Loading...
HomeMy WebLinkAbout310035_Plan of Action_201809262- PLAN OF ACTION(Poa) FOR HIGH FREEBOARD AT ANIMAL FACILITIES Facility Number: Facility Name: AWS310035 Waters 1-6 & M&M Rivenbark Certified Operator Name: Derek Brown County: Duplin Operator Number. AWA19632 1. Current liquid level(s) in inches as measured from the current liquid level in the lagoon to the lowest point on the top of the dam for lagoons without spillways; and from the current liquid level in the lagoon to the bottom of the spillway for lagoons with spillways. Lagoon Name/ID: Spillway(Y or N): Level(inches): Lagoon 1 Lagoon 2 Lagoon 3 Lagoon 4 Lagoon 5 2627 2748 3141 N 'N N 23 29 16 2. Check all applicable items Liquid level is within the designed structural freeboard elevations of one or more structures. Five and 30 day Plans of Action are attached. Hydraulic and agronomic balances are Within acceptable ranges. X Liquid level is within the 25 year 24 hour storm elevations for one or more structures. A 30 day Plan of Action is attached. Agronomic balance is within acceptable range. Waste is to be pumped and hauled to off site locations. Bolume and PAN content of waste to be pumped and hauled is reflected in section III tables. Included within this plan is a list of the proposed sites with related facility numbers, number of acres and receiving crop information. Contact and secure approval from the DWQ prior to transfer of waste to a site not covered in the facility's CAWMP. Operation will be partially or fully depopulated. *Attach a complete schedule with corresponding animal units and dates fro depopulation `if animals are to be moved to another permitted facility, provide facility number, lagoon freeboard levels and herd population for the receiving facility 3. Earliest possible date to begin land application of waste: As Conditions Permit I hereby certify that I have reviewed the information listed above and Included within the attached Plan of Action, and to the best of my knowledge and ability, the information is accurate and correct.' Murphy -Brown, LLC/Michael Norris Phone: (910) 293-3434 FA -#-�cility Own r/Ma ager (pri. Int) Date: 9/25/2018 Facility Owne / anager ure) PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES 30 DAY DRAW DOWN PERIOD I. TOTAL PAN TO BE LAND APPLIED PER WASTE STRUCTURE 1. Structure Name/Identifier (ID): 2627 2. Current liquid volume in 25 yr./24 hr, storm storage & structural freeboard a. current liquid level according to marker 23.0 inches b. designed 25 yr.124 hr. storm & structural freeboard 20.3 inches c, line b - line a (inches in red zone) _ -3 inches d. top of dike surface area according to design (area at below structural freeboard elevation) 93000 If e, line c/12 x line d x 7.48 gallons/ft3-1 57678gallons 3. Projected volume of waste liquid produced during draw down period f. temporary storage period according to structural design I 180 days g. volume of waste produced according to structural design 8CE38-51 ft3 h. current herd # 2873 certified herd # 2873 actual waste produced = current herd # x line g = 80685 It' certified herd # i. volume of wash water according to structural design j. excess rainfall over evaporation according to design k. (lines h + i + j) x 7.48 x 30 days/line f= 4. Total PAN to be land applied during draw down period I. current waste analysis dated 8/3/2018 m. ((lines e + k)/1000) x line I = REPEAT SECTION I FOR EACH WASTE STRUCTURE ON SITE. (Click on the next Structure tab shown below) PoA (30 Day) 2/21100 0 ft3 54250 ft3 168219 gallons 1. 611 Ibs/1000 gal. 17.0 Ibs. PAN i. PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES 30 DAY DRAW DOWN PERIOD 1. TOTAL PAN TO BE LAND APPLIED PER WASTE STRUCTURE 9. Structure Name/ldentifier (ID): 12748 2. Current liquid volume in 25 yr./24 hr. storm storage & structural freeboard a. current liquid level according to marker b. designed 25 yr./24 hr. storm & structural freeboard c. line b - line a (inches in red zone) = d. top of dike surface area according to design (area at below structural freeboard elevation) e. line c/12 x line d x 7.48 gallons/ft3 3. Projected volume of waste liquid produced during draw down period 29.0 inches 21.6 inches -7 inches 135512 ftz -625072 gallons f. temporary storage period