HomeMy WebLinkAbout100009_Plan of Action_20181001PLAN OF ACTION(Poa) FOR HIGH FREEBOARD AT ANIMAL FACILITIES
Facility Number: 10 9 County: Brunswick
Facility Name: Boyd and Sons Pig Nursery
Certified Operator Name: Timmy Evans, Operator Number:
1. Current liquid level(s) in inches as measured from the current liquid level in the lagoon to the
lowest point on the top of the dam for lagoons without spillways; and from the current liquid level
in the lagoon to the bottom of the spillway for lagoons with spillways.
Lagoon Name/ID
Spillway(Y or N):
Level(inches):
Lagoon Lagoon 2 Lagoon 3 Lagoon 4 Lagoon 5
1
N
17
2. Check all applicable items
Liquid level is within the designed structural freeboard elevations of one or more structures.
Five and 30 day Plans of Action are attached. Hydraulic and agronomic balances are
within acceptable ranges.
XXX Liquid level is within the 25 year 24 hour storm elevations for one or more structures. A
.30 day Plan of Action is attached. Agronomic balance is within acceptable range.
Waste is to be pumped and hauled to off site locations. Bolume and PAN content of waste
to be pumped and hauled is reflected in section III tables. Included within this plan is a list
of the proposed sites with related facility numbers, number of acres and receiving crop
information. Contact and secure approval from the DWQ prior to transfer of waste to a site
not covered in the facility's CAWMP.
Operation will be partially or fully depopulated.
*Attach a complete schedule with corresponding animal units and dates for depopulation
*if animals are to be moved to another permitted facility, provide facility number, lagoon
freeboard levels and herd population for the receiving facility
3. Earliest possible date to begin land application of waste:
I hereby certify that I have reviewed the information listed above and included within the
attached Plan of Action, and to the best of my knowledge and ability, the information is
accurate and correct.
Timmy Evans Phone:
Facility Owner/Manager (print)
Timmy Evans Date: 9/27/2018
Facility Owner/Manager (signature)
rr
II. TOTAL POUNDS OF PAN STORED WITHIN STRUCTURAL FREEBOARD AND/OR 25 YR./24
HR. STORM STORAGE ELEVATIONS IN ALL WASTE STRUCTURES FOR FACILITY -
1.
Structure ID: Lagoon#1
line m =
105.7 lb PAN
2
Structure ID:
line m =
lb PAN
3.
Structure ID:
line m =
lb PAN
4.
Structure ID:
line m =
-lb PAN
5.
Structure ID:
line m =
lb PAN
6.
Structure ID:
line m =
lb PAN
n.lines 1+2+3+4+5+6= 105.7lbPAN
III. TOTAL PAN BALANCE REMAINING FOR AVAILABLE CROPS DURING 30 DAY DRAW DOWN
PERIOD. DO NOT LIST FIELDS TO WHICH PAN CANNOT BE APPLIED DURING THIS 30 DAY PERIOD.
o. tract #
p. field #
q. crop
r. acres
s. remaining IRR
2 PAN balance
(lb/acre)
t TOTAL PAN
BALANCE FOR
FIELD (Ibs.)
column r x s
u. application window'
501
1
Small Grain Overseed
1.30
50.00
65.0
10/1-3/31
501
2
Small Grain Overseed
1.30
50.00
65.0
10/1-3/31
.501
3
Small Grain Overseed
1.30
50.00
65.0
10/1-3/31
501
4
Small Grain Overseed
1.30
50.00
65.0
10/1-3/31
501
5
Small Grain Overseed
1.30
50.00
65.0
10/1-3/31
501
6
Small Grain Overseed
1.30
50.00
65.0
10/1-3/31
501
7
Small Grain Overseed
1.30
50.00
65.0
10/1-3/31
501
8
Small Grain Overseed
3.00
50.00
150.0
10/1-3/31
783
9
Small Grain Overseed
7.50
50.00
375.0
10/1-3/31
'State current crop ending application date or next crop application beginning date for available
receiving crops during 30 day draw down period.,
v. Total PAN available for all fields (sum of column t) = 980.0 Ib. PAN
IV. FACILITY'S PoA OVERALL PAN BALANCE
w. Total PAN to be land applied (line n from section II) = 105.7 lb. PAN
x. Crop's remaining PAN balance (line v from section III)' = 980.0 lb. PAN
y. Overall PAN balance (w - x) _ -874 lb. PAN
PoA (30 Day) 2/21/00
Line y must show as a deficit. If line y does not show as a deficit, list course of action here including pump and
haul, depopulation, herd reduction, etc. For pump & haul and herd reduction options, recalculate new PAN
based -on new information. If new fields are to be included as an option for lowering lagoon level, add these
fields to the PAN balance table and recalculate the overall PAN balance. If animal waste is to be hauled to
another permitted facility, provide information regarding the herd population and lagoon freeboard levels at the
receiving facility.
Mr. Evans called to report his lagoon on 9/25/18. This POA was completed by Sam Edwards Environmental
Specalist with NCDA/Soil and Water on 9/27/2018. The 5 day POA was waived by DWR because of Hurricane
Florence. This storm dumped substantial amounts of rain. Mr. Evans was evacuated from the area and was not
allowed back until 9/25/18.
PoA (30 Day) 2/21/00
PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES
30 DAY DRAW DOWN PERIOD
I. TOTAL PAN TO BE LAND APPLIED PER WASTE STRUCTURE
1. Structure Name/Identifier (ID): Lagoon #1
2. Current liquid volume in 25 yr./24 hr. storm,storage & structural freeboard "
a. current liquid level according to marker
b. designed 25 yr./24 hr. storm & structural freeboard
c. line b - line a (inches in red zone) _
d. top of dike surface area according to design
(area at below structural freeboard elevation)
e. line c/12 x line d x 7.48 gallons/ft3
3. Projected volume of waste liquid produced during draw down period
17.0 inches
20.0 inches
3.0 inches
27606 ft2
51623 gallons
f. temporary storage period according to structural design 180 days
g. volume of waste produced according to structural design 26023 1ft3
h. current herd-# 3552 certified herd # 3552
actual waste produced = current herd #. x line g =
certified herd #
i. volume of wash water according to structural design
j. excess rainfall over evaporation according to design
k. (lines h + i + j) x, 7.48 x 30 days/line f=
4. Total PAN to be land applied during draw down period
I. current waste analysis dated 1 9/10/2018
m. ((lines e + k)/1000) x line I =
REPEAT SECTION I FOR EACH WASTE STRUCTURE ON SITE.
(Click on the next Structure tab shown below)
26023 ft'
0 ft3
17325 ft3
54041 gallons
1.00 Ibs/1000 gal.
105.7 Ibs. PAN
PoA (30 Day) 2/21 /00