HomeMy WebLinkAboutNC0025534_Inspection_20190702EPA
United States Environmental Protection Agency
Washington, D.C. 20460
Water Compliance Inspection Report
Form Approved.
OMB No. 2040-0057
Approval expires 8-31-98
Section A: National Data System Coding (i.e., PCS)
Transaction Code NPDES yr/mo/day Inspection Type Inspector Fac Type
1 N 52 NC0025534 19/07/02 C S31112171819 20
21 66
Inspection Work Days Facility Self-Monitoring Evaluation Rating B1 QA ----------------------Reserved-------------------
2 N67707172 73 74 75 80
Section B: Facility Data
Name and Location of Facility Inspected (For Industrial Users discharging to POTW, also include
POTW name and NPDES permit Number)
Hendersonville WWTP
80 Balfour Rd
Hendersonville NC 28792
Entry Time/Date Permit Effective Date
Exit Time/Date Permit Expiration Date
10:00AM 19/07/02 18/01/01
Name(s) of Onsite Representative(s)/Titles(s)/Phone and Fax Number(s)
///
Scott William Chovan/ORC/828-697-3077/
Other Facility Data
12:00PM 19/07/02 22/12/31
Name, Address of Responsible Official/Title/Phone and Fax Number
Lee Smith,305 Williams St Hendersonville NC 287931760//828-697-1707/Contacted
No
Section C: Areas Evaluated During Inspection (Check only those areas evaluated)
Permit Operations & Maintenance Sludge Handling Disposal Facility Site Review
Effluent/Receiving Waters
Section D: Summary of Finding/Comments (Attach additional sheets of narrative and checklists as necessary)
(See attachment summary)
Name(s) and Signature(s) of Inspector(s)Agency/Office/Phone and Fax Numbers Date
Daniel J Boss ARO WQ//828-296-4658/
Signature of Management Q A Reviewer Agency/Office/Phone and Fax Numbers Date
EPA Form 3560-3 (Rev 9-94) Previous editions are obsolete.
Page#1
DocuSign Envelope ID: 4F976E62-8C31-4B9E-9F5A-3C1C8A85B81E
7/9/2019
7/9/2019
NPDES yr/mo/day
19/07/02
Inspection Type
C3111218
1
Section D: Summary of Finding/Comments (Attach additional sheets of narrative and checklists as necessary)
I met with Garrett Demoss (ORC) for a compliance evaluation inspection of the Hendersonville WWTP
on 7/2/2019. Overall the plant appeared to be maintained and operated very well.
There are many upgrades and replacements taking place at the WWTP. Many new pumps and drives
have been installed in the last year or two. The SCADA system has been updated recently. A new 15
MGD tertiary filter is currently being constructed. A new backup generator is in the process of being
installed and it should be finished by Labor Day 2019. It's planned that the generator will be run one
hour each week as a test.
The upgrades that have taken place at the Hendersonville WWTP, along with the planned upgrades to
come, are preparing the WWTP for an expansion of their designed/permitted flow.
NC0025534 17 (Cont.)
Page#2
DocuSign Envelope ID: 4F976E62-8C31-4B9E-9F5A-3C1C8A85B81E
Permit:NC0025534
Inspection Date:07/02/2019
Owner - Facility:
Inspection Type:
Hendersonville WWTP
Compliance Evaluation
Permit Yes No NA NE
(If the present permit expires in 6 months or less). Has the permittee submitted a new
application?
Is the facility as described in the permit?
# Are there any special conditions for the permit?
Is access to the plant site restricted to the general public?
Is the inspector granted access to all areas for inspection?
Comment:
Operations & Maintenance Yes No NA NE
Is the plant generally clean with acceptable housekeeping?
Does the facility analyze process control parameters, for ex: MLSS, MCRT, Settleable
Solids, pH, DO, Sludge Judge, and other that are applicable?
Comment:
Bar Screens Yes No NA NE
Type of bar screen
a.Manual
b.Mechanical
Are the bars adequately screening debris?
Is the screen free of excessive debris?
Is disposal of screening in compliance?
Is the unit in good condition?
