HomeMy WebLinkAbout20180784 Ver 1_Final Mitigation Plan posted_20190702 (2)Strickland, Bev
From: Crocker, Lindsay
Sent: Tuesday, July 02, 2019 12:33 PM
To: Kim Browning; Haupt, Mac; Tugwell, Todd J CIV USARMY CESAW (US); Davis, Erin B
Cc: Russell, Periann; Xu, Lin; Raymond Holz (rholz@restoratio nsystems.com); Alex Baldwin
Subject: Arabia Bay -Final Mitigation Plan posted
Thanks for the clarification, Kim.
The final Mitigation Plan for Arabia Bay was finalized this week, and included the final signed PJD by Beecher. Per the
requirements in the eApproval letter from the IRT, the final document was posted to our project page, along with the
summarized errata sheet with response to comments.
It is available here: https://deq.nc.gov/about/divisions/mitigation-services/dms-projects
DMS/RS will not submit a PCN Application, but ensure construction activities will occur 30 days after this email notice,
and that any other required permits are in place as necessary.
Let us know if you need anything else. Thanks.
Lindsay Crocker
NC DEQ Division of Mitigation Services
217 West Jones St., Raleigh, NC 27603
Office 919.707.8944
Cell 919.594.3910
lindsay.crocker@ncdenr.gov
Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed
to third parties unless the content is exempt by statute or other regulation.
-----Original Message -----
From: Browning, Kimberly D CIV USARMY CESAW (US) <Kimberly.D.Browning@usace.army.mil>
Sent: Tuesday, July 02, 2019 11:48 AM
To: Xu, Lin <lin.xu@ncdenr.gov>; Haupt, Mac <mac.haupt@ncdenr.gov>
Cc: Tugwell, Todd J CIV USARMY CESAW (US) <Todd.J.Tugwell@usace.army.mil>; Crocker, Lindsay
<Lindsay.Crocker@ncdenr.gov>; Russell, Periann <periann.russell@ncdenr.gov>
Subject: [External] RE: Permit Question for Wetland Only Projects (UNCLASSIFIED)
CAUTION: External email. Do not click links or open attachments unless you verify. Send all suspicious email as an
attachment to report.spam@nc.gov<maiIto: report.spam@nc.gov>
CLASSIFICATION: UNCLASSIFIED
Hi Lin
Correct, if you are not placing fill in a jurisdictional feature, you do not need a permit. I only have the JD request from
Axiom in my copy of the Draft Mitigation Plan --do you have the JD paperwork from the USACE PM, I think it's Gary
Beecher? I assume that will arrive with the final mitigation plan.
Hope that helps and Happy 4th,
Kim
Kim Browning
Mitigation Project Manager, Regulatory Division I U.S. Army Corps of Engineers
3331 Heritage Trade Dr, Ste. 105 1 Wake Forest, NC 27587 1 919.554.4884 x60
BUILDING STRONG (r)
-----Original Message -----
From: Xu, Lin [mailto:lin.xu@ncdenr.gov]
Sent: Tuesday, July 02, 2019 8:34 AM
To: Browning, Kimberly D CIV USARMY CESAW (US) <Kimberly.D.Browning@usace.army.mil>; Haupt, Mac
<mac.haupt@ncdenr.gov>
Cc: Tugwell, Todd J CIV USARMY CESAW (US) <Todd.J.Tugwell@usace.army.mil>; Crocker, Lindsay
<Lindsay.Crocker@ncdenr.gov>; Russell, Periann <periann.russell@ncdenr.gov>
Subject: [Non-DoD Source] Permit Question for Wetland Only Projects
Good morning Kim and Mac,
DMS has several wetland only projects involving filling ditches, such as Arabia Bay. However, those ditches are non -
jurisdictional. Do we need to obtain 401/404 for those wetland only projects? Thank you very much for your time and
help.
Have a good day!
Lin
Lin Xu
Project Review Coordinator
Division of Mitigation Services
Department of Environmental Quality
(919) 707-8319 Office
(919) 219-8476 mobile
lin.xu@ncdenr.gov <mailto:lin.xu@ncdenr.gov>
1652 Mail Service Center
Raleigh, NC 27699-1652
Email correspondence to and from this address is subject to the
North Carolina Public Records Law and may be disclosed to third parties.
CLASSIFICATION: UNCLASSIFIED