Loading...
HomeMy WebLinkAboutNCC190890_ESC Approval Submitted_20190708 ROY COOPER Governor MICHAEL S. REGAN Secretary Energy,Mineral S. DANIEL SMITH and Land Resources Interim Director ENVIRONMENTAL QUALITY June 25, 2019 LETTER OF APPROVAL WITH MODIFICATIONS Duke Energy Carolinas, LLC Attention: Christopher Varner, Senior Project Manager Post Office Box 1244 Charlotte,North Carolina 28201 RE: Project Name: Grading and Erosion &Sediment Control Plan For Final Closure of Former Ash Storage Areas—Additional Area Acres Approved: 3.5 Project ID: GASTO-2019-023 County: Gaston, City: Mount Holly Address: 175 Steam Plant Road River Basin: Catawba Stream Classification: WS-IV, B: CA, Other Submitted By: Duke Energy Carolinas, LLC Date Received by LQS: June 11, 2019 Plan Type: New Dear Mr. Varner: This office has reviewed the subject erosion and sedimentation control plan. We find the plan to be acceptable with modifications and hereby issue this letter of Approval with Modifications. The Modifications Required for Approval are listed on the attached page. This plan approval shall expire three (3) years following the date of approval, if no land-disturbing activity has been undertaken, as is required by Title 15A NCAC 4B .0129. As of April 1, 2019, all new construction activities are required to complete and submit an electronic Notice of Intent (NOI) form requesting a Certificate of Coverage (COC) under the NCGO10000 Construction Stormwater General Permit. This form MUST be submitted prior to the commencement of any land disturbing activity on the above named project. The NOI form may be accessed at deq.nc.gov/NCGO1. Please direct questions about the NOI form to Annette Lucas at Annette.lucas@ncdenr.gov or Paul Clark at Paul.clark@ncdenr.gov. After you submit a complete and correct NOI Form, a COC will be emailed to you within three business days. A $100 fee will be charged annually. This fee is to be sent to the DEMLR Stonmwater Central Office staff in Raleigh. Title 15A NCAC 4B .0118(a) and the NCGO1 permit require that the following documentation be kept on file at the job site: 1. The approved E&SC plan as well as any approved deviation. State of North Carolina 1 Emironmcnial Quality 1 Energy,Mineral and land Resources Mooresville Regional Office 1 610 Fast Center Ave Sic 301 I Mooresville,NC 28115 704 663 1699 T Letter of Approval with Modifications Duke Energy Carolinas, LLC June 25, 2019 Page 2 of 3 2. The NCGO1 permit and the COC, once it is received. 3. Records of inspections made during the previous 30 days. Also, this letter gives the notice required by G.S. 113A-61.1(a) of our right of periodic inspection to insure compliance with the approved plan. North Carolina's Sedimentation Pollution Control Act is performance-oriented, requiring protection of existing natural resources and adjoining properties. If, following the commencement of this project, the erosion and sedimentation control plan is inadequate to meet the requirements of the Sedimentation Pollution Control Act of 1973 (North Carolina General Statute 113A-51 through 66), this office may require revisions to the plan and implementation of the revisions to insure compliance with the Act. Acceptance and approval of this plan is conditioned upon your compliance with Federal and State water quality laws, regulations, and rules. In addition, local city or county ordinances or rules may also apply to this land- disturbing activity. This approval does not supersede any other permit or approval. Please note that this approval is based in part on the accuracy of the information provided in the Financial Responsibility Form, which you provided. You are requested to file an amended form if there is any change in the information included on the form. In addition, it would be helpful if you notify this office of the proposed starting date for this project. Please notify us if you plan to have a preconstruction conference. Your cooperation is appreciated. Sincerely, am�i , PE, CPESC Assistant Regional Engineer Land Quality Section Enclosures: Certificate of Approval Modifications Required for Approval NCGO1 Fact Sheet c via E-mail: Chad Brown, PE, Wood Environment& Infrastructure Solutions, Incorporated c: Inspection Department Letter of Approval with Modifications Duke Energy Carolinas, LLC June 25, 2019 Page 3 of 3 MODIFICATIONS REQUIRED FOR APPROVAL Project Name: Grading and Erosion& Sediment Control Plan For Final Closure of Former Ash Storage Areas—Additional Area Project ID: GASTO-2019-023 County: Gaston Modifications Pursuant to anPlicable North Carolina General Statutes and/or Regulations: 1. Additional measures may be required - The applicant is responsible for the control of sediment on-site. If the approved erosion and sedimentation control measures prove insufficient, the applicant must take those additional steps necessary to stop sediment from leaving this site. [15A NCAC 4B .0115] Additional Comments: 1. Approval of this erosion and sediment control plan does not supersede any requirements or provisions of North Carolina Senate Bill 729, "The Coal Ash Management Act", the Dam Safety Act of 1967, as amended, or any other applicable regulation. 2. The NPDES General Construction Stormwater Permit does not supersede any existing or potential wastewater and/or industrial stormwater permit requirements, or any other applicable regulation. CERTIFICATE OF PLAN APPROVAL d��'tz1111111 ti 4 F.d.Y YD r3 ���3jrl *Elf quvq V1�►'Y�r The posting of this certificate certifies that an erosion and sedimentation control plan has been approved for this project by the North Carolina Department of Environment and Natural Resources in accordance with North Carolina General Statute 113A - 57 (4) and 113A - 54 (d) (4) and North Carolina Administrative Code, Title 15A, Chapter 4B.0107 (c). This certificate must be posted at the primary entrance of the job site before construction begins and until establishment of permanent groundcover as required by North Carolina Administrative Code, Title 15A, Chapter 4B.0127 (b). (k1N& 40) EXAWN f,2�IMEWT CQrv7AX pLfnV tM FOL cZOX45 Aa� - ,4&)17aNAL-41-W 11n0VNT- 1-)W Y) 64STDn1 60-P-A—rY Project Name and Location G�-sTo -tea 1 q r6z3 Date of Plan Approval Regional Engineer NCDENR