Comment:
Grit Removal Yes No NA NE
Type of grit removal
a.Manual
b.Mechanical
Is the grit free of excessive organic matter?
Is the grit free of excessive odor?
# Is disposal of grit in compliance?
Comment:
Page#3
DocuSign Envelope ID: 4F976E62-8C31-4B9E-9F5A-3C1C8A85B81E
Permit:NC0025534
Inspection Date:07/02/2019
Owner - Facility:
Inspection Type:
Hendersonville WWTP
Compliance Evaluation
Aeration Basins Yes No NA NE
Mode of operation Ext. Air
Type of aeration system Diffused
Is the basin free of dead spots?
Are surface aerators and mixers operational?
Are the diffusers operational?
Is the foam the proper color for the treatment process?
Does the foam cover less than 25% of the basin’s surface?
Is the DO level acceptable?
Is the DO level acceptable?(1.0 to 3.0 mg/l)
Garrett says that the DO is checked daily in the aeration basins. Typically the DO level is
about 4.0 at the end of the basins. The settleability is kept at about 50% and the MLSS is
kept between 4000-5000mg/L.
Comment:
Secondary Clarifier Yes No NA NE
Is the clarifier free of black and odorous wastewater?
Is the site free of excessive buildup of solids in center well of circular clarifier?
Are weirs level?
Is the site free of weir blockage?
Is the site free of evidence of short-circuiting?
Is scum removal adequate?
Is the site free of excessive floating sludge?
Is the drive unit operational?
Is the return rate acceptable (low turbulence)?
Is the overflow clear of excessive solids/pin floc?
Is the sludge blanket level acceptable? (Approximately ¼ of the sidewall depth)
One of the two clarifiers has significant pin floc coming over the weir. Garrett says that the
sludge blankets fluctuate but typically measure between 3 and 4 feet of 10 feet of water
depth.
Comment:
Filtration (High Rate Tertiary)Yes No NA NE
Type of operation:
Is the filter media present?
Is the filter surface free of clogging?
Is the filter free of growth?
Is the air scour operational?
Page#4
DocuSign Envelope ID: 4F976E62-8C31-4B9E-9F5A-3C1C8A85B81E
Permit:NC0025534
Inspection Date:07/02/2019
Owner - Facility:
Inspection Type:
Hendersonville WWTP
Compliance Evaluation
Filtration (High Rate Tertiary)Yes No NA NE
Is the scouring acceptable?
Is the clear well free of excessive solids and filter media?
The tertiary filter was actively under construction, so I did not inspect this treatment unit.
The new unit will have 15 MGD capacity.
Comment:
Disinfection - UV Yes No NA NE
Are extra UV bulbs available on site?
Are UV bulbs clean?
Is UV intensity adequate?
Is transmittance at or above designed level?
Is there a backup system on site?
Is effluent clear and free of solids?
All bulbs were functional for Bank A, which was running at the time.Comment:
Standby Power Yes No NA NE
Is automatically activated standby power available?
Is the generator tested by interrupting primary power source?
Is the generator tested under load?
Was generator tested & operational during the inspection?
Do the generator(s) have adequate capacity to operate the entire wastewater site?
Is there an emergency agreement with a fuel vendor for extended run on back-up power?
Is the generator fuel level monitored?
The generator is brand new and the installation should be finished by Labor Day 2019.Comment:
Solids Handling Equipment Yes No NA NE
Is the equipment operational?
Is the chemical feed equipment operational?
Is storage adequate?
Is the site free of high level of solids in filtrate from filter presses or vacuum filters?
Is the site free of sludge buildup on belts and/or rollers of filter press?
Is the site free of excessive moisture in belt filter press sludge cake?
The facility has an approved sludge management plan?
Comment:
Page#5
DocuSign Envelope ID: 4F976E62-8C31-4B9E-9F5A-3C1C8A85B81E
Permit:NC0025534
Inspection Date:07/02/2019
Owner - Facility:
Inspection Type:
Hendersonville WWTP
Compliance Evaluation
Page#6
DocuSign Envelope ID: 4F976E62-8C31-4B9E-9F5A-3C1C8A85B81E