Loading...
HomeMy WebLinkAboutWQ0040971_Application_20190624Union County Public Works 500 North Main Street Suite 400 Monroe, NC 28112 T. 704-296-4210 www.unioncountync.gov Transmittal To: Attention: Regarding NC Department of Environmental Quality Division of Water Resources - Mooresville Regional Office 610 East Center Avenue Mooresville, N.C. 28115 F'ECEIVED/NCbENR/DWp JUN 2 4 2019 QRO MOORESVILLE REGlIONAL OFFICE Date: June 20, 2019 Sanitary Sewer to serve Grace One Church We are sending you: ❑ Copy of letter ❑ Prints X Other ❑ Plans ❑ Shop Drawings Copies Date No. v Description 1 Cover Letter 1 6/20/19 Fast Track Application 1 6/20/19 Copy of Fast Track Application 1 Topo Map 1 Street Level Map 1 6/20119 Flow Tracking Form 1 6/19/19 015851 $480.00 Check (Application Fee) These are transmitted and checked below: 0 For approval ❑ For your ❑ As requested ❑ For review and comment use Remarks: Signed: Received y: `` Co <Q" 16421 qTH »c Peter W. Brown Date: c-" _,'--' IAACS 0 CIVIL ENGINEERING DESIGN , LAND SURVEYING 8720 RED OAK BOULEVARD, STE. 420 CHARLOTTE, N.C. 28217 PHONE (704) 527-3440 FAX (704) 527-8335 Proiect Narrative RECEIVED/NCDENR/DWFk wQROS MOORESVILLE REGIONAL OFFICE Grace One Church Sewer Extension 2609 Chestnut Lane, Union County, North Carolina The project site is located at 2609 Chestnut Lane, Union County, N.C. The proposed development will be the construction of a Church and a renovated house to an office building. Sewer flow to be generated by the proposed church/office site is 2,910 GPD. A proposed private sewer pump station will bring the flow from the site to a proposed public sewer collection system located along Chestnut Lane and over to Hidden Cove Lane where it will tie into the Existing sewer system which ties into existing 8 inch gravity sewer lines owned by Union County Public Works and will be treated at the Twelve Mile WWTP (WWTF NC0085350), which is owned by Union County. Included in this submission are the following: • One original and one copy of application and supporting documents • Check for $480.00 • Flow Tracking/Acceptance for Sewer Extensions Application (FTSE 04-16) o Downstream Capacity Analysis • Site Maps o Color USGS Map o Street level Map Division of Water Resources State of North Carolina Department of Environmental Quality Division of Water Resources 15A NCAC 02T .0300 — FAST TRACK SEWER SYSTEM EXTENSION APPLICATION FTA 04-16 & SUPPORTING DOCUMENTATION Application Number: L> pp v� 0 � (to be completed by DWR) J U N 2 4 2 01 9 All items must be completed or the application will be returned WQROS MOORESVILLE REGIONAL OFFICE I. APPLICANT INFORMATION: 1. Applicant's name: Union County Public Works (company, municipality, HOA, utility, etc.) 2. Applicant type: ❑ Individual ❑ Corporation ❑ General Partnership ❑ Privately -Owned Public Utility ❑ Federal ® State/County ❑ Municipal ❑ Other 3. Signature authority's name: Crystal O. Panico, P.E. per 15A NCAC 02T .0106(b) Title: New Development Program Manager 4. Applicant's mailing address: 500 North Main St., Suite 400 City: Monroe State: North Carolina Zip: 28112- 5. Applicant's contact information: Phone number: (704) 296-4239 Email Address: cr sy tal.panico(a),unioncountync.gov II. PROJECT INFORMATION: 1. Project name: Grace One Church 2. Application/Project status: ® Proposed (New Permit) ❑ Existing Permit/Project If a modification, provide the existing permit number: WQ00 and issued date: If new construction but part of a master plan, provide the existing permit number: WQ00 3. County where project is located: Union 4. Approximate Coordinates (Decimal Degrees): Latitude: 35.063°Longitude: -80.719' 5. Parcel ID (if applicable): 07141001D, (or Parcel ID to closest downstream sewer) III. CONSULTANT INFORMATION: 1. Professional Engineer: Brian T. Upton P.E. License Number: 025926 Firm: The Isaacs Group, P.C. Mailing address: 8720 Red Oak Blvd. Ste. 420 City: Charlotte State: NC Zip: 28217- Phone number: (704 227-9406 Email Address: bunton(a isaacsgrp.com