Loading...
HomeMy WebLinkAbout20180784 Ver 1_Final Mitigation Plan posted_20190702Strickland, Bev From: Sent: To: Cc: Subject: Follow Up Flag: Flag Status: Good call! Thanks Mac. Lin Xu, Lin Tuesday, July 02, 2019 2:21 PM Haupt, Mac; Crocker, Lindsay; Kim Browning; Tugwell, Todd J CIV USARMY CESAW (US); Davis, Erin B Russell, Periann; Raymond Holz (rholz@restoratio nsystems.com); Alex Baldwin RE: Arabia Bay -Final Mitigation Plan posted Follow up Flagged Lin Xu Project Review Coordinator Division of Mitigation Services Department of Environmental Quality (919) 707-8319 Office (919) 219-8476 mobile lin.xu@ncdenr.gov 1652 Mail Service Center Raleigh, NC 27699-1652 Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties. -----Original Message ----- From: Haupt, Mac <mac.haupt@ncdenr.gov> Sent: Tuesday, July 02, 2019 1:07 PM To: Crocker, Lindsay <Lindsay.Crocker@ncdenr.gov>; Kim Browning <Kimberly.D.Browning@usace.army.mil>; Tugwell, Todd J CIV USARMY CESAW (US) <Todd.J.Tugwell@usace.army.mil>; Davis, Erin B <erin.davis@ncdenr.gov> Cc: Russell, Periann <periann.russell@ncdenr.gov>; Xu, Lin <lin.xu@ncdenr.gov>; Raymond Holz (rholz@restorationsystems.com) <rholz@restorationsystems.com>; Alex Baldwin <abaldwin@restorationsystems.com> Subject: RE: Arabia Bay -Final Mitigation Plan posted As long as that clang terracell doesn't touch a jurisdictional water!!! H H H! -----Original Message ----- From: Crocker, Lindsay Sent: Tuesday, July 2, 2019 12:33 PM To: Kim Browning <Kimberly.D.Browning@usace.army.mil>; Haupt, Mac <mac.haupt@ncdenr.gov>; Tugwell, Todd J CIV USARMY CESAW (US) <Todd.J.Tugwell@usace.army.mil>; Davis, Erin B <erin.davis@ncdenr.gov> Cc: Russell, Periann <periann.russell@ncdenr.gov>; Xu, Lin <lin.xu@ncdenr.gov>; Raymond Holz (rholz@restorationsystems.com) <rholz@restorationsystems.com>; Alex Baldwin <abaldwin@restorationsystems.com> Subject: Arabia Bay -Final Mitigation Plan posted Thanks for the clarification, Kim. The final Mitigation Plan for Arabia Bay was finalized this week, and included the final signed PJD by Beecher. Per the requirements in the eApproval letter from the IRT, the final document was posted to our project page, along with the summarized errata sheet with response to comments. It is available here: https://deq.nc.gov/about/divisions/mitigation-services/dms-projects DMS/RS will not submit a PCN Application, but ensure construction activities will occur 30 days after this email notice, and that any other required permits are in place as necessary. Let us know if you need anything else. Thanks. Lindsay Crocker NC DEQ Division of Mitigation Services 217 West Jones St., Raleigh, NC 27603 Office 919.707.8944 Cell 919.594.3910 lindsay.crocker@ncdenr.gov Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties unless the content is exempt by statute or other regulation. -----Original Message ----- From: Browning, Kimberly D CIV USARMY CESAW (US) <Kimberly.D.Browning@usace.army.mil> Sent: Tuesday, July 02, 2019 11:48 AM To: Xu, Lin <lin.xu@ncdenr.gov>; Haupt, Mac <mac.haupt@ncdenr.gov> Cc: Tugwell, Todd J CIV USARMY CESAW (US) <Todd.J.Tugwell@usace.army.mil>; Crocker, Lindsay <Lindsay.Crocker@ncdenr.gov>; Russell, Periann <periann.russell@ncdenr.gov> Subject: [External] RE: Permit Question for Wetland Only Projects (UNCLASSIFIED) CAUTION: External email. Do not click links or open attachments unless you verify. Send all suspicious email as an attachment to report.spam@nc.gov<maiIto: report.spam@nc.gov> CLASSIFICATION: UNCLASSIFIED Hi Lin Correct, if you are not placing fill in a jurisdictional feature, you do not need a permit. I only have the JD request from Axiom in my copy of the Draft Mitigation Plan --do you have the JD paperwork from the USACE PM, I think it's Gary Beecher? I assume that will arrive with the final mitigation plan. Hope that helps and Happy 4th, Kim Kim Browning Mitigation Project Manager, Regulatory Division I U.S. Army Corps of Engineers 3331 Heritage Trade Dr, Ste. 105 1 Wake Forest, NC 27587 1 919.554.4884 x60 BUILDING STRONG (r) -----Original Message ----- From: Xu, Lin [mailto:lin.xu@ncdenr.gov] Sent: Tuesday, July 02, 2019 8:34 AM To: Browning, Kimberly D CIV USARMY CESAW (US) <Kimberly.D.Browning@usace.army.mil>; Haupt, Mac <mac.haupt@ncdenr.gov> Cc: Tugwell, Todd J CIV USARMY CESAW (US) <Todd.J.Tugwell@usace.army.mil>; Crocker, Lindsay <Lindsay.Crocker@ncdenr.gov>; Russell, Periann <periann.russell@ncdenr.gov> Subject: [Non-DoD Source] Permit Question for Wetland Only Projects Good morning Kim and Mac, DMS has several wetland only projects involving filling ditches, such as Arabia Bay. However, those ditches are non - jurisdictional. Do we need to obtain 401/404 for those wetland only projects? Thank you very much for your time and help. Have a good day! Lin Lin Xu Project Review Coordinator Division of Mitigation Services Department of Environmental Quality (919) 707-8319 Office (919) 219-8476 mobile lin.xu@ncdenr.gov <mailto:lin.xu@ncdenr.gov> 1652 Mail Service Center Raleigh, NC 27699-1652 Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties. CLASSIFICATION: UNCLASSIFIED