HomeMy WebLinkAbout20171291 Ver 1_Technical Site Review_20190625Page 1
Site Information
....................................................................
Date: *
Project Name:*
Prepared By:*
Type of Site:*
Meeting Type:*
6/25/2019
Gideon
Erin Davis
Bank Stream Site
Technical Site Review
Sponsor/Provider: *
Bank Stream Site
USACE AID:
County: *
Surry
NCDWR ID:
20171291
HUC and Basin:*
Yadkin Pee Dee - 03040101
Weather:
Degrees North
Coordinates:
Attendees
RES - Brad, Brian, Casey, Matt
DWR - Mac, Erin
USACE - Todd, Steve, Brian
Project Review Checklist
(provide additional detail in notes section on next page)
NCDWR Version
Degrees West
General Site Issues/Concerns:
Stream Issues/Concerns
Wetland Issues/Concerns:
Vegetation Composition or
Density
Planted Stem Vigor (due to
soil, browsing)
Invasive/Exotic Species
Beaver/Feral Hogs
(management plan)
Soil (manipulation,
compaction, fertility)
Livestock Present/Evidence
of Livestock Access
Crossings or Utility Lines
BMPs or Alternate
Approaches
Fencing Issues or Fencing
Needed
Ponds Within Project Area
Incised/Entrenched
Headcuts Present/Forming
Stream Structures
Failing/Piping
Excess
Sediment/Aggradation
Cross -Sections
Missing/Indicate Problems
Bank Instability/Failure
Bench Rills/Erosion
(constructed bench or P2
valley)
Excess Sinuosity (lack of
flow)
Braided/Anabranch Channel
Evidence of Excessive
Hydrology
Evidence of Insufficient
Hydrology
Hydric Soil Indicators/Soil
Series
Surface Roughness or
Bedding
Channel
Relocation/Riparian
Connectivity
Hydroperiod Length or
Start/Stop Date
Inappropriate Credit Ratio
Proposed
JD Needed to Confirm
Approach
Continuity/Fragmentation
Easement Issues (existing
farm, CE, NRCS funding)
Easement Encroachments
(livestock, clearing)
Easement Marking/Signage
Insufficient Project Size
Adjacent Property Owner
T&E Species
Section 106 (historic
listing/tribal issues)
Insufficient Stream Drainage
Area
Insufficient Hydrology (if
raising channel bed)
Vegetation in Channel
(stream vs wetland)
Flow Obstructions
(undersized pipes, fords)
Substrate Concerns
(embeddedness, particle
size)
Live Stakes Absent/Failing
Evidence of Water Quality
Issues
In -stream Habitat
Weak/Missing
Stream Buffer Width
Inadequate
Missing Gauge Data
(preconstruction or
monitoring)
Gauge Location/Placement
Gauge Maintenance
Drainage Ditches/Swales
Present
Field Tiles/Subsurface
Drainage
Continued Ag Use Adjacent
to Wetland
Page 2 - -
Notes and Sketches, etc
JN6C - once enter rhododendron area no substrate 5+ feet; Mac - add wood structure; monitor often & use adaptive
management; somewhat risky but approach initially discussed and supported by IRT;
Invasives- multiflora,
IRT to visit after construction
Credit Release/Site Closeout Information
(For monitoring or closeout review only)
............................................................................................................................................................................................................................................................................................................................................................................................................
Stream Credits
Warm Cool Cold
Requested
Approved*
Wetland Credits
Riparian Riverine Riparian Non-Riverine Non -Riparian Coastal
Requested
Approved*
'The updated credit ledger for the project, which includes this release, must be approved by the Project Manager.
Result of Monitoring Report or Closeout
Signature*
Lr I Oq 1�?
Date 6/25/2019