IV. WASTEWATER TREATMENT FACILITY (WWTF) INFORMATION: 1. Facility Name: Twelve Mile WWTP Permit Number: NCO085359 Owner Name: Union County V. RECEIVING DOWNSTREAM SEWER INFORMATION (if different than WWTF): 1. Permit Number(s): WQ0037524 Downstream (Receiving) Sewer Size: 8 inch System Wide Collection System Permit Number(s) (if applicable): WQCS Owner Name(s): Union County Public Works FORM: FTA 04-16 Page 1 of 5 VI. GENERAL REQUIREMENTS 1. If the Applicant is a Privately -Owned Public Utility, has a Certificate of Public Convenience and Necessity been attached? ❑ Yes ❑No ®N/A 2. If the Applicant is a Developer of lots to be sold, has a Developer's Operational Agreement (FORM: DEV) been attached? ❑ Yes ❑No ®N/A 3. If the Applicant is a Home/Property Owners' Association, has an Operational Agreement (FORM: HOA) been attached? ❑ Yes ❑No ®N/A 4. Origin of wastewater: (check all that apply): ❑ Residential Owned ❑ Retail (stores, centers, malls) ❑ Car Wash ❑ Residential Leased ❑ Retail with food preparation/service ❑ Hotel and/or Motels ❑ School / preschool / day care ❑ Medical / dental / veterinary facilities ❑ Swimming Pool /Clubhouse ❑ Food and drink facilities ® Church ❑ Swimming Pool/Filter Backwash ® Businesses / offices / factories ❑ Nursing Home ❑ Other (Explain in Attachment) 5. Nature of wastewater: 100 % Domestic/Commercial % Commercial % Industrial (See 15A NCAC 02T .0103(,20)) 1Is there a Pretreatment Program in effect? ❑ Yes ❑ No 6. Hasa flow reduction been approved under 15A NCAC 02T .0114(f)? ❑ Yes ❑ No ➢ If yes, provide a copy of flow reduction approval letter 7. Summarize wastewater generated by project: Establishment Type (see 02T.0114(f)) Daily Design Flow a,b No. of Units Flow Church w/Kitchen 5 gal/seat 567 2835 GPD Office 25 gal/employee 3 75 GPD gal/ GPD gal/ GPD gal/ GPD gal/ GPD Total 2910 GPD a See 15A NCAC 02T .0114(b), (d), (e)(1) and (e)(2) for caveats to wastewater design flow rates (i.e., minimum flow per dwelling; proposed unknown non-residential development uses; public access facilities located near high public use areas; and residential property located south or east of the Atlantic Intracoastal Waterway to be used as vacation rentals as defined in G.S. 42A-4). b Per 15A NCAC 02T .0114(c), design flow rates for establishments not identified [in table 15A NCAC 02T.0114] shall be determined using available flow data, water using fixtures, occupancy or operation patterns, and other measured data. 8. Wastewater generated by project: 2910 GPD (per 15A NCAC 02T .0114) ➢ Do not include future flows or previously permitted allocations If permitted flow is zero, indicate why: ❑ Pump Station or Gravity Sewer where flow will be permitted in subsequent permits that connect to this line ❑ Flow has already been allocated in Permit Number: ❑ Rehabilitation or replacement of existing sewer with no new flow expected ❑ Other (Explain): FORM: FTA 04-16 Page 2 of 5 VII. GRAVITY SEWER DESIGN CRITERIA (If Applicable) - 02T .0305 & M DC (Gravity Sewers): 1. Summarize gravity sewer to be permitted: Size (inches) Length (feet) Material 8 88 PVC 8 173 DIP 2 ➢ Section II & III of the MDC for Permitting of Gravity Sewers contains information related to design criteria ➢ Section III contains information related to minimum slopes for gravity sewer(s) ➢ Oversizing lines to meet minimum slope requirement is not allowed and a violation of the MDC VIII. PUMP STATION DESIGN CRITERIA (If Applicable) — 02T .0305 & MDC (Pump Stations/Force Mains): COMPLETE FOR EACH PUMP STATION INCLUDED IN THIS PROJECT 1. Pump station number or name: 2. Approximate Coordinates (Decimal Degrees): Latitude: Longitude: - ° 3. Design flow of the pump station: millions gallons per day (firm capacity) 4. Operational point(s) of the pump(s): gallons per minute at feet total dynamic head (TDH) 5. Summarize the force main to be permitted (for this Pump Station): Size (inches) Length (feet) Material 6. Power reliability in accordance with 15A NCAC 02T .0305(h)(1): ❑ Standby power