according to structural design 180 days g. volume of waste produced according to structural design 143901 ft3 h. current herd # 5124 certified herd # 5124 actual waste produced = current herd # x line g = 143901 ft' certified herd # i. volume of wash water according to,structural design j. excess rainfall over evaporation according to design k. (lines h + i + j) x 7.48 x 30 days/line f= 4. Total PAN to be land applied during draw down period T I. current waste analysis dated 8/3/2018 m. ((lines e + k)/1000) x line I = REPEAT SECTION 1 FOR EACH WASTE STRUCTURE ON SITE. (Click on the next Structure tab shown below) Ofts 79049 ft3 277944 gallons 1.23 Ibs/1000 gal. -427 lbs. PAN PoA (30 Day) 2/21/00 PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES 30 DAY DRAW DOWN PERIOD I. TOTAL PAN TO BE LAND APPLIED PER WASTE STRUCTURE 1. Structure Name/Identifier (ID): F 3 441 2. Current liquid volume in 25 yr.1,,24 hr. storm storage & structural freeboard a. current liquid level according to marker b. designed 25 yr./24 hr. storm & structural freeboard c. line b - line a (inches in red zone) = d. top of dike surface area according to design (area at below structural freeboard elevation) e. line c/12 x line d x 7.48 gallons/ft' 3. Projected volume of waste liquid produced during draw down period 15.0 inches 20.21 inches 5.2 inches 112554 ftz 362019 gallons f. temporary storage period according to structural design 180 days g. volume of waste produced according to structural design 44382 ft' h. current herd # F 4310 certified herd #1 4310 actual waste produced = current herd # x line g =. 44382 ft' certified herd # i. volume of wash water according to structural design Oft3 j. excess rainfall over evaporation according to design 65657 It' k. (lines h + i + j) x 7.48 x 30 days/line f= 137182 gallons 4. Total PAN to be land applied during draw down period I. current waste analysis dated 8/3/2018 1.94 Ibs/1000 gal. m. ((lines e + k)/1000) x line I = 968.4 lbs. PAN REPEAT SECTION I FOR EACH WASTE STRUCTURE ON SITE. (Click on the next Structure tab shown below) PoA (30 Day) 2/21/00 b II. TOTAL POUNDS OF PAN STORED WITHIN STRUCTURAL FREEBOARD AND/OR 25 YR./24 HR. STORM STORAGE ELEVATIONS IN ALL WASTE STRUCTURES FOR FACILITY 1. Structure ID: 2627 line m = 17.0 lb PAN 2. Structure ID' 2748 line m = 427 lb PAN 3_ Structure ID: 3141 line m = 968.4 lb PAN 4. Structure ID: line m = lb PAN 5. Structure ID: line m = lb PAN 6. Structure ID: line m = lb PAN n.lines 1+2+3+4+5+6= 558.5lbPAN III. TOTAL PAN BALANCE REMAINING FOR AVAILABLE CROPS DURING 30 DAY DRAW DOWN PERIOD. DO NOT LIST FIELDS TO WHICH PAN CANNOT BE APPLIED DURING THIS 30 DAY PERIOD. o tract # p. field # q. crop r. acres s. remaining IRR 2 PAN balance (lb/acre) t• TOTAL PAN BALANCE FOR FIELD (lbs.) column r x s u. application window' Waters 13 Soybeans 3.06 57.45 175.8 Apr -Oct 7 Waters 14 Soybeans 2.40 47.96 115.1 Apr -Oct 7 Waters 16 Soybeans 4.19 86.68 363.2 Apr -Oct 7 Waters 18 Soybeans 4.35 60.09 261.4 Apr -Oct 7, Waters 27 -So beans 3.89 33.22 129.2 Apr -Oct 7 'State current crop ending application date or next crop application beginning date for available receiving crops during-30 day draw down period. v. Total PAN available for all fields (sum of column t) = 1044.7 lb. PAN IV. FACILITY'S PoA OVERALL PAN BALANCE w. Total PAN to be land applied (line n from section II) = 558.5 lb. PAN PoA (30 Day) 2/21/00 / x. Crop's remaining PAN balance (line v from section III) _ 1044.7 lb. PAN y. Overall PAN balance (w - x) _ -486 lb. PAN Line y must show as a deficit. if line y does not show as a deficit, list course of action here including pump and haul, depopulation, herd reduction, etc, For pump & haul and herd reduction options, recalculate new PAN based on new information. If new fields are to be included as an option for lowering lagoon level, add these fields to the PAN balance table and recalculate the overall PAN balance. If animal waste is to be hauled to another permitted facility, provide information regarding the herd population and lagoon freeboard levels at the receiving facility. ivt: Irrigation onto existing spray fields will continue as weather and field conditions permit. Additional land is available for pumping if needed. 0 PoA (30 Day) 2/21/00