Loading...
HomeMy WebLinkAbout310196_Plan of Action_20180926y- aG -rg )_0 16 () 3/ -m6 PLAN OF ACTION(Poa) FOR HIGH FREEBOARD AT ANIMAL FACILITIES Facility Number: 31-196 Facility Name: Ecosystem Farms, Inc. Certified Operator Name:, Mike Stocker County: Dupiin Operator Number: 18159 1. Current liquid level(s) in inches as measured from the current liquid level in the lagoon to the lowest point on the top of the dam for lagoons without spillways, and from the current liquid level in the lagoon to the bottom of the spillway for lagoons with spillways. Lagoon 1 Lagoon 2 Lagoon 3 Lagoon 4 Lagoon 5 Lagoon Name/ID: ECO 1 Spillway(Y or N): N Level(inches): 0 2. Check all applicable items Liquid level is within the designed structural freeboard elevations of one or more structures. Five and 30 day Plans of Action are attached. Hydraulic and agronomic balances are within acceptable ranges. X Liquid level is within the 25 year 24 hour storm elevations for one or more structures. A 30 day Plan of Action is attached. Agronomic balance is within acceptable range. Waste is to be pumped and hauled to off site locations. Bolume and PAN content of waste to be pumped and hauled is reflected in section III tables. Included within this plan is a list of the proposed sites with related facility numbers, numberof acres and receiving crop information. Contact and secure approval from the DWQ. prior to transfer of waste to a site not covered in the facility's CAWMP. Operation will be partially or fully depopulated. *Attach a complete schedule with corresponding animal units and dates fro depopulation *if animals are to be moved to another permitted facility, provide facility number, lagoon freeboard levels and herd population for the receiving facility 3. Earliest possible date to begin land application of waste: as conditions permit I hereby certify that I have reviewed the information listed above and included within the attached Plan of Action, and to the best of my knowledge and ability, the information is accurate and correct. . Mike Stocker Phone: (910) 293-3606 Facility Owner/Manager (print) Date: 9/26/2018 Facility Owner ger (signature) 11. TOTAL POUNDS OF P R D. WITHIN STRUCTURAL.FREEBOARD -FREEBOARD, ANDtPW25-YR.12* H 9,UQRM STORAGE ELEVATIONS IN ALL WASTE STRUCTURES FOR FACILITY' 1-. Structure 0: _ECbA' 6187:6 lb -PAN 2. Structure ID: ................... line-rm—, lb. PAN. 3. Structure ID: lb PAN, 4. Structure line m = lb PAN' 5. Structure ID: linetm= lb,,PA9 6. Structure ID: line,m,= lb PAN I I _ ii. Iffiles, I + 2 + 344 + 6 t 6 = 61-87.6-jib-PAN' Id., TOTALPAN. BALANCE REMAINING FOR AVAILABLE CROPS' -DURING 30 DAY, DRAW DOWN' PERIOD. DO NOT LIST FIELM TO WHICH C14 PAN -CANNOT o: tract,# p. field # q, crop r' acres 's.-remaining jRR. 2 PAN"Up-linde (Ib/acre)- t:TOTAL PAN BALANCE FOR E­1ELD_(b5.) cbl,umn-r x s y'appk*1on"_'hdow1 ECO I P1'_T1' R90r. a- 06 �75" 0 0 - lQ54.5,80-pt-Aptil- T2;;P2,Rye ',22Q6 ,"., _ -_ __. 75.'00 ,,, - -.465_4.5 Sieot-Aoril SbbTl--PIR 'e 6A 9 7 5,.'0 0 464.3 Sept -April Sub T2rP2 Rye. 6.119 75.00 464.3 Sbpt-Aoril Field R"e, 29-.R0, 75';00 2242.5 Sept-Apdl -:state current crop ending application date or next crop applic6tiod- beginning date fdr,availbble, receiving dJ?60s_dbdng 30 day draw down pedod. v. Total PAN available1dr all'fieldr; (sum of colUmn t)'= 6480.0 lb. PAN IV-. FACILITY'S PdA OVERALL PAN BALANCE %y. Total PAN td,be,land applied , Iihe:, h ft6th section 11) b;, 6187.6- lb. PAN PoA (30 Day) 2i21100 x. Crop's remaining PAN balance (line v from section III) = 6480.0 lb. PAN y. Overall PAN balance (w - x) _ -292 lb. PAN Line y must show as a deficit. If line y does not show as a deficit, list course of action here including pump and haul, depopulation, herd reduction, etc. For pump & haul and herd reduction options, recalculate new PAN based on new information. If new fields are to be included as an option for lowering lagoon level, add these fields to the PAN balance table and recalculate the overall PAN balance. If animal waste is to be hauled to another permitted facility, provide information regarding the herd population and lagoon freeboard levels at the receiving facility. Irrigation onto existing spray fields will continue as weather and field conditions permit. Additional land is available for pumping if needed. PoA (30 Day) 2/21/00 PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES 30 DAY DRAW DOWN PERIOD I. TOTAL PAN TO BE LAND APPLIED PER WASTE STRUCTURE 1. Structure Name/Identifier (ID): JECO 1 2. Current liquid volume in 25 yr./24 hr. storm storage & structural freeboard a. current liquid level according to marker linches a b. designed 25 yr./24 hr. storm & structural freeboard 19.0 inches c. line b - line a (inches in red zone) = 19.0 inches d. top of dike surface area according to design (area at below structural freeboard elevation) 225093 ft2 e. line c/12 x line d x 7.48 gallons/ft3 2665851 gallons 3. Projected volume of waste liquid produced during draw down period f. temporary storage period according to structural design 94 days g. volume of waste produced according to structural design 232561 ft3 h. current herd # 2600 certified herd # 4900 actual waste produced = current herd # x line g = 123400 ft' certified herd # i. volume of wash water according to structural design �0 ft3 j. excess rainfall over evaporation according to design 1313041 ft3 k. (lines h + i + j) x 7.48 x 30 days/line f= 608037 gallons 4. Total PAN to be land applied during draw down period I. current waste analysis dated 8/1/2018 1.89 Ibs/1000 gal. m. ((lines e + k)/1000) x line I = 6187.6 Ibs. PAN REPEAT SECTION, I FOR EACH WASTE STRUCTURE ON SITE. (Click on the next Structure tab shown below) PoA (30 Day) 2/21 /00