source or pump with automatic activation and telemetry -15A NCAC 02T .0305(h)(1)(B): ➢ Required for all pump stations with an average daily flow greater than or equal to 15,000 gallons per day ➢ Must be permanent to facility Or if the pump station has an average daily flow less than 15,000 gallons per day: ❑ Portable power source with manual activation, quick -connection receptacle and telemetry - 15A NCAC 02T .0305(h)(1)(C) or ❑ Portable pumping unit with plugged emergency pump connection and telemetry - 15A NCAC 02T .0305(h)(1)(C): ➢ It shall be demonstrated to the Division that the portable source is owned or contracted by the applicant (draft agreement) and is compatible with the station. ➢ If the portable power source or pump is dedicated to multiple pump stations, an evaluation of all the pump stations' storage capacities and the rotation schedule of the portable power source or pump, including travel timeframes, shall be provided in the case of a multiple station power outage. FORM: FTA 04-16 Page 3 of 5 IX. SETBACKS & SEPARATIONS — (02B .0200 & 15A NCAC 02T .0305(f)): 1. Does the project comply with all separations found in 15A NCAC 02T .0305(0 & M ➢ 15A NCAC 02T_0305(fl contains minimum separations that shall be provided for sewer systems: ® Yes ❑ No Setback Parameter* Separation Required Storm sewers and other utilities not listed below vertical 24 inches Water mains vertical -water over sewer including in benched trenches 18 inches Water mains horizontal 10 feet Reclaimed water lines vertical - reclaimed over sewer 18 inches Reclaimed water lines horizontal - reclaimed over sewer 2 feet **Any private or public water supply source, including any wells, WS-I waters of Class I or Class II impounded reservoirs used as a source of drinking water 100 feet **Waters classified WS (except WS-I or WS-V), B, SA, ORW, HQW, or SB from normal high water or tide elevation and wetlands see item IX.2 50 feet **Any other stream, lake, impoundment, or ground water lowering and surface drainage ditches 10 feet Any building foundation 5 feet Any basement 10 feet Top slope of embankment or cuts of 2 feet or more vertical height 10 feet Drainage systems and interceptor drains 5 feet Any swimming pools 10 feet Final earth grade vertical 36 inches ➢ 15A NCAC 02T.0305(g) contains alternatives where separations in 02T.0305(fl cannot be achieved. ➢ **Stream classifications can be identified using the Division's NC Surface Water Classifications webpage ➢ If noncompliance with 02T.0305(f) or (g), see Section X of this application 2. Does the project comply with separation requirements for wetlands? (50 feet of separation) ❑ Yes ❑ No N/A ➢ See the Division's draft separation requirements for situations where separation cannot be meet ➢ No variance is required if the alternative design criteria specified is utilized in design and construction ➢ As built documents should reference the location of areas effected 3. Does the project comply with all setbacks found in the river basin rules per 15A NCAC 02B .0200? ❑ Yes ❑ No N/A ➢ This would include Trout Buffered Streams per 15A NCAC 2B.0202 4. Does the project comply with an individual 404 Permit or any 401 Certifications? ❑ Yes ❑ No N/A ➢ Wetland -related permits shall be requested, obtained, and adhered to for projects that impact wetlands or surface waters ➢ Information can be obtained from the 401 & Buffer Permitting Branch 5. Does project comply with 15A NCAC 02T.0105(c)(6) (additional permits/certifications)? [:]Yes ❑ No N/A Per 15A NCAC 02T.0105(c)(6), directly related environmental permits or certification applications are being prepared, have been applied for, or have been obtained. Issuance of this permit is contingent on issuance of dependent permits (erosion and sedimentation control plans, stormwater management plans, etc.). 