PLAN OF ACTION(Poa) FOR HIGH FREEBOARD AT ANIMAL FACILITIES'
Facility Number. 31-386
Facility Name:
Edward Brock Farm
County: Duplin
Certified Operator Name: Melissa Wallace Operator, Number: AWA 17319
1. Current liquid level(s) in inches as measured from the current liquid level in the lagoon to the
lowest point on the top of the dam for lagoons without spillways; and from the current liquid level
in the lagoon to the bottom of the spillway for lagoons with spillways.
Lagoon Name/ID:
Spillway(Y or N):
Level(inches):
Lagoon 1 Lagoon 2 Lagoon 3 Lagoon 4 Lagoon 5
1 2
N N
0 20
2. Check all applicable items
Liquid level is within the designed structural freeboard elevations of one or more structures.
Five and 30 day Plans of Action are attached. Hydraulic and agronomic balances are
within acceptable ranges.
X Liquid level is within the 25 year 24 hour storm elevations for one or more structures. A
30 day Plan of Action is attached. Agronomic balance is within acceptable range.
Waste is to be pumped and hauled to off site locations. Bolume and PAN content of waste
to be pumped and hauled is reflected in section III tables. Included within this plan is a list
of the proposed sites with related facility numbers, number of acres and receiving crop
information. Contact and secure approval from the DWQ prior to transfer of waste to a site
not covered in the facility's CAWMP.
Operation will be partially or fully depopulated.
*Attach a complete schedule with corresponding animal units and dates for depopulation
*if animals are to be moved to another permitted facility, provide facility number, lagoon
freeboard levels and herd population for the receiving facility
3. Earliest possible date to begin land application of waste: 9/23/2018
I hereby certify that I have reviewed the information listed above and included within the
attached Plan of Action, and to the best of my knowledge and ability, the information is
accurate and correct.
Edward Brock Phone:
Facility Owner/Manager (print)
Date.
Facility Owner/Man ge (signature)
910=271-1746
q- �.L�-1 ",('
C I-
II. TOTAL POUNDS OF PAN STORED WITHIN STRUCTURAL FREEBOARD AND/OR 25 YRJ24
HR. STORM STORAGE ELEVATIONS IN ALL WASTE STRUCTURES FOR FACILITY
1.
Structure ID:. Lagoon #1
line m = 689.7 lb, PAN
2.
Structure ID: Lagoon 2
line m = 520.1 lb PAN
3.
Structure ID:
line m = -lb, PAN
4,
Structure ID:
line m = lb PAN
5.
Structure ID:
line m = lb PAN
6.
Structure ID:
line m = lb, PAN
n.lines 1+2+3+4+5+6= 1209.8lbPAN
III. TOTAL PAN BALANCE REMAINING FOR AVAILABLE CROPS DURING 30 DAY DRAW DOWN
PERIOD. DO NOT LIST FIELDS TO WHICH PAN CANNOT BE APPI IFn nuRlNr; THIS -,in nnv PFRinn
O. tract #
p. field #
q. crop
r. acres
s. remaining IRR
2 PAN balance
(lb/acre)
t TOTAL PAN
BALANCE FOR
FIELD (Ibs.)
column r x s
u. application window'
4776
HIIA
bermuda rass
0.56
235.00
131.6
Mar -Oct
4787
H1
bermuda rass
1.76
205.38
361.5
Mar -Oct
4787
H2
bermuda rass
2.31
215.75
498.4
Mar -Oct
4787
H3
bermuda rass
2.49
205.42
511.5
Mar -Oct
4787
H4
bermuda rass
2.32
100.76
233.8
Mar -Oct
4787
H5
bermuda rass
1.30
125.24
162.8
Mar -Oct
4787
H6
bermuda rass
1.28
92A 1
117.9
Mar -Oct
4787
H7
bermuda rass
1.94
168.26
326.4
Mar -Oct
4787
H8
bermuda rass
1.92
84.36
162.0
mar -Oct
4787
H9
bermuda rass
2.38
156.56
372.6
Mar -Oct
State current crop ending application date or next crop application beginning date for available
receiving crops during 30 day draw down period.
