HomeMy WebLinkAbout310196_Plan of Action_20180926y- aG -rg
)_0 16 () 3/ -m6
PLAN OF ACTION(Poa) FOR HIGH FREEBOARD AT ANIMAL FACILITIES
Facility Number:
31-196
Facility Name: Ecosystem Farms, Inc.
Certified Operator Name:, Mike Stocker
County: Dupiin
Operator Number: 18159
1. Current liquid level(s) in inches as measured from the current liquid level in the lagoon to the
lowest point on the top of the dam for lagoons without spillways, and from the current liquid level
in the lagoon to the bottom of the spillway for lagoons with spillways.
Lagoon 1 Lagoon 2 Lagoon 3 Lagoon 4 Lagoon 5
Lagoon Name/ID: ECO 1
Spillway(Y or N): N
Level(inches): 0
2. Check all applicable items
Liquid level is within the designed structural freeboard elevations of one or more structures.
Five and 30 day Plans of Action are attached. Hydraulic and agronomic balances are
within acceptable ranges.
X Liquid level is within the 25 year 24 hour storm elevations for one or more structures. A
30 day Plan of Action is attached. Agronomic balance is within acceptable range.
Waste is to be pumped and hauled to off site locations. Bolume and PAN content of waste
to be pumped and hauled is reflected in section III tables. Included within this plan is a list
of the proposed sites with related facility numbers, numberof acres and receiving crop
information. Contact and secure approval from the DWQ. prior to transfer of waste to a site
not covered in the facility's CAWMP.
Operation will be partially or fully depopulated.
*Attach a complete schedule with corresponding animal units and dates fro depopulation
*if animals are to be moved to another permitted facility, provide facility number, lagoon
freeboard levels and herd population for the receiving facility
3. Earliest possible date to begin land application of waste: as conditions permit
I hereby certify that I have reviewed the information listed above and included within the
attached Plan of Action, and to the best of my knowledge and ability, the information is
accurate and correct. .
Mike Stocker
Phone: (910) 293-3606
Facility Owner/Manager (print)
Date: 9/26/2018
Facility Owner ger (signature)
11. TOTAL POUNDS OF P R D. WITHIN STRUCTURAL.FREEBOARD -FREEBOARD, ANDtPW25-YR.12*
H 9,UQRM STORAGE ELEVATIONS IN ALL WASTE
STRUCTURES FOR FACILITY'
1-. Structure 0: _ECbA'
6187:6 lb -PAN
2. Structure ID: ...................
line-rm—,
lb. PAN.
3. Structure ID:
lb PAN,
4. Structure
line m =
lb PAN'
5. Structure ID:
linetm=
lb,,PA9
6. Structure ID:
line,m,=
lb PAN I I _
ii. Iffiles, I + 2 + 344 + 6 t 6 = 61-87.6-jib-PAN'
Id., TOTALPAN. BALANCE REMAINING FOR AVAILABLE CROPS' -DURING 30 DAY, DRAW DOWN'
PERIOD. DO NOT LIST FIELM TO WHICH C14 PAN -CANNOT
o: tract,#
p. field #
q, crop
r' acres
's.-remaining jRR.
2 PAN"Up-linde
(Ib/acre)-
t:TOTAL PAN
BALANCE FOR
E1ELD_(b5.)
cbl,umn-r x s
y'appk*1on"_'hdow1
ECO I
P1'_T1'
R90r.
a- 06
�75" 0 0
- lQ54.5,80-pt-Aptil-
T2;;P2,Rye
',22Q6
,".,
_
-_ __. 75.'00
,,, - -.465_4.5
Sieot-Aoril
SbbTl--PIR
'e
6A 9
7 5,.'0 0
464.3
Sept -April
Sub T2rP2
Rye.
6.119
75.00
464.3
Sbpt-Aoril
Field
R"e,
29-.R0,
75';00
2242.5
Sept-Apdl
-:state current crop ending application date or next crop applic6tiod- beginning date fdr,availbble,
receiving dJ?60s_dbdng 30 day draw down pedod.
v. Total PAN available1dr all'fieldr; (sum of colUmn t)'=
6480.0 lb. PAN
IV-. FACILITY'S PdA OVERALL PAN BALANCE
%y. Total PAN td,be,land applied , Iihe:, h ft6th section 11) b;, 6187.6- lb. PAN
PoA (30 Day) 2i21100
x. Crop's remaining PAN balance (line v from section III) = 6480.0 lb. PAN
y. Overall PAN balance (w - x) _ -292 lb. PAN
Line y must show as a deficit. If line y does not show as a deficit, list course of action here including pump and
haul, depopulation, herd reduction, etc. For pump & haul and herd reduction options, recalculate new PAN
based on new information. If new fields are to be included as an option for lowering lagoon level, add these
fields to the PAN balance table and recalculate the overall PAN balance. If animal waste is to be hauled to
another permitted facility, provide information regarding the herd population and lagoon freeboard levels at the
receiving facility.
Irrigation onto existing spray fields will continue as weather and field conditions permit. Additional land is
available for pumping if needed.
PoA (30 Day) 2/21/00
PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES
30 DAY DRAW DOWN PERIOD
I. TOTAL PAN TO BE LAND APPLIED PER WASTE STRUCTURE
1. Structure Name/Identifier (ID): JECO 1
2. Current liquid volume in 25 yr./24 hr. storm storage & structural freeboard
a. current liquid level according to marker linches
a
b. designed 25 yr./24 hr. storm & structural freeboard 19.0 inches
c. line b - line a (inches in red zone) = 19.0 inches
d. top of dike surface area according to design
(area at below structural freeboard elevation) 225093 ft2
e. line c/12 x line d x 7.48 gallons/ft3 2665851 gallons
3. Projected volume of waste liquid produced during draw down period
f. temporary storage period according to structural design 94 days
g. volume of waste produced according to structural design 232561 ft3
h. current herd # 2600 certified herd # 4900
actual waste produced = current herd # x line g = 123400 ft'
certified herd #
i. volume of wash water according to structural design �0 ft3
j. excess rainfall over evaporation according to design 1313041 ft3
k. (lines h + i + j) x 7.48 x 30 days/line f= 608037 gallons
4. Total PAN to be land applied during draw down period
I. current waste analysis dated 8/1/2018 1.89 Ibs/1000 gal.
m. ((lines e + k)/1000) x line I = 6187.6 Ibs. PAN
REPEAT SECTION, I FOR EACH WASTE STRUCTURE ON SITE.
(Click on the next Structure tab shown below)
PoA (30 Day) 2/21 /00