HomeMy WebLinkAbout310011_Plan of Action_20180926• �OjbUA-72_
PLAN OF ACTION(Poa) FOR HIGH FREEBOARD AT ANIMAL FACILITIES
Facility Number:
Facility Name:
31-11
Corbet 1-4
County: Duplin
Certified Operator Name: Doug Atkins Operator Number:
985738
1-ti
1. Current liquid level(s) in inches as measured from the current liquid level in the lagoon to the
lowest point on the top of the dam for lagoons without spillways; and from the current liquid level
in the lagoon to the bottom of the spillway for lagoons with spillways.
Lagoon Name/ID:
Spillway(Y or N):
Level(inches):
Lagoon 1 Lagoon 2 Lagoon 3 Lagoon 4 Lagoon 5
1 2 3
no. no no
21 9 11
2. Check all applicable -items
Liquid level is within the designed structural freeboard elevations of one or more structures.
Five and 30 day Plans of Action are attached. Hydraulic and agronomic balances are
within acceptable ranges.
XXXX Liquid level is within the 25 year 24 hour storm elevations for one or more structures. A
30 day Plan of Action is attached. Agronomic balance is within acceptable range.
Waste is to be pumped and hauled to off site locations. Volume and PAN content of waste
to be pumped and hauled is reflected in section III tables. Included within this plan is a list
of the proposed sites with related facility numbers, number of acres and receiving crop
information. Contact and secure approval from the DWQ prior to transfer of waste to a site
not covered in the facility's CAWMP.
Operation will be partially or fully depopulated.
*Attach a complete schedule with corresponding animal units and dates fro depopulation
*if animals are to be moved to another permitted facility,* provide facility number, lagoon
freeboard levels and herd population for the receiving facility
3. Earliest possible date to begin land application of waste: 9/25/2018
I hereby certify that I have reviewed the information listed above and included within the
attached Plan of Action, and to the best of my knowledge and ability, the information is
accurate and correct.
Square One Farms I Phone
Facility Owner/Manager (print)
a�.4�o*v
Facility Owner/Manager (signature)
910-285-1357
Date: 9/25/2018
r-
C
PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES
30 DAY DRAW DOWN PERIOD
I. TOTAL PAN TO BE LAND APPLIED PER WASTE STRUCTURE
1. Structure Name/Identifier (ID): Corbett 2
2. Current liquid volume in 25 yr./24 hr. storm storage & structural freeboard
a. current liquid level according to marker 9.0 inches
b. designed 25 yr./24 hr. storm & structural freeboard 19.0 inches
c. line b - line a (inches in red zone) = 10.0 inches
d. top of dike surface area according -to design
(area at below structural freeboard elevation) 23291 ftz
e. line c/12 x line d x 7.48 gallons/ft3 145181 gallons
3. Projected volume of waste liquid produced during draw down period
f. temporary storage period according to structural design 82 days
g. volume of waste produced according to structural design 27634 ft3
h. current herd # 1840 certified herd #1 1840
actual waste produced = current herd # x line g = 27634 ft'
_ certified herd #
i. volume of wash water according to structural design Oft3
j. excess rainfall over evaporation according to design 30129 ft3
k. (lines h + i + j) x 7.48 x 30 days/line f= 158073 gallons
4. Total PAN to be land applied during draw down period
I. current waste analysis dated 7/19/2018 0.49 Ibs/1000 gal.
m. ((lines e + k)/1000) x line 1= 148.6 lbs. PAN
REPEAT SECTION I FOR EACH WASTE STRUCTURE ON SITE.
(Click on the next Structure tab shown below)
PoA (30 Day) 2121/00
PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES
30,DAY DRAW DOWN PERIOD
I. TOTAL PAN TO BE LAND APPLIED PER WASTE STRUCTURE
1. Structure Name/Identifier (ID): Corbet 3
2. Current liquid volume in 25 yr./24 hr. storm storage & structural freeboard
a. current liquid level according to marker 11.0 inches
b. designed 25 yr./24 hr. storm & structural freeboard
c. line b - line a (inches in red zone) _
d. top of dike surface area according to design
(area at below structural freeboard elevation)
e. line c/12 x line d x 7.48 gallons/ft3
3. Projected volume of waste liquid produced during draw down period
35.0 inches
24.0 inches
66000 ftz
987360 gallons
f. temporary storage period according to structural design 180 days
g. volume of waste produced according to structural design 141698 ft3
h. current herd # 4298 certified herd # 4298
actual waste produced = current herd # x line g = 141698 ft'
certified herd #
i. volume of wash water according to structural design
j. excess rainfall over evaporation according to design
k. (lines h + i + j) x 7.48 x 30 days/line f=
4. Total PAN to be land applied during draw down period
I. current waste analysis dated 7/19/2018
m. ((lines e + k)/1000) x line I =
REPEAT SECTION I FOR EACH WASTE STRUCTURE ON SITE.
(Click on the next Structure tab shown below)
0 ft3
101257 ft3
302884 gallons
0.51 Ibs/1000 gal.
658.0 Ibs. PAN
PoA (30 Day) 2/21 /00
II. TOTAL POUNDS OF PAN STORED WITHIN'STRUCTURAL FREEBOARD AND/OR 25 YRJ24
HR. STORM STORAGE ELEVATIONS IN ALL WASTE STRUCTURES FOR FACILITY
1. Structure ID: Corbett 2 line m = 148.6 lb PAN
2. Structure ID: Corbet 3 line m = 658.0 lb PAN
3. Structure ID: line m = lb PAN
4. Structure ID: line m = lb PAN
5. Structure ID: line m = lb PAN
6. Structure ID: line m = lb PAN
n.lines 1+2+3+4+5+6= 806.6lbPAN
III. TOTAL PAN BALANCE REMAINING FOR AVAILABLE CROPS DURING 30 DAY DRAW DOWN
PERIOD_ ❑O NOT LIST FIELDS TO WHICH PAN CANNOT BE APPLIED DURING THIS 30 DAY PERIOD.
o. tracf#
p. field #
q. crop
r. acres
s. remaining IRR
2 PAN balance
(lb/acre)
t TOTAL PAN
BALANCE FOR
FIELD (lbs.)
column r x s
u. application window'
1-4
Bermuda
17.43
160.00
2788.8
Mar - Se
6-8
Bermuda
16.74
44.00
736.6
Mar - Se
'State current crop ending application date or next crop application beginning date for available
receiving crops during 30 day draw down period.
v. Total PAN available for all fields (sum of column t) = 3525.4 lb. PAN
IV. FACILITY'S PDA OVERALL PAN BALANCE
,
w. Total PAN to be land applied (line in from section II) = 806.6 lb. PAN
x. Crop's remaining PAN balance (line v from section III) = 3525.4 lb. PAN
y. Overall PAN balance (w - x) _ -2719 lb. PAN
ine y must show as a deficit. If line y does not show as a deficit, list course of action here including pump and
aul, depopulation, herd reduction, etc. For pump &haul and herd reduction options, recalculate new PAN
ased on new information. If new fields are to be included as an option for lowering lagoon level, add these
elds to the PAN balance table and recalculate the overall PAN balance. If animal waste is to be hauled to
nother permitted facility, provide information regarding the herd population and lagoon freeboard levels at the
:ceiving facility.
NARRATIVE:
Irrigation onto existing spray fields will begin as weather and field conditions permit. There Is sufficient land and
PAN available.
PoA (30 Day) 2/21/00