HomeMy WebLinkAbout710072_Plan of Action_20181001PLAN OF ACTION(Poa) FOR HIGH FREEBOARD AT ANIMAL FACILITIES Facility Number: 71-72 Facility Name: Ponderosa Certified Operator Name: Donald Hall County: Pender Operator Number: 16453 7/- 7z 1. Current liquid level(s) in Inches as measured from the current liquid level in the lagoon to the lowest point on the top of the dam for lagoons without spillways; and from the current liquid level in the lagoon to the bottom of the spillway for lagoons with spillways. Lagoon Name/ID: Spillway(Y or N): Level(inches): Lagoon 1 Lagoon 2 Lagoon 3 Lagoon 4 Lagoon 5 Ponderosa no 12 2. Check all applicable items Liquid level is within the designed structural freeboard elevations of one or more structures. Five and 30 day Plans of Action are attached. Hydraulic and agronomic balances are within acceptable ranges. XXXX Liquid level is within the 25 year 24 hour.storm elevations for one or more structures. A 30 day Plan of Action is attached. Agronomic balance is within acceptable range. Waste is to be pumped and hauled to off site locations. Bolume and PAN content of waste to be pumped and hauled is reflected in section III tables. Included within this plan is a list of the proposed sites with related facility numbers, number of acres and receiving crop information. Contact and secure approval from the DWQ prior to transfer of waste to a site not covered in the facility's CAWMP. Operation will be partially or fully depopulated. `Attach a complete schedule with corresponding animal units and dates fro depopulation *if animals are to be moved to another. permitted facility, provide facility number, lagoon freeboard levels and herd population for the receiving facility 3. Earliest possible date to begin land application of waste: 10/2/2018 I hereby certify that I have reviewed the Information listed above and included within the attached Plan of Action, and to the best of my knowledge and ability, the information is accurate and correct. Donald Ha Phone: 910-520-3555 Facility Owner/Manager (print) Date: Facility Owner/Manager (signature)- r PLAN OF ACTION (POA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES 30 DAY DRAW DOWN PERIOD I. TOTAL PAN TO BE LAND APPLIED PER WASTE STRUCTURE 1. Structure Name/Identifier (ID): Ponderosa 2. Current liquid volume in 25 yr./24 hr. storm storage & structural freeboard a. current liquid level according to marker b. designed 25 yr./24 hr. storm & structural freeboard c. line b - line a (inches in red zone) = d. top of dike surface area according to design (area at below structural freeboard elevation) e. line c/12 x line d x 7.48 gallons/ft3 3. Projected volume of waste liquid produced during draw down period 12.0 inches 19.0 inches 7.0 inches 1020360 ftZ 4452171 gallons f. temporary storage period according to structural design 180 days g. volume of waste produced according to structural design 495720 ft3 h. current herd # 3672 certified herd #1 3672 actual waste produced = current herd # x line g = 495720 ft' certified herd # ` I. volume of wash water according to structural design ft3 j. excess rainfall over evaporation according to design 73500 ft3 k. (lines h + i + j) x 7.48 x 30 days/line f= 709628 gallons 4. Total PAN to be land applied during draw down period I. current.waste analysis dated 8/7/20181 1.23 Ibs/1000 gal. m. ((lines e + k)/1000) x line I = 6349.0 lbs. PAN REPEAT SECTION I FOR EACH WASTE STRUCTURE ON SITE. (Click on the next Structure tab shown below) PoA (30 Day) 2/21/00 � e , II. TOTAL POUNDS OF PAN STORED WITHIN STRUCTURAL FREEBOARD AND/OR 25 YR./24 HR. STORM STORAGE ELEVATIONS IN ALL WASTE STRUCTURES FOR FACILITY 1. Structure ID: , Ponderosa line m = 6349.0 lb PAN 2. Structure ID: line m = lb PAN 3. Structure ID: line m = lb PAN 4. Structure ID: line m = Ib PAN 5. Structure ID: line m = lb PAN 6. Structure ID: line m = lb PAN n.lines 1+2+3+4+5+6= 6349.0lbPAN III. TOTAL PAN BALANCE REMAINING FOR AVAILABLE CROPS DURING 30 DAY DRAW DOWN PrRirin_ nn NnT I IST t:lr-I nc T!n VUu1Pu o11►1 ^A►IL1^1 — —.., o. tract # p. field # q. crop r. acres .-. —.. — — s, remaining IRR 2 PAN balance (lb/acre) — - v —. - — t. TOTAL PAN BALANCE FOR FIELD (Ibs.) column r x a — I r G R I V IJ. u, application wlndowl Zonal Pull1&2 Bermuda 7.16 200.00 1432.0 Zone 2 Pull 3&4 Bermuda 12.45 200.00 2490.0 Zone 3 Pull 6 Bermuda 4.36 200.00 872.0 Tract 2974 Corbett Wheat 24.40 102.00 2488.8 State current crop ending application date or next crop application beginning date for available receiving crops during 30 day draw down period. v. Total PAN available for all fields (sum of column t) = 7282.8 lb. PAN IV. FACILITY'S PoA OVERALL PAN BALANCE w. Total PAN to be land applied (line n from section 11) = 6349.0 lb. PAN x. Crop's remaining PAN balance (line v from section III) = 7282.8 lb. PAN y. Overall PAN balance (w - x) _ -934 Ib. PAN ine y must show as a deficit. If line y does not show as a deficit, list course of action here including pump and aul, depopulation, herd reduction, etc. For pump & haul and herd reduction options, recalculate new PAN base n new information. If new fields are to be Included as an option for lowering lagoon level, add these fields