HomeMy WebLinkAbout310035_Plan of Action_201809262-
PLAN OF ACTION(Poa) FOR HIGH FREEBOARD AT ANIMAL FACILITIES
Facility Number:
Facility Name:
AWS310035
Waters 1-6 & M&M Rivenbark
Certified Operator Name:
Derek Brown
County: Duplin
Operator Number.
AWA19632
1. Current liquid level(s) in inches as measured from the current liquid level in the lagoon to the
lowest point on the top of the dam for lagoons without spillways; and from the current liquid level
in the lagoon to the bottom of the spillway for lagoons with spillways.
Lagoon Name/ID:
Spillway(Y or N):
Level(inches):
Lagoon 1 Lagoon 2 Lagoon 3 Lagoon 4 Lagoon 5
2627 2748 3141
N 'N N
23 29 16
2. Check all applicable items
Liquid level is within the designed structural freeboard elevations of one or more structures.
Five and 30 day Plans of Action are attached. Hydraulic and agronomic balances are
Within acceptable ranges.
X Liquid level is within the 25 year 24 hour storm elevations for one or more structures. A
30 day Plan of Action is attached. Agronomic balance is within acceptable range.
Waste is to be pumped and hauled to off site locations. Bolume and PAN content of waste
to be pumped and hauled is reflected in section III tables. Included within this plan is a list
of the proposed sites with related facility numbers, number of acres and receiving crop
information. Contact and secure approval from the DWQ prior to transfer of waste to a site
not covered in the facility's CAWMP.
Operation will be partially or fully depopulated.
*Attach a complete schedule with corresponding animal units and dates fro depopulation
`if animals are to be moved to another permitted facility, provide facility number, lagoon
freeboard levels and herd population for the receiving facility
3. Earliest possible date to begin land application of waste:
As Conditions Permit
I hereby certify that I have reviewed the information listed above and Included within the
attached Plan of Action, and to the best of my knowledge and ability, the information is
accurate and correct.'
Murphy -Brown, LLC/Michael Norris Phone: (910) 293-3434
FA -#-�cility Own r/Ma ager (pri. Int)
Date: 9/25/2018
Facility Owne / anager ure)
PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES
30 DAY DRAW DOWN PERIOD
I. TOTAL PAN TO BE LAND APPLIED PER WASTE STRUCTURE
1. Structure Name/Identifier (ID): 2627
2. Current liquid volume in 25 yr./24 hr, storm storage & structural freeboard
a. current liquid level according to marker 23.0 inches
b. designed 25 yr.124 hr. storm & structural freeboard 20.3 inches
c, line b - line a (inches in red zone) _ -3 inches
d. top of dike surface area according to design
(area at below structural freeboard elevation) 93000 If
e, line c/12 x line d x 7.48 gallons/ft3-1 57678gallons
3. Projected volume of waste liquid produced during draw down period
f. temporary storage period according to structural design I 180 days
g. volume of waste produced according to structural design 8CE38-51 ft3
h. current herd # 2873 certified herd # 2873
actual waste produced = current herd # x line g = 80685 It'
certified herd #
i. volume of wash water according to structural design
j. excess rainfall over evaporation according to design
k. (lines h + i + j) x 7.48 x 30 days/line f=
4. Total PAN to be land applied during draw down period
I. current waste analysis dated 8/3/2018
m. ((lines e + k)/1000) x line I =
REPEAT SECTION I FOR EACH WASTE STRUCTURE ON SITE.
(Click on the next Structure tab shown below)
PoA (30 Day) 2/21100
0 ft3
54250 ft3
168219 gallons
1. 611 Ibs/1000 gal.
17.0 Ibs. PAN
i.
PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES
30 DAY DRAW DOWN PERIOD
1. TOTAL PAN TO BE LAND APPLIED PER WASTE STRUCTURE
9. Structure Name/ldentifier (ID): 12748
2. Current liquid volume in 25 yr./24 hr. storm storage & structural freeboard
a. current liquid level according to marker
b. designed 25 yr./24 hr. storm & structural freeboard
c. line b - line a (inches in red zone) =
d. top of dike surface area according to design
(area at below structural freeboard elevation)
e. line c/12 x line d x 7.48 gallons/ft3
3. Projected volume of waste liquid produced during draw down period
29.0 inches
21.6 inches
-7 inches
135512 ftz
-625072 gallons
f. temporary storage period according to structural design 180 days
g. volume of waste produced according to structural design 143901 ft3
h. current herd # 5124 certified herd # 5124
actual waste produced = current herd # x line g = 143901 ft'
certified herd #
i. volume of wash water according to,structural design
j. excess rainfall over evaporation according to design
k. (lines h + i + j) x 7.48 x 30 days/line f=
4. Total PAN to be land applied during draw down period
T
I. current waste analysis dated 8/3/2018
m. ((lines e + k)/1000) x line I =
REPEAT SECTION 1 FOR EACH WASTE STRUCTURE ON SITE.
