Loading...
HomeMy WebLinkAbout310386_Plan of Action_201809260-1 q-77 31- Xis PLAN OF ACTION(Poa) FOR HIGH FREEBOARD AT ANIMAL FACILITIES' Facility Number. 31-386 Facility Name: Edward Brock Farm County: Duplin Certified Operator Name: Melissa Wallace Operator, Number: AWA 17319 1. Current liquid level(s) in inches as measured from the current liquid level in the lagoon to the lowest point on the top of the dam for lagoons without spillways; and from the current liquid level in the lagoon to the bottom of the spillway for lagoons with spillways. Lagoon Name/ID: Spillway(Y or N): Level(inches): Lagoon 1 Lagoon 2 Lagoon 3 Lagoon 4 Lagoon 5 1 2 N N 0 20 2. Check all applicable items Liquid level is within the designed structural freeboard elevations of one or more structures. Five and 30 day Plans of Action are attached. Hydraulic and agronomic balances are within acceptable ranges. X Liquid level is within the 25 year 24 hour storm elevations for one or more structures. A 30 day Plan of Action is attached. Agronomic balance is within acceptable range. Waste is to be pumped and hauled to off site locations. Bolume and PAN content of waste to be pumped and hauled is reflected in section III tables. Included within this plan is a list of the proposed sites with related facility numbers, number of acres and receiving crop information. Contact and secure approval from the DWQ prior to transfer of waste to a site not covered in the facility's CAWMP. Operation will be partially or fully depopulated. *Attach a complete schedule with corresponding animal units and dates for depopulation *if animals are to be moved to another permitted facility, provide facility number, lagoon freeboard levels and herd population for the receiving facility 3. Earliest possible date to begin land application of waste: 9/23/2018 I hereby certify that I have reviewed the information listed above and included within the attached Plan of Action, and to the best of my knowledge and ability, the information is accurate and correct. Edward Brock Phone: Facility Owner/Manager (print) Date. Facility Owner/Man ge (signature) 910=271-1746 q- �.L�-1 ",(' C I- II. TOTAL POUNDS OF PAN STORED WITHIN STRUCTURAL FREEBOARD AND/OR 25 YRJ24 HR. STORM STORAGE ELEVATIONS IN ALL WASTE STRUCTURES FOR FACILITY 1. Structure ID:. Lagoon #1 line m = 689.7 lb, PAN 2. Structure ID: Lagoon 2 line m = 520.1 lb PAN 3. Structure ID: line m = -lb, PAN 4, Structure ID: line m = lb PAN 5. Structure ID: line m = lb PAN 6. Structure ID: line m = lb, PAN n.lines 1+2+3+4+5+6= 1209.8lbPAN III. TOTAL PAN BALANCE REMAINING FOR AVAILABLE CROPS DURING 30 DAY DRAW DOWN PERIOD. DO NOT LIST FIELDS TO WHICH PAN CANNOT BE APPI IFn nuRlNr; THIS -,in nnv PFRinn O. tract # p. field # q. crop r. acres s. remaining IRR 2 PAN balance (lb/acre) t TOTAL PAN BALANCE FOR FIELD (Ibs.) column r x s u. application window' 4776 HIIA bermuda rass 0.56 235.00 131.6 Mar -Oct 4787 H1 bermuda rass 1.76 205.38 361.5 Mar -Oct 4787 H2 bermuda rass 2.31 215.75 498.4 Mar -Oct 4787 H3 bermuda rass 2.49 205.42 511.5 Mar -Oct 4787 H4 bermuda rass 2.32 100.76 233.8 Mar -Oct 4787 H5 bermuda rass 1.30 125.24 162.8 Mar -Oct 4787 H6 bermuda rass 1.28 92A 1 117.9 Mar -Oct 4787 H7 bermuda rass 1.94 168.26 326.4 Mar -Oct 4787 H8 bermuda rass 1.92 84.36 162.0 mar -Oct 4787 H9 bermuda rass 2.38 156.56 372.6 Mar -Oct State current crop ending application date or next crop application beginning date for available receiving crops during 30 day draw down period. v.