Loading...
HomeMy WebLinkAbout710102_Plan of Action_20180926;!--, - �-o I S C) zq- 5 2- ��✓�� 71-102 PLAN OF ACTION(Poa) FOR HIGH FREEBOARD AT ANIMAL FACILITIES Facility Number: 71-102 Facility Name: Wolf and Pack County: Pender Certified Operator Name: Doug Atkins Operator Number: 985738 1. Current liquid level(s) in inches as measured from the current liquid level in the lagoon to the lowest point on the top of the dam for lagoons without spillways; and from the current liquid level in the lagoon to the bottom of the spillway for lagoons with spillways. Lagoon Name/ID Spillway(Y or N): Level(inches): Lagoon 1 Lagoon 2 Lagoon 3 Lagoon 4 Lagoon 5 Wolf Pack no no 0 10 2. Check all applicable items Liquid level is within the designed structural freeboard elevations of one or more structures. Five and 30 day Plans of Action are attached. Hydraulic and agronomic balances are within acceptable ranges. XXXX Liquid level is within the 25 year 24 hour storm elevations for one or more structures. A 30 day Plan of Action is attached. Agronomic balance is within acceptable range. Waste is to be pumped and hauled to off site locations. Volume and PAN content of waste to be pumped and hauled is reflected in section I'll tables. Included within this plan is a list of the proposed sites with related facility numbers, number of acres and receiving crop information. Contact and secure approval from the DWQ prior to transfer of waste to a site not covered in the facility's CAWMP. Operation will be partially or fully depopulated. *Attach a complete schedule with corresponding animal units and dates fro depopulation *if animals are to be moved to another permitted facility, provide facility number, lagoon freeboard levels and herd population for the receiving facility 3. Earliest possible date to begin land application of waste: 9/25/2018 I hereby certify that I have reviewed the information listed above and included within the attached Plan of Action, and to the best of my knowledge and ability, the information is accurate and correct. Pure Country'Farms Phone: Facility Owner/Manager (print) Date: Facility Owner/Manager (signature) 910-285-1357 9/25/2018 PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES 30 DAY DRAW DOWN PERIOD I. TOTAL PAN TO BE LAND APPLIED PER WASTE STRUCTURE 1. Structure Name/Identifier (ID): Wolf 2. Current liquid volume in 25 yr./24 hr. storm storage & structural freeboard a. current liquid level according to marker QO inches b. designed 25 yr./24 hr. storm & structural freeboard 19.0 inches c. line b - line a (inches in red zone) _ 19.0 inches d. top of dike surface area according to design (area at below structural'freeboard elevation) 329076 ft2 e, line c/12 x line d x 7.48 gallons/ft3 3897357 gallons 3. Projected volume of waste liquid produced during draw down period f. temporary storage period according to structural design 180 days g. volume of waste produced according to structural design 427874 ft3 h. current herd # 3700 certified herd # 3700 actual waste produced = current herd # x line g = certified herd # i. volume of wash water according to structural design j. excess rainfall over evaporation according to design k. (lines h + i + j) x 7.48 x 30 days/line f= 4. Total PAN to be --land applied during draw down period I. current waste analysis dated 7/19/2018 m. ((lines e + k)/1000) x line I = REPEAT SECTION I FOR EACH WASTE STRUCTURE ON SITE. (Click on the next Structure tab shown below) 427874 ft3 0 ft3 196000 ft3 777763 gallons 0.72 Ibs/1000 gal. 3366.1 Ibs. PAN PoA (30 Day) 2/21 /00 n PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES 30 DAY DRAW DOWN PERIOD I. TOTAL PAN TO BE LAND APPLIED PER WASTE STRUCTURE 1. Structure Name/Identifier (ID): Pack 2. Current liquid volume in 25 yr./24 hr. storm storage & structural freeboard a. current liquid level according to marker b. designed 25 yr./24 hr. storm & structural freeboard c. line b,- line a (inches in red zone) _ d. top of dike surface area according to design' (area at below structural freeboard elevation) e. line c/12 x line d x 7.48 gallons/ft3 3. Projected volume of waste liquid produced during draw down period Dinches 19.0 inches 19.0 inches 331016 ftZ 3920333 gallons f. temporary storage period according to structural design 180 days g. volume of waste produced according to structural design 380819 ft3 h. current herd # 3600 certified herd # 3600 actual waste produced = current herd # x line g = certified herd # i. volume of wash water according to structural design j. excess rainfall over evaporation according to design k. (lines h + i + j) x 7.48 x 30 days/line f= 4. Total PAN to be land applied during draw down period I. current waste analysis dated 7/19/2018 m. ((lines e + k)/1000) x line I = REPEAT SECTION I FOR EACH WASTE STRUCTURE ON SITE. (Click on the next Structure tab shown below) 380819 ft' 0 ft3 197166 ft3 720555 gallons 0.79 Ibs/1000 gal. 3666.3 Ibs. PAN PoA (30 Day) 2/21100 II. TOTAL POUNDS OF PAN STORED WITHIN STRUCTURAL FREEBOARD AND/OR 25 YR./24 HR. STORM STORAGE ELEVATIONS IN ALL WASTE STRUCTURES FOR FACILITY 1. Structure ID: Wolf line m = 3366.1 lb PAN 2. Structure ID: Pack line m = 3666.3 lb PAN 3. Structure ID: line m = lb PAN 4. Structure ID- line m = lb PAN 5. Structure ID: line m = lb PAN 6. Structure ID: line m = lb PAN I n. lines +2+3+4+5+6= 7032.4 lb PAN III. TOTAL PAN BALANCE REMAINING FOR AVAILABLE CROPS DURING 30 DAY DRAW DOWN PERIOD_ DO NOT LIST FIFI_DS TO WHICH PAN CANNOT RF APPI IFD n1IRINO THIS nn nAV PFRIOn o. tract # p. field # q. crop r acres s. remaining IRR 2 PAN balance (lb/acre) L TOTAL PAN BALANCE FOR FIELD (lbs.) column r x s u. application window Al Wheat 26.6 56.00 1489.6 Se - Mar A2 Wheat 22.1 56.00 12376 Se - Mar 131 Wheat 10.70 ' 51.00 545.7 Se - Mar 132 Wheat 12.50 51.00 637.5 Se - Mar B3 Wheat 17.80 51.00 907.8 Se - Mar C1 Wheat 42.20 51.00 2152.2 Se - Mar C2 Wheat 37.30 51 00 1902.3 Se - Mar 'State current crop ending application date or next crop application beginning date for available receiving crops during 30 day draw down period. v. Total PAN available for all fields (sum of column t) = 8872.7 lb. PAN IV. FACILITY S PoA OVERALL PAN BALANCE w. Total PAN to be land applied (line in from section II) = 7032.4 lb. PAN x. Crop's remaining PAN balance (line v from section III) = 8872.7 lb. PAN y. Overall PAN balance (w - x) _ -1840 lb. PAN ine y must show as a deficit If line y does not show as a deficit, list course of action -here including pump and aul, depopulation, herd reduction, etc. For pump & haul and herd reduction options, recalculate new PAN ased on new information. If new fields are to be included as an option for lowering lagoon level, add these elds to the PAN balance table and recalculate the overall PAN balance. If animal,waste Is to be hauled to nother permitted facility, provide information regarding the herd population and lagoon freeboard levels at the :ceiving facility. NARRATIVE: Irrigation onto existing spray fields will begin as weather and field conditions permit. There is sufficient land and PAN available. PoA (30 Day) 2/21/00