PLAN OF ACTION
Poa FOR
HIGH FREEBOARD
AT ANIMAL
FACILITIES
Facility Number:
31-60
County:
DUPLIN
Facility Name:
SUNSHINE NURSERY
Certified Operator Nam
MARSHALL H PHILLIPS
O erator Number.
28714
1. Current liquid level(s) in inches as measured from the current liquid level in the lagoon to the
lowest point on the top of the dam for lagoons without spillways; and from the current liquid level
in the lagoon to the bottom of the s illway for lagoons
with spillways.
La oon 1
Lagoon 2
Lagoon 3
Lagoon 4
5
Lagoon Name/ID:
SS2
..Lagoon
S illwa or N :
N
Level inches :
8
2. Check all
applicable items
Liquid level is within the designed structural freeboard elevations of one or more structures.
Five and 30 day Plans of Action are attached. H draulic and agronomic balances are
within acceptable
ranges.
X
Liquid level is within the 25 year 24 hour storm elevations for one or more structures. A
30 day Plan of Action is attached. Agronomic balance is within acceptable range.
Waste is to be pumped and hauled to off site locations. Bolume and PAN content of waste
to be pumped and hauled is reflected in section III tables. Included within this plan is a list
of the proposed sites with related facility numbers, number of acres and receiving crop
information. Contact and secure approval from the DWQ p'or to transfer of waste to a site
not covered in the facility's CAWMP.
Operation will be partially or fullydepopulated.
*Attach a complete schedule with corresponding animal units and dates fro depopulation
*if animals are to be moved to another permitted facility, provide facility number, lagoon
freeboard levels and herd population for the receiving facility
3. Earliest possible date to begin land application of waste: c
onditions permit
I hereby certi that I have reviewed the information listed above and included within the
attached Plan of Action and to the best of mV knowled
a and abili
the information is
accurate and correct.
c
Z
C
Phone:
Facility Owner/Manager (print)
������� � _ - ����i�
��
PLAN OF ACTION PoA FOR HIGH FREEBOARD AT ANIMAL FACILITIES
30 DAY DRAW DOWN PERIOD
I. TOTAL PAN TO BE LAND APPLIED PER WASTE STRUCTURE
1.
Structure Name/Identifier (ID):
SS2
2.
Current liquid volume in 25 r./24 hr. storm storage & structural freeboard
a,
current liquid level according to marker
8.0
inches
b.
designed 25 r./24 hr. storm & structural freeboard
10.0
inches
c.
line b - line a (inches in red zone)=
2.0
inches
d.
top of dike surface area according to design
area at below structural freeboard elevation
40800
ft2
e.
line c/12 x lined x 7.48 gallons/f:3
50864
gallons
3.
Proiected volume of waste liquid produced during draw down period
f.
tem ora stora a period according to structural design
180
days
g.
volume of waste produced according to structural desi n
41027
f:3
h.
current herd #
5000
certified herd #
5600
actual waste
produced = current herd # x line g=
36631
ft3
certified herd #
i.
volume of wash water according to structural design
0
ft3
'.
excess rainfall over evaporation according to desi n
23800
ft3
k.
lines h + i + " x 7.48 x
30
days/line f=
75338
gallons
4.
Total PAN to be land applied durina draw down eriod
I.
current waste analysis dated
8.21.18
0.72
Ibs/1000 gal.
m.
fflines e + k /1000 x line 1=
90.9
lbs. PAN
REPEAT SECTION
I FOR
EACH WASTE STRUCTURE ON
SITE.
Click on the next Structure tab shown below)
PoA (30 Day) 2/21/00I�
11. TOTAL POUNDS OF PAN STORED WITHIN STRUCTURAL FREEBOARD AND/OR 25 YRJ24
HR. STORM STORAGE ELEVATIONS IN ALL WASTE STRUCTURES FOR FACILITY
1. Structure ID:
line m =
2. Structure ID:
SS2
line m =,
90.9
3. Structure ID:
line m =
4. Structure ID:
line m =
5. Structure ID:
line m =
6. Structure ID:
line m =
n.
lines 1 +2+3+4+5+6=
90.9
III. TOTAL PAN BALANCE REMAINING FOR AVAILABLE CROPS
DURING 30 DAY
DRAW DOW
PERIOD. DO NOT LIST FIELDS TO WHICH PAN CANNOT BE APPLIED DURING THIS 30 DAY P
o. tract #
p. field #
q. crop
r. acres
s. remaining
IRR-2 PAN
balance Qb/acre)
t TOTAL PAN
BALANCE FOR
FIELD (Ibs.)
column r x s
1625
2-AW
WHEAT
16.87
125.40
2115.5
'State current crop ending application date or next crop application beginning date for available
receiving cro s during 30 day draw down period.
Iv. Total PAN available for all fields (sum of column t)
=
2115.5
IV. FACILITY'S PoA OVERALL PAN BALANCE
PoA (30 Day) 2/21 /00
S'j,-Fj -,4Pl4L
w. Total PAN to be land applied (line n from section II) = 90.9
i x. Cro 's remaining PAN balance (line v from section III) = 2115.5
y. Overall PAN balance (w - x) _ -2025
Line y must show as a deficit. If line y does not show as a deficit, list course of action here including pump and haul,
depopulation, herd reduction, etc. For pump & haul and.herd reduction options, recalculate new PAN based on new
information. If new fields are to be included as an option for lowering lagoon level, add these fields to the PAN balance
table and recalculate the overall PAN balance. If animal waste is to be hauled to another permitted facility, provide
information regarding the herd population and lagoon freeboard levels at the receiving facility.
NAKKAJ 1VF' I I I
Irrigation onto existing spray fields will continue as weather and field conditions
pumping if needed.
PoA (30 Day) 2/21/00
land is available for