Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
20190466 Ver 1_Table from 470035_Permit Drawings_20190603_20190702
WETLAND PERMIT IMPACT SUMMARY WETLAND IMPACTS SURFACE WATER IMPACTS Site No. Station (From/To) Structure Size / Type Permanent Fill In Coastal Wetlands (ac) Temp. Fill In Coastal Wetlands (ac) Excavation in Coastal Wetlands (ac) Temp. Excavation in Coastal Wetlands (ac) Hand Clearing in Coastal Wetlands (ac) Permanent SW impacts (ac) Temp. SW impacts (ac) Existing Channel Impacts Permanent (ft) Existing Channel Impacts Temp. (ft) Natural Stream Design (ft) 1 -L- 14+82 to 15+52 1 @30', 1 @50' 21 " Cored Slab < 0.01 < 0.01 < 0.01 ** 17 TOTALS*: < 0.01 < 0.01 < 0.01 0.01 17 *Rounded totals are sum of actual impacts NOTES: SITE 1: Permanent Surface Water Impacts = 67.7 Sq. Ft. (0.002 Ac) Permanent Fill in Coastal Wetlands = 135.9 Sq. Ft. (0.003 Ac) Excavation in Coastal Wetlands = 69.6 Sq. Ft. (0.002 Ac) Hand Clearing in Coastal Wetlands = 78.2 Sq. Ft. (0.002 Ac) 2013 1024