6. Does this project include any sewer collection lines that are deemed "high -priority?" Per 15A NCAC 02T.0402, "high -priority sewer" means "any aerial sewer, sewer contacting surface waters, siphon, or sewer positioned parallel to streambanks that is subject to erosion that undermines or deteriorates the sewer. ❑ Yes ® No ➢ If yes, include an attachment with details for each line, including type (aerial line, size, material, and location). High priority lines shall be inspected by the permittee or its representative at least once every six -months and inspections documented per 15A NCAC 02T.0403(a)(5) or the permitee's individual System -Wide Collection permit. FORM: FTA 04-16 Page 4 of 5 X. CERTIFICATIONS: 1. Does the submitted system comply with 15A NCAC 02T, the Minimum Design Criteria for the Permitting of Puma Stations and Force Mains (latest version), and the Gravity Sewer Minimum Design Criteria (latest version) as applicable? ® Yes ❑ No If No, complete and submit the Variance/Alternative Design Request application (VADC 10-14) and supporting documents for review. Approval of the request is required prior to submittal of the Fast Track Application and supporting documents. 2. Professional Engineer's Certification: I BRIAN T. UPTON P.E. (Professional Engineer's name from Application Item III.1.) attest that this application for has been reviewed by me and is accurate, complete and consistent with the information supplied in the plans, specifications, engineering calculations, and all other supporting documentation to the best of my knowledge. I further attest that to the best of my knowledge the proposed design has been prepared in accordance with the applicable regulations, Gravity Sewer Minimum Design Criteria for Gravity Sewers (latest version), and the Minimum Design Criteria for the Fast -Track Permitting of Pump Stations and Force Mains (latest version). Although other professionals may have developed certain portions of this submittal package, inclusion of these materials under my signature and seal signifies that I have reviewed this material and have judged it to be consistent with the proposed design. NOTE — In accordance with General Statutes 143-215.6A and 143-215.613, any person who knowingly makes any false statement, representation, or certification in any application package shall be guilty of a Class 2 misdemeanor, which may include a fine not to exceed $10,000, as well as civil penalties up to $25,000 per violatiiw, North Carolina Professional Engineer's seal, signature, and date: v ~�`�4�tic)�s��f a SEAL :... QMall z T. 3. Applicant's Certification per 15A NCAC 02T .0106(b): ICRYSTAL 0 PANICO, P.E. NEW DEVELOPMENT PROGRAM MANAGER (Signature Authority's name & title from Application Item I.3.) attest that this application for has been reviewed by me and is accurate and complete to the best of my knowledge. I understand that if all required parts of this application are not completed and that if all required supporting documentation and attachments are not included, this application package is subject to being returned as incomplete. I understand that any discharge of wastewater from this non - discharge system to surface waters or the land will result in an immediate enforcement action that may include civil penalties, injunctive relief, and/or criminal prosecution. I will make no claim against the Division of Water Resources should a condition of this permit be violated. I also understand that if all required parts of this application package are not completed and that if all required supporting information and attachments are not included, this application package will be returned to me as incomplete. NOTE — In accordance with General Statutes 143-215.6A and 143-215.6B, any person who knowingly makes any false statement, representation, or certification in any application package shall be guilty of a Class 2 misdemeanor, which may include a fine not to exceed $10,000 as well as civil penalties up to $25,000 per violation. Signature: QMw Date: FORM: FTA 04-16 Page 5 of 5 DQ goo 1!1 T'siaD�— a0-NOOa8.NV10 r I vy FIN v C > oao Nos71" POT � S•RD T c \` / o L MgRIDG 06 �y DELAMERE /\ �s9 099, 00 0 O�I �W Pork TLUe tv if v l Off' O o Qu pILRID GI ___•��� n it E. �y ��OODS O a�1S3a � � C /•u tn6 L G� Q \ G +� �PKEHURST XIN 1 ]H) HJQI 1Nb ��r• O fP ! 