to enter your permit number and review
the facilities information to make sure it is correct:
https://reports.ncdenr.org/BOE/Open Document/1703191515/CrystalReports/viewrpt.cwr?id=25212&apsuser=BIMS U
&apspassword=blOMs cr%28ddnri59%29&apsauthtype=secEnterprise&cmd=EXPORT&EXPORT FMT=U2FPDF%3AO.
The permit application is from 2014 so it is possible some information will need to be updated.
Information can be updated using the links provided below, where applicable:
Owner Update: https://edocs.deg.nc.gov/Forms/SW-Name-Change
Owner Affiliation (i.e., someone with the company who is designated to represent the company per signatory
requirements in the permit (e.g., CEO) or another authorized representative): https://edocs.deg.nc.gov/Forms/SW-
Owner-Affiliation
Company of Facility Name: https://edocs.deg.nc.gov/Forms/SW-Name-Change
What happens next:
• In an email sent on Monday (3/25/19), I listed a basic process for what is coming next. Today I am
emailing the draft permits to the Mooresville Regional Office Stormwater Contact for a 30-Day comment
period and beginning the public notice process during the same 30-day period. Once I have the above
listed information, I can email you the permit drafts for your 30-day comment period.
• The public notice process is expected to start next week. Once the public notice process ends, I will
receive an affidavit. By this time your and the MRO Contact's comments should have been addressed and
the permits can be issued as soon as I have the affidavit.
Feel free to contact me with any questions,
Lauren
Lauren Garcia
Environmental Specialist II
Stormwater Program
Division of Energy, Mineral, and Land Resources
North Carolina Department of Environmental Quality
919-707-3648 (0)
lauren.garcia@ncdenr.gov
DEMLR Stormwater Program
512 N. Salisbury Street
1612 Mail Service Center
Raleigh, NC 27699-1612
Compares]
Email correspondence to and from this address is subject to the
North Carolina Public Records Law and may be disclosed to third parties.