Loading...
HomeMy WebLinkAbout310138_Plan of Action_20180928Aqq 3l-136 PLAN OF ACTION(Poa) FOR HIGH ,FREEBOARD AT ANIMAL FACILITIES Facility Number: 31-138 County: Duplin Facility Name: Mike Chambers Farm Certified Operator Name: Mike Chambers Operator Number: AWA 17182 1. Current liquid level(s) in inches as measured from the current liquid level in the lagoon to the lowest point on the top of the dam for lagoons without spillways; and from the current liquid level in the lagoon to the bottom of the spillway for lagoons with spillways. Lagoon Name/ID Spillway(Y or N): Level(inches): Lagoon 1 Lagoon 2 Lagoon 3 Lagoon 4 Lagoon 5 1 2 N N 4 5 2. Check all applicable items X Liquid level is within the designed structural freeboard elevations of one or more structures. Five and 30 day Plans of Action are attached. Hydraulic and agronomic balances are within acceptable ranges. X Liquid level is within the 25 year 24 hour storm elevations -for one or more structures. A 30 day Plan of Action is attached. Agronomic balance is within acceptable range. Waste is to be pumped and hauled to off site locations. Bolume and PAN content of waste to be pumped and hauled is reflected in section III tables. Included within this plan is a list of the proposed sites with related facility numbers, number of acres and receiving crop information. Contact and secure approval from the DWQ prior to transfer of waste to a site not covered in the facility's CAWMP. Operation will be partially or fully depopulated. *Attach a complete schedule with corresponding animal units and dates for depopulation "if animals are to be moved to another permitted facility, provide facility number, lagoon freeboard levels and herd population for the receiving facility 3. Earliest possible date to begin land application of waste: 9/20/18 I hereby certify that I have reviewed the information listed above and included within the attached Plan of Action, and to the best of my knowledge and ability, the information is accurate and correct. Mike Chambers Phone: ` Facility Owner/Manager (print) bate: Facility Owner/Manager (signature) ©C lLU N is , 9/24/18 II. TOTAL POUNDS OF PAN STORED WITHIN STRUCTURAL FREEBOARD AND/OR 25 YR./24 HR. STORM STORAGE ELEVATIONS IN ALL WASTE STRUCTURES FOR FACILITY 1. Structure ID: Lagoon 1 line m = 1587.6 lb PAN 2. Structure ID: Lagoon 2 line m = 936.4 lb PAN 3. Structure ID: line m = lb PAN 4. Structure ID: line m = lb PAN 5. Structure ID: line m = lb PAN 6. Structure ID: line m = lb PAN n.lines1+2+3+4+5+6= 2524.0lbPAN III. TOTAL PAN BALANCE REMAINING FOR AVAILABLE CROPS DURING 30 DAY DRAW DOWN PFRIr)n no Nr1T 1 1ST FIFI nS Tr) WHIrH PAN CANNOT RF APPI IFn nl IRINr. THIS nn nAY PFRIOD. o. tract # p. field # q. crop r, acres s. remaining IRR-2 PAN balance (lb/acre) t TOTAL PAN BALANCE FOR FIELD (lbs.) column r x s u. application window' 4 fescue 3.93 181.00 711.3 Aug -Jul 5 fescue 4.53 269.00 1218.6 Aug -Jul 6 fescue 4.61 184.00 848.2 Aug -Jul 'State current crop ending application date or next crop application beginning date for available receiving crops during 30 day draw down period. v. Total PAN available for all fields (sum of column t) = 2778.1 lb. PAN IV. FACILITY'S PoA OVERALL PAN BALANCE w. Total PAN to be land applied (tine n from section II) = 2524.0 lb. PAN x. Crop's remaining PAN balance (line v from section III) = 2778.1 lb. PAN y. Overall PAN balance (w - x) _ -254 lb. PAN l Line y must show as a deficit. If line y does not show as a deficit, list course of action here including pump and haul, depopulation, herd reduction, etc. For pump & haul and herd reduction options, recalculate new PAN based on new information. If new fields are to be included as an option for lowering lagoon level, add these fields to the PAN balance PoA (30 Day) 2121100 table and recalculate the overall