1111 C y/EDD NGTON•RD 1 Jl � N7 /y, 1 � �/ Ko , 3 < Jd� J Q A\5,0 c /vi N J .5 ' J�N4VjO \ �yoA3 Z o OUSM3Hllbw lrta xtS 0 E \/ > rn _ potter Rd a CD b 4 a G�dpeln Or O 00. p '1j E weEaT "Pmrw ,�'�8a`g ON s,.mm�Ln .- i O a 4 N ,..,n ca,.,----Westferk'iwelventileG'reek"' G3 , e� CB C6 r 5 F cc 4 c 0 o �-�nnrssc �o 5 6 rmAure�'G' 1 .y w c P 3� b 0 O 3yMWf c b �`j W V N Alf 4: s o do 5 4� Z` �Q,d LaMe�'us,i Uo.si^q rJ�i 3 El n W c 4 g Ail aofBu�pAa�u, m c 0- ON z € o A h O P: L 4� �0 3 AEL AMIRL � earl in P4's � o Ma9rye 4eisiiiw so � �Ap° wi o H 0 OLL P 9 ] A V a «Er r z lameem.ttwia S `° ca bSM n e g e � ,e avUa �. s State of North Carolina Department of Environmental Quality Division of Water Resources Flow Tracking for Sewer Extension Applications (FTSE 10-18) Entity Requesting Allocation: Union County Project Name for which flow is being requested: Grace One Church More than one FTSE may be required for a single project if the owner of the WWTP is not responsible for all pump stations along the route of the proposed wastewater flow. 1. Complete this section only if you are the owner of the wastewater treatment plant. a. WWTP Facility Name: Twelve Mile Creels WWTP b. WWTP Facility Permit #: NCO085359 All flows are in MGD c. WWTP facility's permitted flow 6.0* Does not include 3 MGD diversion to 6 Mile d. Estimated obligated flow not yet tributary to the WWTP 1.7871 e. WWTP facility's actual avg. flow 4.11 f. Total flow for this specific request 0.0029 g. Total actual and obligated flows to the facility 5.9000 h. Percent of permitted flow used 98.33 II. Complete this section for each pump station you are responsible for along the route of this proposed wastewater flow. List pump stations located between the project connection point and the WWTP: (A) (B) (C) (D)=(B+C) (E)=(A-D) Design Obligated, Pump Pump Average Approx. Not Yet Total Current Station Station Firm Daily Flow** Current Tributary Flow Plus (Name or Permit Capacity, * (Firm / p f), Avg. Daily Daily Flow, Obligated Available Number) No. MGD MGD Flow, MGD MGD Flow Capacity*** Brookhaven 0022423 1.7435 0.6974 0.5852 0.0236 0.6088 0.0886 * The Firm Capacity (design flow) of any pump station is defined as the maximum pumped flow that can be achieved with the largest pump taken out of service. ** Design Average Daily Flow is the firm capacity of the pump station divided by a peaking factor (pf) not less than 2.5, per Section 2.02(A)(4)(c) of the Minimum Design Criteria. *** A Planning Assessment Addendum shall be attached for each pump station located between the project connection point and the WWTP where the Available Capacity is < 0. Downstream Facility Name (Sewer): Twelve Mile Creek WWTP Downstream Permit Number: WQ0037524 Page 1 of 6 FTSE 10-18 III. Certification Statement: I Crystal O. Panico, PE certify to the best of my knowledge that the addition of the volume of wastewater to be permitted in this project has been evaluated along the route to the receiving wastewater treatment facility and that the flow from this project is not anticipated to cause any capacity related sanitary sewer overflows or overburden any downstream pump station en route to the receiving treatment plant under normal circumstances, given the implementation of the planned improvements identified in the planning assessment where applicable. This analysis has been performed in accordance with local established policies and procedures using the best available data. This certification applies to those items listed above in Sections I and II plus all attached planning assessment addendums for which I am the responsible party. Signature of this form certifies that the receiving collection system or treatment works has adequate capacity to transport and treat the proposed new wastewater. Signing New Development Program Manager Title of Signing Official Page 2 of 6 FTSE 10-18