v.-Total PAN available for all fields (sum of column t) = 2878.4 lb. PAN
IV. FACILITY'S PoA OVERALL PAN BALANCE
w. Total PAN to be land applied (line In from section II) = 1209.8 Ib. PAN
PoA (30 Day) 2/21100
x. Crop's remaining PAN balance (line v from section III) = 2878.4 lb. PAN
y. Overall PAN balance (w - x) _ -1669 Ib. PAN
Line y must show as a deficit. If line y does not show as a deficit, list course of action here including pump and
haul, depopulation, herd reduction, etc. For pump & haul and herd reduction options, recalculate new PAN
based on new information. If new fields are to be included as an option for lowering lagoon level, add these.
fields to the PAN balance table and recalculate the overall PAN balance. If animal waste is to be hauled to
another permitted facility, provide information regarding the herd population and lagoon freeboard levels at the
receiving facility.
Irrigation onto existing spray fields will continue as weather and field conditions permit.
The lagoon was inundated during Hurricane Florence which resulted in a 0" freeboard. Mr. Brock was able to
begin irrigation on 9/23/18.
PoA (30 Day) 2/21/00
W-1
PLAN OF ACTION (PoA) FOR HIGH FREEBOARD,AT ANIMAL FACILITIES
30 DAY DRAW DOWN PERIOD
I. TOTAL PAN TO BE LAND APPLIED PER WASTE STRUCTURE
1. Structure Name/ldentifier (ID): Lagoon #1
2. Current liquid volume in 25 yr./24 hr. storm storage & structural freeboard
a. current liquid level according to marker 0.1 inches
b. designed 25 yr./24 hr. storm & structural freeboard 19.0 inches
c. line b - line a (inches in red zone) = 18.9 inches
r
d. top of dike surface area according to design
(area at below structural freeboard elevation) 64476 ftz
e, line c/12 x line,d x 7.48 gallons/ft3 759592 gallons
3. Projected volume of waste liquid produced during draw down period
f. temporary storage period according to structural design 180 days
g. volume of waste produced according to structural design 71210 ft3
h_ current herd # 300 certified herd # 2160
actual waste produced = current herd # x line g = 9890 ft'
certified herd #
i. volume of wash water according to structural design �ft3
j. excess rainfall over evaporation according to design 39462.5 ft3
k. (lines h + i + j) x-7.48 x 30 days/line f= 61526 gallons
4. Total PAN to be land applied during draw down period
I. current waste analysis dated 7/4/2018 0.84 Ibs/1000 gal.
m. ((lines e + k)/1000) x line 1 = 689.7 Ibs. PAN
REPEAT SECTION I FOR EACH WASTE STRUCTURE ON SITE.
(Click on the next Structure tab shown below)
PoA (30 Day) 2/21/00
PLAN OF ACTION (POA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES
30 DAY DRAW DOWN PERIOD
I. TOTAL PAN TO BE LAND APPLIED PER WASTE STRUCTURE
1. Structure Name/Identifier (ID): Lagoon 2
2. Current liquid volume in 25 yr./24 hr. storm storage & structural freeboard
a. current liquid level according to marker
b. designed-25 yr./24 hr. storm & structural freeboard
c. line b - line a (inches in red zone) _
d. top of dike surface area according to design
(area at below structural freeboard elevation)
e_ line c/12 x line d x 7.48 gallons/ft3
3. Projected volume of waste liquid produced during draw down period
20.0 inches
30.0 inches
10.0 inches
90816 fe
566086 gallons
f. temporary storage period according to structural design 180 days
g. volume of waste produced according to structural design 79123 ft3
h. current herd # 1766 certified herd # 2400
actual waste produced = current herd # x line g =
certified herd #
i. volume of wash water according to structural design
j. excess rainfall over evaporation according to design
k. (lines h + i +j) x 7.48 x 30 days/line f=
4. Total PAN to be land applied during draw down period
I. current waste analysis dated 7/4/2018
m. ((lines e + k)/1000) x line I =
REPEAT SECTION I FOR EACH WASTE STRUCTURE ON SITE.
(Click on the next Structure tab shown below)
PoA (30 Day) 2/21 /00
58221 W
ft3
67095 ft3
156228 gallons
0.72 Ibs/1000 gal.
520.1 lbs. PAN