HomeMy WebLinkAbout710102_Plan of Action_20180926;!--, - �-o I S C) zq- 5 2-
��✓�� 71-102
PLAN OF ACTION(Poa) FOR HIGH FREEBOARD AT ANIMAL FACILITIES
Facility Number: 71-102
Facility Name:
Wolf and Pack
County: Pender
Certified Operator Name: Doug Atkins Operator Number:
985738
1. Current liquid level(s) in inches as measured from the current liquid level in the lagoon to the
lowest point on the top of the dam for lagoons without spillways; and from the current liquid level
in the lagoon to the bottom of the spillway for lagoons with spillways.
Lagoon Name/ID
Spillway(Y or N):
Level(inches):
Lagoon 1 Lagoon 2 Lagoon 3 Lagoon 4 Lagoon 5
Wolf Pack
no no
0 10
2. Check all applicable items
Liquid level is within the designed structural freeboard elevations of one or more structures.
Five and 30 day Plans of Action are attached. Hydraulic and agronomic balances are
within acceptable ranges.
XXXX Liquid level is within the 25 year 24 hour storm elevations for one or more structures. A
30 day Plan of Action is attached. Agronomic balance is within acceptable range.
Waste is to be pumped and hauled to off site locations. Volume and PAN content of waste
to be pumped and hauled is reflected in section I'll tables. Included within this plan is a list
of the proposed sites with related facility numbers, number of acres and receiving crop
information. Contact and secure approval from the DWQ prior to transfer of waste to a site
not covered in the facility's CAWMP.
Operation will be partially or fully depopulated.
*Attach a complete schedule with corresponding animal units and dates fro depopulation
*if animals are to be moved to another permitted facility, provide facility number, lagoon
freeboard levels and herd population for the receiving facility
3. Earliest possible date to begin land application of waste: 9/25/2018
I hereby certify that I have reviewed the information listed above and included within the
attached Plan of Action, and to the best of my knowledge and ability, the information is
accurate and correct.
Pure Country'Farms Phone:
Facility Owner/Manager (print)
Date:
Facility Owner/Manager (signature)
910-285-1357
9/25/2018
PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES
30 DAY DRAW DOWN PERIOD
I. TOTAL PAN TO BE LAND APPLIED PER WASTE STRUCTURE
1. Structure Name/Identifier (ID): Wolf
2. Current liquid volume in 25 yr./24 hr. storm storage & structural freeboard
a. current liquid level according to marker QO inches
b. designed 25 yr./24 hr. storm & structural freeboard 19.0 inches
c. line b - line a (inches in red zone) _ 19.0 inches
d. top of dike surface area according to design
(area at below structural'freeboard elevation) 329076 ft2
e, line c/12 x line d x 7.48 gallons/ft3 3897357 gallons
3. Projected volume of waste liquid produced during draw down period
f. temporary storage period according to structural design 180 days
g. volume of waste produced according to structural design 427874 ft3
h. current herd # 3700 certified herd # 3700
actual waste produced = current herd # x line g =
certified herd #
i. volume of wash water according to structural design
j. excess rainfall over evaporation according to design
k. (lines h + i + j) x 7.48 x 30 days/line f=
4. Total PAN to be --land applied during draw down period
I. current waste analysis dated 7/19/2018
m. ((lines e + k)/1000) x line I =
REPEAT SECTION I FOR EACH WASTE STRUCTURE ON SITE.
