Loading...
HomeMy WebLinkAbout310548_Plan of Action_2018092118 d-2 6 35_ PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES 30 DAY DRAW DOWN PERIOD I. TOTAL PAN TO BE LAND APPLIED PER WASTE STRUCTURE 10/1/2010 1. Structure Name/Identifier (ID): Cole Baker 31-548 2. Current liquid volume in 25 yr./24 hr. storm storage & structural freeboard a. current liquid level according to marker Dinches b. designed 25 yr./24 hr. storm & structural freeboard 19.0 inches c. line b --line a (inches in red zone) = 19.0 inches d. top of dike surface area according to design (area at below structural freeboard elevation) 34515 ft2 ti e. line c/12 x line d x 7.48 gallons/ft3 408773 gallons 3. Projected volume of waste liquid produced during draw down period f. temporary storage period according to structural design 180 days g. volume of waste produced according to structural design 39561.5 ft3 h. current herd # 1200 certified herd #1 1200 actual waste produced = current herd # x line g = 39562 ft° certified herd # i. volume of wash water according to structural design Oft3 j. excess rainfall over evaporation according to design 28060 ft3 k.. (lines h + i + j) x 7.48 x 30 days/line f= 84301 gallons 4. Total PAN to be land applied during draw down period I. current waste analysis dated 8/1/2018 1.08 Ibs/1000 gal. m. ((lines e + k)/1000) x line 1 = 632.5 Ibs. PAN REPEAT SECTION I FOR EACH WASTE STRUCTURE ON SITE. (Click on the next Structure tab shown below) PoA (30 Day) 2/21/00 9/21/2018 II. TOTAL POUNDS OF PAN STORED WITHIN STRUCTURAL FREEBOARD AND/OR 25 YR./24 HR. STORM STORAGE ELEVATIONS IN ALL WASTE STRUCTURES FOR FACILITY 1. Structure ID: Cole Baker (31-548) line m = 532.5 lb PAN 2. Structure ID: line m = lb PAN 3. Structure ID: line m = lb PAN 4. Structure ID: line m = lb PAN 5. Structure ID: line m = lb PAN 6. Structure ID: line m = lb PAN n.lines 1+2+3+4+5+6= 532.5lbPAN III. TOTAL PAN BALANCE REMAINING FOR AVAILABLE -CROPS DURING 30 DAY DRAW DOWN PERIOD. DO NOT LIST FIELDS TO WHICH PAN CANNOT BE APPLIED DURING THIS 30 DAY PERIOD. o. tract # p. field # q. crop r. acres s. remaining IRR 2 PAN balance (lb/acre) t. TOTAL PAN BALANCE FOR FIELD (Ibs.) column r x s u. application window' 5788 1A Wheat 1.80 100.00 180.0 9/1 - 4/31 57881 1 B Wheat 4.00 100.00 400.0 9/1 - 4/31 5788 2B Wheat 1.80 100.00 180.0 9/1 - 4/31 5788 3 Wheat 7.00 100.00 700.0 9/1 - 4/31 1 'State current crop ending application date or next crop application beginning date for available receiving crops during 30 day draw down period. v. Total PAN available for all fields (sum of column t) = 1460.0 lb. PAN IV. FACILITY'S PDA OVERALL PAN BALANCE w. Total PAN to be land applied (line n from section II) = 532.5' Ib. PAN x. Crop's remaining PAN balance (line v from section III) = 1460.0 lb. PAN y. Overall PAN balance (w - x) _ -927 lb. PAN PoA (30 Day) 2/21 /00 9/21 /2018 u Line y must show as a deficit. If line y does not show as a deficit, list course of action here including pump and haul, depopulation, herd reduction, etc. For pump & haul and herd reduction options, recalculate new PAN based on new information. If new fields are to be included as an option for lowering lagoon level, add these fields to the PAN balance table and recalculate the overall PAN balance. If animal waste is to be hauled to another permitted facility, provide information regarding the herd population and lagoon freeboard -levels at the receiving facility. PoA (30 Day) 2/21 /00 9/21 /2018