(Click on the next Structure tab shown below)
Ofts
79049 ft3
277944 gallons
1.23 Ibs/1000 gal.
-427 lbs. PAN
PoA (30 Day) 2/21/00
PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES
30 DAY DRAW DOWN PERIOD
I. TOTAL PAN TO BE LAND APPLIED PER WASTE STRUCTURE
1. Structure Name/Identifier (ID): F 3 441
2. Current liquid volume in 25 yr.1,,24 hr. storm storage & structural freeboard
a. current liquid level according to marker
b. designed 25 yr./24 hr. storm & structural freeboard
c. line b - line a (inches in red zone) =
d. top of dike surface area according to design
(area at below structural freeboard elevation)
e. line c/12 x line d x 7.48 gallons/ft'
3. Projected volume of waste liquid produced during draw down period
15.0 inches
20.21 inches
5.2 inches
112554 ftz
362019 gallons
f. temporary storage period according to structural design 180 days
g. volume of waste produced according to structural design 44382 ft'
h. current herd # F 4310 certified herd #1 4310
actual waste produced = current herd # x line g =. 44382 ft'
certified herd #
i. volume of wash water according to structural design Oft3
j. excess rainfall over evaporation according to design 65657 It'
k. (lines h + i + j) x 7.48 x 30 days/line f= 137182 gallons
4. Total PAN to be land applied during draw down period
I. current waste analysis dated 8/3/2018 1.94 Ibs/1000 gal.
m. ((lines e + k)/1000) x line I = 968.4 lbs. PAN
REPEAT SECTION I FOR EACH WASTE STRUCTURE ON SITE.
(Click on the next Structure tab shown below)
PoA (30 Day) 2/21/00
b
II. TOTAL POUNDS OF PAN STORED WITHIN STRUCTURAL FREEBOARD AND/OR 25 YR./24
HR. STORM STORAGE ELEVATIONS IN ALL WASTE STRUCTURES FOR FACILITY
1. Structure ID: 2627 line m = 17.0 lb PAN
2. Structure ID' 2748 line m = 427 lb PAN
3_ Structure ID: 3141 line m = 968.4 lb PAN
4. Structure ID: line m = lb PAN
5. Structure ID: line m = lb PAN
6. Structure ID: line m = lb PAN
n.lines 1+2+3+4+5+6= 558.5lbPAN
III. TOTAL PAN BALANCE REMAINING FOR AVAILABLE CROPS DURING 30 DAY DRAW DOWN
PERIOD. DO NOT LIST FIELDS TO WHICH PAN CANNOT BE APPLIED DURING THIS 30 DAY PERIOD.
o tract #
p. field #
q. crop
r. acres
s. remaining IRR
2 PAN balance
(lb/acre)
t• TOTAL PAN
BALANCE FOR
FIELD (lbs.)
column r x s
u. application window'
Waters
13
Soybeans
3.06
57.45
175.8
Apr -Oct 7
Waters
14
Soybeans
2.40
47.96
115.1
Apr -Oct 7
Waters
16
Soybeans
4.19
86.68
363.2
Apr -Oct 7
Waters
18
Soybeans
4.35
60.09
261.4
Apr -Oct 7,
Waters
27
-So beans
3.89
33.22
129.2
Apr -Oct 7
'State current crop ending application date or next crop application beginning date for available
receiving crops during-30 day draw down period.
v. Total PAN available for all fields (sum of column t) = 1044.7 lb. PAN
IV. FACILITY'S PoA OVERALL PAN BALANCE
w. Total PAN to be land applied (line n from section II) = 558.5 lb. PAN
PoA (30 Day) 2/21/00 /
x. Crop's remaining PAN balance (line v from section III) _ 1044.7 lb. PAN
y. Overall PAN balance (w - x) _ -486 lb. PAN
Line y must show as a deficit. if line y does not show as a deficit, list course of action here including pump and
haul, depopulation, herd reduction, etc, For pump & haul and herd reduction options, recalculate new PAN
based on new information. If new fields are to be included as an option for lowering lagoon level, add these
fields to the PAN balance table and recalculate the overall PAN balance. If animal waste is to be hauled to
another permitted facility, provide information regarding the herd population and lagoon freeboard levels at the
receiving facility.
ivt:
Irrigation onto existing spray fields will continue as weather and field conditions permit. Additional land is
available for pumping if needed.
0
PoA (30 Day) 2/21/00