Loading...
HomeMy WebLinkAbout310057_Plan of Action_20180926PLAN OF ACTION(Poa) FOR HIGH FREEBOARD AT ANIMAL FACILITIES Facility Number: 31-57 County: Duplin Facility Name: Turner Sow Certified Operator Name: Kendall Huffman Operator Number: 16819 1. Current liquid- level(s) in inches as measured from the current liquid level in the lagoon to the lowest point on the top of the dam for lagoons without spillways; and from the current liquid level in the lagoon to the bottom of the spillway for lagoons with spillways. Lagoon Name/ID: Spillway(Y or N): Level(inches): Lagoon 1 Lagoon 2 Lagoon 3 Lagoon 4 Turner 1 Turner 2 Turner 3 Turner 4 no no no no 21 10 9 27 2. Check all applicable items Liquid level is within the designed structural freeboard elevations of one or more structures. Five and 30 day Plans of Action are attached. Hydraulic and agronomic balances are within acceptable ranges. XXXX Liquid level is within the 25 year 24 hour storm elevations for one or more structures. A 30 day Plan of Action is attached. Agronomic balance is within acceptable range. Waste is to be pumped and hauled to off site locations. Volume and PAN content of waste to be pumped and hauled is reflected in section III tables. Included within this plan is a list of the proposed sites with related facility numbers, number of acres and receiving crop information. Contact and secure approval from the DWQ prior to transfer of waste to a site not covered in the facility's CAWMP. Operation will be partially or fully depopulated. *Attach a complete schedule with corresponding animal units and dates fro depopulation *if animals are to be moved to another permitted facility, provide facility number, lagoon freeboard levels and herd population for the receiving facility 3. Earliest possible date to begin land application of waste: 9/25/2018 'I hereby certify that I have reviewed the information listed above and included within the attached Plan of Action, and to the best of my knowledge and ability, the information is accurate and correct. Turner Farms Phone: 910-285-1357 Facility Owner/Manager (print) Date: 9/25/2018 Facility Owner/Manager (signature) PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES 30 DAY DRAW DOWN PERIOD I. TOTAL PAN TO BE LAND APPLIED PER WASTE STRUCTURE 1. Structure Name/Identifier (ID): Tumer 2 - 2. Current liquid volume in 25 yr./24 hr. storm storage & structural freeboard a. current liquid�lbvel according to marker 10.0 inches b. designed 25 yr./24 hr. storm & structural freeboard 19.0 inches c. line b - line a (inches in red zone) = 9.0 inches d. top of dike surface area according to design (area at below structural freeboard elevation)' 128250 ftz e. line c/12 x line d x 7.48 gallons/ft3 719483 gallons 3. Projected volume of waste liquid produced during draw down period f. temporary storage period according to structural design 180 days g., volume of waste produced, according to structural design 112826 ft3 h. current herd # 1746 certified herd # 1746 actual waste produced, = current herd # x line g = 112826 ft3 certified herd # i. volume of wash water according to structural design Oft3 j. excess rainfall over evaporation according to design 74813 ft3 k. (lines h + i + j) x 7.48 x 30 days/line f= 233923 gallons 4. Total PAN to be land applied during draw down period I. current waste analysis dated 7/19/2018 1.36 Ibs/1000 gal. •m. ((lines e + k)/1000) x line 1 = 1296.6 lbs. PAN REPEAT SECTION I.FOR EACH WASTE STRUCTURE ON SITE. (Click on the next Structure tab shown below) PoA, (30 Day) 2/21 /00 PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES 30 DAY DRAW DOWN PERIOD I. TOTAL PAN TO BE LAND APPLIED PER WASTE STRUCTURE 1. Structure Name/Identifier (ID): ITumer 3 2. Current liquid volume in 25 yr./24 hr. storm storage & structural freeboard a. current liquid level according to marker 9.0 inches b. designed 25 yr./24 hr. storm & structural freeboard 19.0 inches c. line b - line a (inches in red zone) = 10.0 inches d. top of dike surface area according to design (area at below structural freeboard elevation) 213750 ft� e. line c/12 x line d x 7.48 gallons/ft3 1332375 gallons 3. Projected volume of waste liquid produced during draw down period f. temporary storage period according to structural design 180 days g. volume of waste produced according to structural design 1 276801 Jft3 h. current herd # 2590 certified herd # 2590 actual waste produced = current herd # x line g = 276801 ft' certified herd # i. volume of wash water according to structural design Oft3 j. excess rainfall over evaporation according to design 124688 ft3 k. (lines h + i + j) x 7.48 x 30 days/line f= 500523 gallons 4. Total PAN to be land applied during draw down period I. current waste analysis dated 7/19/2018 1.56 Ibs/1000'gal. m. ((lines e + k)/1000) x line 1= 2859.3 lbs. PAN REPEAT SECTION I FOR EACH WASTE STRUCTURE ON SITE. (Click on the next Structure tab shown below) PoA (30 Day) 2/21 /00 II. TOTAL POUNDS OF PAN STORED WITHIN STRUCTURAL FREEBOARD AND/OR 25 YR./24 HR. STORM STORAGE ELEVATIONS IN ALL WASTE STRUCTURES FOR FACILITY • 1. Structure ID: Turner 2 line m = 1296.6 lb PAN 2. Structure ID: Turner 3 line m = 2859.3 lb PAN 3. Structure ID: line m = lb PAN 4. Structure ID: line m = lb PAN 5. Structure ID: line m = lb PAN . 6. Structure ID: line m = lb PAN In. linesl+2+3+4+5+6= 4156.0lbPAN III. TOTAL PAN BALANCE REMAINING FOR AVAILABLE CROPS DURING 30 DAY DRAW DOWN PERIOD_ DO NOT LIST FIFI _DS TO WHICH PAN CANNOT RF APPI IFn ni IRINr. THIS 3n nAv PFRInn o. tract # p. field # q. crop r. acres s. remalning IRR 2 PAN balance (lb/acre) t TOTAL PAN BALANCE FOR FIELD (lbs.) column r x s u. applicabon window' Pivot 1 Bermuda 43 135.00 5805.0 Apr - Se Pivot 2 Bermuda 26 20.00 520.0 Apr - Se 7-8 Bermuda 13.00 80.00 1040.0 Apr - Se 'State current crop ending application date or next crop application beginning date for available receiving crops during 30 day draw down period. v. Total PAN available for all fields (sum of column t) = 7365.0 lb. PAN IV. FACILITY S PDA OVERALL PAN BALANCE w. Total PAN to be land applied (line n from section II) = 4156.0 lb. PAN x. Crop's remaining PAN balance (line v from section III) = 7365.0 lb. PAN y. Overall PAN balance (w - x) = -3209 lb. PAN ine y must show as a deficit. If line y does not show as a deficit, list course of action here including pump and aul, depopulation, herd reduction, etc. For pump & haul and herd reduction options, recalculate new PAN ased on new information. If new fields are to be included as an option for lowering lagoon level, add these elds to the PAN balance table and recalculate the overall PAN balance. If animal waste is to be hauled to nother permitted facility, provide information regarding the herd population and lagoon freeboard levels at the :ceiving facility. NARRATIVE: Irrigation onto existing spray fields will begin as weather and field conditions permit. There is sufficient land and PAN available. PoA (30 Day) 2/21 /00