Loading...
HomeMy WebLinkAbout20190902 Ver 1_Shoreline Stabilization_201907082 0 1 90 9 02 July 2, 2019 Division of Water Resources 401 and Buffer Permitting Unit 1617 Mail Service Center Raleigh, NC 27699-1617 Re: 128 Ridge Road, Troy NC 0,0 ®®To Whom It May Concern: Please find enclosed my shoreline stabilization application form and fee of $240. 1 spoke with Chad Turlington in the Fayetteville regional office and reviewed the contents of this application for accuracy before sending, so I hope it will be approved without delay. Thank you! Chuck Elyea 704-201-1222 Cc: Chad Turlington, DWR Fayetteville John Bradley, Duke Energy Danny Adams, Daniel Adams Construction 15127 Wyndham Oaks Drive Charlotte, NC 28277 State of North Carolina Department of Environment and Natural Resources DWR Division of Water Resources 15A NCAC 02H .0500 —Water Quality Certification, Shoreline Stabilization Division of Water Resources FORM: SSGP 10-2013 Shoreline Stabilization Application Form Three copies of the application (including attachments) and the application fee should be sent to: Division of Water Resources 401 & Buffer Permitting Unit 1617 Mail Service Center Raleigh, NC 27699-1617 I. Applicant Information [15A NCAC 02H .0502(a)] 1. Owner Information Name: Charles E. Elyea Mailing Address: 15127 Wyndham Oaks Drive Charlotte, NC 28277 Telephone Number: E-mail Address: 704-201-1222 Fax Number: chuck@sharemytoolbox.com 2. Agent/ Contact Person Information A signed and dated copy of the Agent Authorization letter (a form can be downloaded here: http://www.saw.usace.army.mil/Portals/59/docs/regulatory/regdocs/Permits/SAMPLE AGENT AUTH ORIZATION FORM.pdf) must be attached if the Agent has signed this application form. Name: Company Affiliation: Mailing Address: Telephone Number: Fax Number: E-mail Address: Person to receive the Certification Approval: Charles E. Elyea (owner) II. Project Information [15A NCAC 02H .0502(a) & (b)] 1. Attach a vicinity map (i.e. street map) clearly showing the location of the property with respect to local landmarks such as towns, rivers, and roads. 2. Provide a detailed site plan showing property boundaries and proposed locations of vegetation clearing, structures (buildings, retaining walls, docks, impervious surfaces, FORM: SSGP 10-2013 Page 1 of 3 etc.), rip rap, excavation or dredging below Full Pond/ Normal Water Level elevations, and construction access corridors. You may use the diagram provided at the end of this application form. 3. Attach a photograph of the shoreline/ buffer proposed to be stabilized. (Include a scale of some sort- a yard stick, shovel handle, etc.) 4. Location of the property (where work is to be conducted) County: Montgomery Nearest Town: Troy Subdivision name or site address (include phase/lot number): The Ridge on Tillery - Lot 2 128 Ridge Road, Troy, NC 27371 Directions to site - please include road names and numbers, landmarks, etc.: From Albemarle travel east on Hwy 27, cross the bridge on Lake Tillery, tum left on River Road, tum left on Sugar Loaf, tum left on Ridge Road. Gate code is #1010 into neighborhood. Latitude (in decimal degrees) 35.350911 Longitude (decimal degrees) -80.063754 5. Describe the existing land use or condition of the site at the time of this application (residential, undeveloped, etc.): Residential - home construction almost complete 6. Property size (acres): 1 7. Lake/ river/ ocean adjacent to property: Lake Tillery 8. Describe proposed work (include discussion as to how hardening of shoreline has been avoided, or why it is necessary): Standard shoreline stabilization with installation of riprap. Grade shoreline at 45 degrees, install rock, etc. 9. Will work be conducted from land? ® From water? ❑ 10. Total amount of disturbance (including all excavation, backfill, rip rap, retaining walls, etc.) below the normal pool lake level/ Normal Water Level in square feet or acres: Rip rap installed up to 24" below lake level, but generally installed on lake bed. 260sf of rip rap maximum. 11. Total amount of disturbance (including all clearing, back fill, excavation, rip rap, retaining walls, etc.) above the normal pool lake level/ Normal Water Level and 50 feet land -ward in square feet or acres: Approximately 390sf of rip rap (3' x 130') above water level. Clearing and terracing additional 6110sf (47`x130) 12. Please describe the vegetation above the normal pool lake level/ Normal Water Level and 50 feet landward to be impacted (number of trees, for instance): All trees within 15'ofshoreline will need to be cleared for access. Approximately 15 trees to be cleared within the next 35'. Owner/Agent's Signature` [15A NCAC 02H .0502(f)1 07-02-2019 Date 'Agent's signature is valid only if an authorization letter from the owner is provided. FORM: SSGP 10-2013 Page 2 of 3 Or,. m Q OOF vhf 06,- W 6Z 130' Shoreline W L C W d 0 O 130' Shoreline f j / iY t Y Y `A Mi J' �� f I+ yr> 1 f's r (� 316000 WAPH �aAIH cn,pooM EEI 1E] EE out i)AI,Cj a6pid 8Z L NJPd DIBIS ulelunOV4 mojjov4 e4 �I All G L I 'dT _ f w' 4r � .,. 1, � -� a t�• 1 `y Y.. } ove 3 z h mi k K �� LAKE