PAN, balance. It animal waste is to be hauled to another permitted tacility, provide information regarding the herd population and lagoon freeboard levels at the receiving facility. NARRATIVE: Irrigation onto existing spray fields will continue as weather and field conditions permit. Prior to Hurricane Florence, Mr. Chambers recorded freeboard levels were 35" on lagoon 1 and 36" on lagoon 2. Due to heavy and persistent rainfall from Hurricane Florence, Mr. Chambers recorded 4" freeboard on lagoon 1 and 5" freeboard on lagoon 2 and reported these readings to the inspector on 9/17/18. Due to closures of roads and infrastructure, Mr. Chambers was unable to contact assistance for poa until 9/24/18, on which day he began work -with a technical specialist. This was the first day of the county office opening after the storm. Mr. Chambers was able to commence irrigation on 9/20118, and was able to reach 12" on both lagoon 1 and 2 on 9/26/18. Mr. Chambers will keep inspector up to date on progress toward compliance. r 1 t r i PoA (30 Day) 2/21 /00 i PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES 30 DAY DRAW DOWN PERIOD I. TOTAL PAN TO BE LAND APPLIED PER WASTE STRUCTURE 1. Structure Name/Identifier (ID): La oon 1 2. Current liquid volume in 25 yr./24 hr. storm storage & structural freeboard a. current liquid level according to marker 4.01 inches b. designed 25 yr./24 hr. storm & structural freeboard 19.51 inches c. line b - line a (inches in red zone) = 15.5, inches d. top of dike surface area according to design below freeboard 752501 fe (area at structural elevation) e. line c/12 x line d x 7.48 gallons/fO 727040 gallons 3. Projected volume of waste liquid produced during draw down period f. temporary storage period according to structural design 180 days g. volume of waste produced according to structural design 116329 fe h. current herd # 3576 certified herd # 3520 actual waste produced = current herd # x line g = 118180 certified herd # i. volume of wash water according to structural design fo j. excess rainfall over evaporation according to design 47745.833 fP k. (lines h + i + j) x 7.48 x 30 daysAine f= 206854 gallons 4. Total PAN to be land applied during draw down period I. current waste analysis dated 7/4/18 1.70 Ibs/1000 gal. m. ((lines e + k)/1000) x line I = 1587.6 lbs. PAN REPEAT SECTION I FOR EACH WASTE STRUCTURE ON SITE. (Click on the next Structure tab shown below) PoA (30 Day) 2/21/00 A ,y PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES 30 DAY DRAW DOWN PERIOD I. TOTAL PAN TO BE LAND APPLIED PER WASTE STRUCTURE 1. Structure Name/Identifier (ID): La oon 2 2. Current liquid volume in 25 yr./24 hr. storm storage & structural freeboard a. current liquid level according to marker 5.0 inches b. designed 25 yr./24 hr. storm & structural freeboard 19.5 inches } c. line b - line a (inches in red zone) = 14.5 inches d. top of dike surface area according to design (area at below structural freeboard elevation) 434161 ftz e. line c/12 x line d x 7.48 gallons/ft3 392408 gallons 3. Projected volume of waste liquid produced during draw down period i f. temporary storage period according to structural design 180 days g. volume of waste produced according to structural design 58023.5 f? h. current herd # 1690 certified herd #1 1760 actual waste produced = current herd # x line g = 55716 fO certified herd # i. volume of wash water according to structural design j. excess rainfall over evaporation according to design k. (lines h + i + j) x 7.48 x 30 days/line f= 4. Total PAN to be land applied during draw down period I. current waste analysis dated 7/4/18 m. ((lines e + k)/1000) x line I = REPEAT SECTION I FOR EACH WASTE STRUCTURE ON SITE. (Click on the next Structure tab shown below) 0 f? 26950 ft3 103057 gallons 1.89 Ibs/1000 gal 936.4 lbs. PAN 0 PoA (30 Day) 2/21 /00