Loading...
HomeMy WebLinkAbout310789_Plan of Action_20180926�I i362-1 7S 3l-7ect PLAN OF ACTION(Poa) FOR HIGH FREEBOARD AT ANIMAL FACILITIES Facility Number: 31 - 789 County: Duptin Facility Name: Stanley Cavenaugh # 2 Certified Operator Name: Dennis Cavenaugh Operator Number 995239 1. Current liquid level(s) in inches as measured from the current liquid level in the lagoon to the lowest point on the top of the dam for lagoons without spillways; and from the current liquid level in the lagoon to the bottom .of the spillway for lagoons with spillways. Lagoon Name/ID: Spillway(Y or N): Level(inches): Lagoon 1. Lagoon 2 Lagoon 3 Lagoon 4 Lagoon 5 #2 N 17 2. Check all applicable items Liquid level is within the designed structural freeboard elevations of one or more structures. Five and 30 day Plans of Action are attached. Hydraulic and agronomic balances are within acceptable ranges. X -- Liquid level is within the 25 year 24 hour storm elevations for one or more structures. A 30 day Plan of Action is attached. Agronomic balance is within acceptable range. Waste is to be pumped and hauled to off site locations. Volume and PAN content of waste to be pumped and hauled is reflected in section III tables. Included within this plan is a list of the proposed sites with related facility numbers, number of acres and receiving crop information. Contact and secure approval from the DWQ prior to transfer of,waste to a site not covered in the facility's CAWMP. Operation will be partially or fully depopulated. `Attach a complete schedule with corresponding animal units and dates fro depopulation *if animals are to be moved to another permitted facility; provide facility number, lagoon freeboard levels and herd. population for the receiving facility 3 Earliest possible date to begin land application of waste: as conditions permit I hereby certify that I have reviewed the information listed above and included within the attached Plan of Action, and to the best of my knowledge and ability, the information is accurate and correct. Dennis Hogue Cavenaugh Phone: F cility Owner/Manager (print) Date: Facility Owner/Manag signature) 910-289-7696 9/16/2018 C-� II. TOTAL POUNDS OF PAN STORED WITHIN STRUCTURAL FREEBOARD ANWOR 25 YRJ24 HR. STORM STORAGE ELEVATIONS IN ALL WASTE STRUCTURES FOR FACILITY 1. Structure ID: Cavenaugh # 2 line m = 367.8 lb PAN 2. Structure ID: line m = lb PAN 3. Structure ID: line m = lb PAN 4. Structure ID: line m = lb PAN 5. Structure ID: line m = lb PAN 6. Structure ID: line m = lb PAN n.lines 1+2+3+4+5+g= 357.8lbPAN III. TOTAL PAN BALANCE REMAINING FOR AVAILABLE CROPS DURING 30 DAY DRAW DOWN PERIOD. DO NOT LIST FIELDS TO WHICH PAN r_eMwnT aG eool icn ni Iorwin -rwLI Wn r%AV n=rmr%r% O. tract # P. field # . q, crop r. acres s. remaining IRR 2 PAN balance (lb/acre) t. TOTAL PAN BALANCE FOR FIELD (Ibs.) column r x s u. application window T72440 7 Bermuda 2.05 82.03 168.2 March -Sept T72440 7A Bermuda 4.05 25.94 105.1 March -Sept Cavenau h 7 Fescue 4.04 121.75 491.9 Aug -July Cavenau h 8 Fescue 2.86 56.90 162.7 Aug -July Cavenau h 9 Fescue 2.48 86.26 213.9 Aug -July Cavenau h 10 Fescue 3.80 107.57 408.8 Aug -July .�.a« �IullGIjk LAW cnumy appucauon uaie or next crop appiicavon beginning date for available receiving crops during 30 day draw down period. V. Total PAN available for all fields (sum of column t) = 1550.5 lb. PAN IV. FACILITY'S PoA OVERALL PAN BALANCE w. Total PAN to be land applied (line n from section II) = 357.8 lb. PAN PoA (30 Day) 2/21/00 s x. ' Crop's remaining PAN balance (line v from section 111) = 1550.5 lb. PAN y. Overall PAN balance (w - x) _ -1193 lb. PAN Line y must show as a deficit. If line y does not show as a deficit, list course of action here including pump and haul;,depopulabon, herd reduction, etc. For pump & haul and herd reduction options, recalculate new PAN based on new information. If new fields are to be included as an option for lowering lagoon level, add these fields to the PAN balance table and recalculate the overall PAN balance. If animal waste is to be hauled to another permitted facility, provide information regarding the herd population and lagoon freeboard levels at the receiving facility. AKKAi IVt' , Irrigation onto existing spray fields will continue as weather and field conditions permit. Additional land is available for pumping if needed. PoA (30 Day) 2121/00 r, PLAN OF ACTION (POA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES 30 DAY DRAW DOWN PERIOD I. TOTAL PAN TO BE LAND APPLIED PER WASTE STRUCTURE 1. Structure Namelidentifier (ID): Cavenau h # 2 2. Current liquid volume in 25 yr./24 hr_ storm storage & structural freeboard a. current liquid level according to marker b. designed 25 yr/24 hr. storm & structural freeboard c. line b - line a (inches in red zone) _ d. top of dike surface area according to design (area at below structural freeboard elevation) e. line c/12 x line d x 7.48 gallons/ft' 3. Projected volume of waste liquid produced during draw down period 17.0 inches 19.0 inches 2.0 inches 64796 ft2 80779 gallons f. temporary storage period according to structural design- 180 days g. volume of waste produced according to structural design 85057.2 ft3 h. current herd # 1777 certified herd # 2580 actual waste produced = current herd # x line g = 58584 ft' certified herd # i. volume of wash water according to structural design ft3 j. excess rainfall over evaporation according to design u42500 ft3 k. (lines h + i + j) x 7.48 x 30 days/line f= 126018 gallons 4. Total PAN to be land applied during draw down period I. current waste analysis dated 7/4/2018 1.73 Ibs/1000 gal. m. ((lines e + k)/1060) x line 1 = 357.8 lbs. PAN REPEAT SECTION I FOR EACH WASTE STRUCTURE ON SITE. (Click on the next Structure tab shown below) PoA (30 Day) 2/21/00