-Total PAN available for all fields (sum of column t) = 2878.4 lb. PAN IV. FACILITY'S PoA OVERALL PAN BALANCE w. Total PAN to be land applied (line In from section II) = 1209.8 Ib. PAN PoA (30 Day) 2/21100 x. Crop's remaining PAN balance (line v from section III) = 2878.4 lb. PAN y. Overall PAN balance (w - x) _ -1669 Ib. PAN Line y must show as a deficit. If line y does not show as a deficit, list course of action here including pump and haul, depopulation, herd reduction, etc. For pump & haul and herd reduction options, recalculate new PAN based on new information. If new fields are to be included as an option for lowering lagoon level, add these. fields to the PAN balance table and recalculate the overall PAN balance. If animal waste is to be hauled to another permitted facility, provide information regarding the herd population and lagoon freeboard levels at the receiving facility. Irrigation onto existing spray fields will continue as weather and field conditions permit. The lagoon was inundated during Hurricane Florence which resulted in a 0" freeboard. Mr. Brock was able to begin irrigation on 9/23/18. PoA (30 Day) 2/21/00 W-1 PLAN OF ACTION (PoA) FOR HIGH FREEBOARD,AT ANIMAL FACILITIES 30 DAY DRAW DOWN PERIOD I. TOTAL PAN TO BE LAND APPLIED PER WASTE STRUCTURE 1. Structure Name/ldentifier (ID): Lagoon #1 2. Current liquid volume in 25 yr./24 hr. storm storage & structural freeboard a. current liquid level according to marker 0.1 inches b. designed 25 yr./24 hr. storm & structural freeboard 19.0 inches c. line b - line a (inches in red zone) = 18.9 inches r d. top of dike surface area according to design (area at below structural freeboard elevation) 64476 ftz e, line c/12 x line,d x 7.48 gallons/ft3 759592 gallons 3. Projected volume of waste liquid produced during draw down period f. temporary storage period according to structural design 180 days g. volume of waste produced according to structural design 71210 ft3 h_ current herd # 300 certified herd # 2160 actual waste produced = current herd # x line g = 9890 ft' certified herd # i. volume of wash water according to structural design �ft3 j. excess rainfall over evaporation according to design 39462.5 ft3 k. (lines h + i + j) x-7.48 x 30 days/line f= 61526 gallons 4. Total PAN to be land applied during draw down period I. current waste analysis dated 7/4/2018 0.84 Ibs/1000 gal. m. ((lines e + k)/1000) x line 1 = 689.7 Ibs. PAN REPEAT SECTION I FOR EACH WASTE STRUCTURE ON SITE. (Click on the next Structure tab shown below) PoA (30 Day) 2/21/00 PLAN OF ACTION (POA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES 30 DAY DRAW DOWN PERIOD I. TOTAL PAN TO BE LAND APPLIED PER WASTE STRUCTURE 1. Structure Name/Identifier (ID): Lagoon 2 2. Current liquid volume in 25 yr./24 hr. storm storage & structural freeboard a. current liquid level according to marker b. designed-25 yr./24 hr. storm & structural freeboard c. line b - line a (inches in red zone) _ d. top of dike surface area according to design (area at below structural freeboard elevation) e_ line c/12 x line d x 7.48 gallons/ft3 3. Projected volume of waste liquid produced during draw down period 20.0 inches 30.0 inches 10.0 inches 90816 fe 566086 gallons f. temporary storage period according to structural design 180 days g. volume of waste produced according to structural design 79123 ft3 h. current herd # 1766 certified herd # 2400 actual waste produced = current herd # x line g = certified herd # i. volume of wash water according to structural design j. excess rainfall over evaporation according to design k. (lines h + i +j) x 7.48 x 30 days/line f= 4. Total PAN to be land applied during draw down period I. current waste analysis dated 7/4/2018 m. ((lines e + k)/1000) x line I = REPEAT SECTION I FOR EACH WASTE STRUCTURE ON SITE. (Click on the next Structure tab shown below) PoA (30 Day) 2/21 /00 58221 W ft3 67095 ft3 156228 gallons 0.72 Ibs/1000 gal. 520.1 lbs. PAN