to thi AN balance table and recalculate the overall PAN balance. If animal waste is to be hauled to another permitter Icility, provide information regarding the herd population and lagoon -freeboard levels at the receiving facility. IVAm" I Ivt: Irrigation onto -existing spray fields will continue as weather and field conditions permit. PoA (30 Day) 2/21100 r PLAN OF ACTION(Poa) FOR HIGH FREEBOARD AT ANIMAL FACILITIES Facility Number: 71-31 Facility Name: Hall 1 & 2 Certified Operator Name: Donald Hall County: Pender Operator Number: 16453 1. Current liquid level(s) in inches as measured from the current liquid level in the lagoon to the lowest point on the top of the dam for lagoons without spillways; and from the current liquid level in the lagoon to the bottom of the spillway for lagoons with spillways. Lagoon Name/I D: Spillway(Y or N): Level(inches): Lagoon 1 Lagoon 2 Lagoon 3 Lagoon 4 Lagoon 5 1 2 no no 12 12 2. Check all applicable items Liquid level is within the designed structural freeboard elevations of one or more structures. Five and 30 day Plans of Action are attached. Hydraulic and agronomic balances are within acceptable ranges. XXXX Liquid level is within the 25 year 24 hour storm elevations for one or more structures. A 30 day Plan of Action is attached. Agronomic balance is within acceptable range. Waste is to be pumped and hauled to off site locations. Bolume and PAN content of waste to be pumped and hauled is reflected in section III tables. Included within this plan is a list of the proposed sites with related facility numbers, number of acres and receiving crop information. Contact and secure approval from the DWQ prior to transfer of waste to a site not covered in the facility's CAWMP. Operation will be partially or fully depopulated. "Attach a complete schedule with corresponding animal units and dates fro depopulation 'if animals are to be moved to another permitted facility, provide facility number, lagoon freeboard levels and herd population for the receiving facility 3. Earliest possible date to begin land application of waste: 10/2/2018 I hereby certify that I have reviewed the information listed above and included within the attached Plan of Action, and to the best of my knowledge and ability, the information is accurate and correct. Donald Hall �� %c ( phone: 910 520-3555 FaLlity Owner/Manager (print) Date: Facility Owner/Manager (signature) PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES 30 DAY DRAW DOWN PERIOD I. TOTAL PAN TO BE LAND APPLIED PER WASTE STRUCTURE 1. Structure Name/identifier (ID):. Hall 1 2. Current liquid volume in 25 yr./24 hr. storm storage & structural freeboard a. current liquid level according to marker 12.0 inches b. designed 25 yr./24 hr. storm & structural freeboard 19.6 inches c. line b - line a (inches in red zone) = 7.0 inches d. top of dike surface area according to design (area at below structural freeboard elevation) 497083 ftz e. line c/12 x line d x 7.48 gallons/ft' 2168939 gallons 3. Projected volume of waste liquid produced during draw down period f. temporary storage period according to structural design 180 days g. volume of waste produced according to structural design 330480 ft3 h. current herd # 2448 certified herd # 2448 actual waste produced = current herd # x line g = 330480 ft' certified herd # I. volume of wash water according to structural design j. excess rainfall over evaporation according to design k. (lines h + i + j) x 7.48 x 30 days/line f= 4. Total PAN to be land applied during draw down period I. current waste analysis dated 8/7/2018 m. ((lines e + k)/1000) x line I = REPEAT SECTION I FOR EACH WASTE STRUCTURE ON SITE. (Click on the next Structure tab shown below) Oft, 37186 ft3 458359 gallons 1.11 Ibs/1000 gal. 2916.3 lbs. PAN PoA (30 Day) 2/21/00 4 1 PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES 30 DAY DRAW DOWN PERIOD I. TOTAL PAN TO BE LAND APPLIED PER WASTE STRUCTURE ' 1. Structure Name/Identifier (ID): Hall 2 2. Current liquid volume in 25 yr./24 hr. storm storage & structural freeboard a. current liquid level according to marker b. designed 25 yr.124 hr. storm & structural freeboard c. line b - line a (inches in red zone) = d. top of dike surface area according to design (area at below structural freeboard elevation) e. line c/12 x line d x 7.48 gallons/ft3 3. Projected volume of waste liquid produced during draw down period 12.0 inches 19.0 inches 7.0 inches 497083 1ftZ 2168939 gallons f. temporary storage period according to structural design 180 days g. volume of waste produced according to structural design 330480 ft3 h. current herd # 2448 certified herd #1 2448 actual waste produced = current herd # x line g = certified herd # i. volume of wash water according to structural design j. excess rainfall over evaporation according to design k, (lines h + i + j) x 7.48 x 30 days/line f= 4. Total PAN to be land applied during draw down period I. current waste analysis dated 8/7/2018 m. ((lines e + k)/1000) x line l = REPEAT SECTION I FOR EACH WASTE STRUCTURE ON SITE. (Click on the next Structure tab shown below) PoA (30 Day) 2/21/00 330480 ft' f 01ft3 37188 ft3 458359 gallons 1.13 Ibs/1000 gal. 2968.8 Ibs. PAN