Loading...
HomeMy WebLinkAbout20160979 Ver 1_Year 0 As-Built Review_20190709Site Information Site Information Date: * Prepared By: Meeting Type:* USACE AID: 7/9/2019 Erin Davis Year 0 As -Built Review NCDWR ID: 20160979 NCDWR Version 1 Weather: Coordinates: Attendees Project Name:* Poplar Creek Type of Site:* Bank Stream Site Sponsor/Provider: *Bank Stream Site County:* Johnston HUC and Basin:* Neuse - 03020201 Degrees North Degrees West DWR - Mac Haupt, Katie Merritt, Erin Davis USACE - Todd Tugwell, Kim Browning, Sam Dailey RES- Brad, David, Ben, Jamie, Ryan Project Review Checklist (provide additional detail in notes section on next Daae) General Site Issues/Concerns Stream Issues/Concerns Wetland Issues/Concerns 17 Vegetation Composition or Density Ir Planted Stem Vigor (due to soil, browsing) 17 Invasive/Exotic Species Ir Beaver/Feral Hogs (management plan) 17 Soil (manipulation, compaction, fertility) Ir Livestock Present/Evidence of Livestock Access F- Crossings or Utility Lines F- BMPs or Alternate Approaches ,F- Fencing Issues or Fencing Needed Ir Ponds Within Project Area 17 Incised/Entrenched '7 Headcuts Present/Forming 17 Stream Structures Failing/Piping F- Excess Sediment/Aggradation 17 CrosslSections Missing/Indicate Problems Ir Bank Instability/Failure 17 Bench Rills/Erosion (constructed bench or P2 valley) Ir Excess Sinuosity (lack of flow) r Braided/Anabranch Channel IF- Evidence of Excessive Hydrology F- Evidence of Insufficient Hydrology r Hydric Soil Indicators/Soil Series IF- Surface Roughness or Bedding Ir Channel Relocation/Riparian Connectivity 17 Hydroperiod Length or Start/Stop Date 17 Inappropriate Credit Ratio Proposed Ir JD Needed to Confirm Approach 17 Continuity/Fragmentation Ir Easement Issues (existing farm, CE, NRCS funding) 17 Easement Encroachments (livestock, clearing) Ir Easement Marking/Signage 17 Insufficient Project Size Ir Adjacent Property Owner 17 T&E Species Ir Section 106 (historic listing/tribal issues) 17 Insufficient Stream Drainage Area Ir Insufficient Hydrology (if raising channel bed) 17 Vegetation in Channel (stream vs wetland) 17 Flow Obstructions (undersized pipes, fords) 17 Substrate Concerns (embeddedness, particle size) Ir Live Stakes Absent/Failing 17 Evidence of Water Quality Issues Ir Inlstream Habitat Weak/Missing 17 Stream Buffer Width Inadequate Ir Missing Gauge Data (preconstruction or monitoring) 17 Gauge Location/Placement Ir Gauge Maintenance 17 Drainage Ditches/Swales Present Ir Field Tiles/Subsurface Drainage 17 Continued Ag Use Adjacent to Wetland Page 2 -- Notes and Sketches, etc Had to build pond dam up to make new outlet work (discharges from pond bottom); riprap may extend into easement; channel dry with veg - major concern about flow, veg covered riffle; gauge in pool, surrounding wetland indicator GW table, side seepage anticipated?; several structure failures to be repaired - replace undercut toe logs with brush toe; live stakes not sprouted; stems look good; overflow channel jurisdictional feature within easement include in monitoring for stability, also has structure fail; YB2B - several structure failures/repairs; no footers on toe logs; piping under rock sills; stems look good; live stakes not sprouted; Pond area - flow observed; bedform not good; large bare areas & stressed stems in floodplain; Discussion on flow gauge placement; Wrap-up - do repairs then submit as -built, MY delayed - MY1 2020; Credit Release/Site Closeout Information (For rronitoring or closeout review only) Stream Credits Warm Cool Cold Requested Approved* Wetland Credits Riparian Riverine Riparian Non-Riverine Non -Riparian Coastal Requested Approved* *The updated credit ledger for the project, which includes this release, rrust be approved by the Froject K/hnager. Result of Monitoring Report or Closeout Signature Date 7/9/2019