(Click on the next Structure tab shown below)
427874 ft3
0 ft3
196000 ft3
777763 gallons
0.72 Ibs/1000 gal.
3366.1 Ibs. PAN
PoA (30 Day) 2/21 /00
n
PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES
30 DAY DRAW DOWN PERIOD
I. TOTAL PAN TO BE LAND APPLIED PER WASTE STRUCTURE
1. Structure Name/Identifier (ID): Pack
2. Current liquid volume in 25 yr./24 hr. storm storage & structural freeboard
a. current liquid level according to marker
b. designed 25 yr./24 hr. storm & structural freeboard
c. line b,- line a (inches in red zone) _
d. top of dike surface area according to design'
(area at below structural freeboard elevation)
e. line c/12 x line d x 7.48 gallons/ft3
3. Projected volume of waste liquid produced during draw down period
Dinches
19.0 inches
19.0 inches
331016 ftZ
3920333 gallons
f. temporary storage period according to structural design 180 days
g. volume of waste produced according to structural design 380819 ft3
h. current herd # 3600 certified herd # 3600
actual waste produced = current herd # x line g =
certified herd #
i. volume of wash water according to structural design
j. excess rainfall over evaporation according to design
k. (lines h + i + j) x 7.48 x 30 days/line f=
4. Total PAN to be land applied during draw down period
I. current waste analysis dated 7/19/2018
m. ((lines e + k)/1000) x line I =
REPEAT SECTION I FOR EACH WASTE STRUCTURE ON SITE.
(Click on the next Structure tab shown below)
380819 ft'
0 ft3
197166 ft3
720555 gallons
0.79 Ibs/1000 gal.
3666.3 Ibs. PAN
PoA (30 Day) 2/21100
II. TOTAL POUNDS OF PAN STORED WITHIN STRUCTURAL FREEBOARD AND/OR 25 YR./24
HR. STORM STORAGE ELEVATIONS IN ALL WASTE
STRUCTURES FOR FACILITY
1. Structure ID: Wolf
line m =
3366.1 lb PAN
2. Structure ID: Pack
line m =
3666.3 lb PAN
3. Structure ID:
line m =
lb PAN
4. Structure ID-
line m =
lb PAN
5. Structure ID:
line m =
lb PAN
6. Structure ID:
line m =
lb PAN
I
n. lines +2+3+4+5+6= 7032.4 lb PAN
III. TOTAL PAN BALANCE REMAINING FOR AVAILABLE CROPS DURING 30 DAY DRAW DOWN
PERIOD_ DO NOT LIST FIFI_DS TO WHICH PAN CANNOT RF APPI IFD n1IRINO THIS nn nAV PFRIOn
o. tract #
p. field #
q. crop
r acres
s. remaining IRR
2 PAN balance
(lb/acre)
L TOTAL PAN
BALANCE FOR
FIELD (lbs.)
column r x s
u. application window
Al
Wheat
26.6
56.00
1489.6
Se - Mar
A2
Wheat
22.1
56.00
12376
Se - Mar
131
Wheat
10.70 '
51.00
545.7
Se - Mar
132
Wheat
12.50
51.00
637.5
Se - Mar
B3
Wheat
17.80
51.00
907.8
Se - Mar
C1
Wheat
42.20
51.00
2152.2
Se - Mar
C2
Wheat
37.30
51 00
1902.3
Se - Mar
'State current crop ending application date or next crop application beginning date for available
receiving crops during 30 day draw down period.
v. Total PAN available for all fields (sum of column t) = 8872.7 lb. PAN
IV. FACILITY S PoA OVERALL PAN BALANCE
w. Total PAN to be land applied (line in from section II) = 7032.4 lb. PAN
x. Crop's remaining PAN balance (line v from section III) = 8872.7 lb. PAN
y. Overall PAN balance (w - x) _ -1840 lb. PAN
ine y must show as a deficit If line y does not show as a deficit, list course of action -here including pump and
aul, depopulation, herd reduction, etc. For pump & haul and herd reduction options, recalculate new PAN
ased on new information. If new fields are to be included as an option for lowering lagoon level, add these
elds to the PAN balance table and recalculate the overall PAN balance. If animal,waste Is to be hauled to
nother permitted facility, provide information regarding the herd population and lagoon freeboard levels at the
:ceiving facility.
NARRATIVE:
Irrigation onto existing spray fields will begin as weather and field conditions permit. There is sufficient land and
PAN available.
PoA (30 Day) 2/21/00