HomeMy WebLinkAbout310397_Plan of Action_20180926;-'6180:2,65 ^7 31-3q PLAN OF ACTION(Poa) FOR HIGH FREEBOARD AT ANIMAL FACILITIES Facility Number: 31-397 County: Duplin Facility Name: 53 & S4 Certified Operator Name: Derek Brown Operator Number: 19632 1. Current liquid level(s) in inches as measured from the current liquid level in the lagoon to the lowest point on the top of the dam for lagoons without spillways; and from the current liquid level in the lagoon to the bottom of the spillway for lagoons with spillways. Lagoon 1 Lagoon 2 Lagoon 3 Lagoon 4 Lagoon 5 Lagoon Name/ID: S3 S4 Spillway(Y or N): N N Level(inches): 27 12 2. Check all applicable items Liquid level is within the designed structural freeboard elevations of one or more structures. Five and 30 day Plans of Action are attached. Hydraulic and agronomic balances are within acceptable ranges. X Liquid level is within the 25 year 24 hour storm elevations for one or more structures. A 30 day Plan of Action is attached. Agronomic balance is within acceptable range. Waste is to be pumped and hauled to off site locations. Bolume and PAN content of waste to be pumped and hauled is reflected in section III tables. Included within this plan is a list of the proposed sites with related facility numbers, number of acres and receiving crop information. Contact and secure approval from the DWQ prior to transfer of waste to a site not covered in the facility's CAWMP. Operation will be partially or fully depopulated. *Attach a complete schedule with corresponding animal units and dates fro depopulation *if animals are to be moved to another permitted facility, provide facility number, lagoon freeboard levels and herd population for the receiving facility 3. Earliest possible date to begin land application -of waste: _ as conditions permit I hereby certify that I have reviewed the information listed above and included within the attached Plan of Action, and to the best of my knowledge and ability, the information is accurate and correct. Murphy Brown LLC Phone: Facility Owner/Man ger rint) Date: Facliana5dr'(s-ig-n-a-tu-r-e7- 910-293-3434 9/25/2018 II. TOTAL POUNDS OF PAN STORED WITHIN STRUCTURAL FREEBOARD AND/OR 25 YR./24 HR. STORM STORAGE ELEVATIONS IN ALL WASTE STRUCTURES FOR FACILITY 1. Structure ID: S-3 line m = lb PAN 2. Structure ID: S4 line m = 1235.7 lb PAN 3. Structure ID: line m = lb PAN 4. Structure ID: line m = lb PAN 5. Structure ID: line m = lb PAN 6. Structure ID: line m = lb PAN n. lines 1 + 2 + 3 + 4 + 5 + 6 = 1235.7 lb PAN III. TOTAL PAN BALANCE REMAINING FOR AVAILABLE CROPS DURING 30 DAY DRAW DOWN PERIOD. DO NOT LIST FIELDS TO WHICH PAN CANNOT RIP APPI IFn nl IRINr. THIS an nev al=Qlnn o. tract # p. field # q. crop r. acres s. remaining IRR 2 PAN balance (lb/acre) t. TOTAL PAN BALANCE FOR FIELD (lbs.) column r x s u, application window' L2 soybeans 20.44 110.92 2267.2 April 1 - Oct 7 atate current crop ending application date or next crop application beginning date for available receiving crops during 30 day draw down period. v. Total PAN available for all fields (sum of column t) = 2267.2 lb. PAN IV. FACILITY'S PoA OVERALL PAN BALANCE w. Total PAN to be land applied (line n from section II) = 1235.7 Ib. PAN PoA (30 Day) 2/21 /00 x. Crop's remaining PAN balance (line v-from section III) = 2267.2 Ib. PAN y. Overall PAN balance (w x) = -1031 Ib. PAN Line y must show as a deficit_ If line y does not show as a deficit, list course of action here including pump and haul, depopulation, herd reduction; etc. For pump & haul and herd reduction options, recalculate new PAN based on new information. If new fields are to be included as an option for lowering lagoon level, add these fields to the PAN balance table and recalculate the overall PAN balance. If animal waste is to be hauled to another permitted facility, provide information regarding the herd population and lagoon freeboard levels at the receiving facility. NAKKA I I V t: Irrigation onto existing spray fields will continue as weather and field conditions permit. Additional land is available for pumping if needed. PoA (30 Day) 2/21/00 I A 11 f PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES 30 DAY DRAW DOWN PERIOD I. TOTAL PAN TO BE LAND APPLIED PER WASTE STRUCTURE 1 Structure Name/Identifier (ID) S-3 2. Current liquid volume in 25 yr./24 hr. storm storage & structural freeboard a, current liquid level according to marker 27.0 inches b. designed 25 yr./24 hr. storm & structural freeboard 19.9 inches c. line b - line a (inches in red zone) _ -7 inches d. top of dike surface area according to design (area at below structural freeboard elevation) 124914 ftZ e. line c/12 x line d x 7.48 gallons/W-551270 gallons 3. Projected volume of waste liquid produced during draw down period f. temporary storage period according to structural design 180 days g. volume of waste produced according to structural design 159345 ft' h. current herd # 817 certified herd #r_� actual waste produced = current herd # x line g = ft3 certified herd # i. volume of wash water according to structural design Oft3 j. excess rainfall over evaporation according to design 72867 ft' k. (lines h + i + j) x 7.48 x 30 days/line f= 90841 gallons 4. Total PAN to be land applied during draw down period I. current waste analysis dated Olbs/1000 gal. m. ((lines e + k)/1000) x line I = 0 lbs. PAN REPEAT SECTION I FOR EACH WASTE STRUCTURE ON SITE. (Click on the next Structure tab shown below) PoA (30 Day) 2/21100 PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES 30 DAY DRAW DOWN PERIOD 1. TOTAL PAN TO BE LAND APPLIED PER WASTE STRUCTURE 1. Structure Name/Identifier (ID): S-4 2. Current liquid volume in 25 yr./24 hr. storm storage & structural freeboard a. current liquid level according to marker b. designed 25 yr:/24 hr. storm & structural freeboard C. line b - line a (inches in red zone) _ d. top of dike surface a,rea according to design (area at below structural freeboard elevation) e. line c/12 x line d x 7.48 gallons/ft3 3. Projected volume of waste liquid produced during draw down period 12.0 inches 19.9 inches 7.9 inches 150000 ftz 740520 gallons f. temporary storage period according to structural design 180 days g. volume of waste produced according to structural design 211483 ft3 h. current herd # F 714 certified herd # 714 actual waste produced = current herd # x line g = certified herd # i. volume of wash water according to structural design j. excess rainfall over evaporation according to design k. (lines h + i +j) x 7.48 x 30 days/line f= 4. Total PAN to be land applied during draw down period I. current waste analysis dated 9/25/20i8 m. ((lines e + k)/1000) x line I = REPEAT SECTION I FOR EACH WASTE STRUCTURE ON SITE. (Click on the next Structure tab shown below) PoA (30 Day) 2/21/00 211483, ft's ft3 s75aa ft3 372732 gallons 1.11 lbs/1000 gal. 1235.7 lbs. PAN