Loading...
HomeMy WebLinkAbout20140090 Ver 5_U2579B sediment loss_June_20190624 Wanucha, Dave From:Euliss, Amy Sent:Monday, June 24, 2019 3:53 PM To:Wanucha, Dave Cc:Kiser, Marcus K; Suggs, Phillip H; Nifong, Johnny R; Wyrick, Scott D Subject:U2579B sediment loss Dave, We had a sediment loss on the U-2579B project following rain events that totaled 1.472” from Wednesday thru Saturday. The sediment loss was noted in today’s weekly walk through. No single event totaled 1” and did not trigger an inspection. The sediment most likely accumulated over multiple rain events. The loss is at the large dissipater on permit sheet 2 of 64. The sediment left the dissipater and overtopped the rock silt screen. I requested that they clean up the dissipater but leave any sediment in the wetland. The vegetation is very thick in the wetland and I believe removal would cause more damage. If you have any questions, let me know. Thanks. Amy Euliss Division 9 Environmental Officer North Carolina Department of Transportation 336 747 7802 office aeuliss@ncdot.gov 375 Silas Creek Parkway Winston Salem, NC 27127-7167 Email correspondence to and from this sender is subject to the N.C. Public Records Law and may be disclosed to third parties. 1