HomeMy WebLinkAbout20110841 Ver 1_As-Built Report -Ph II_DWR comment_20190702Strickland, Bev
From: Merritt, Katie
Sent: Tuesday, July 02, 2019 4:30 PM
To: Crocker, Lindsay
Subject: As -Built Report - Burnetts Chapel Phase II
Hey Lindsay,
I have read through the As -Built report for the Burnetts Chapel Phase II project received by DWR on May 30,
2019. Overall, it appears that everything was completed in compliance with the mitigation plan. One thing I
noticed is that the credit assets were slightly smaller than those proposed in the mitigation plan, but were
consistent with what was provided on the signed and sealed As -Built survey.
Thank you,
Katie