HomeMy WebLinkAbout20070312 Ver 1_General Correspondence_200702196~~.
Coulter 1.7ewell IThamesPA
212 SOUTH LAMAR STREET
PO BOX 1066
ROXBORO NORTH CAROLINA 27573
p. 336.330.0388
Planning for th® future.
February t3, 2007
401 Oversight and Express Permits Unit
N.C. Division of Water Quality
2321 Crabtree Blvd, Suite 250
Raleigh, NC 27604
Re: Daniel Ridge Subdivision
Pre-Construction Notification
Person County, North Carolina
2 _,x312
Please find enclosed seven (7) copies of aPre-Construction Notification Application and associated attachments for
the Daniel Ridge Subdivision project. Also enclosed is a check for $200 to cover the permit cost. The project will
include construction of a subdivision road across a stream with Neuse River Buffers.
Should you need additional information during review of this Project, please do not hesitate to give me a call. We
look forward to a favorable response.
Sincerely,
Coulter Jewell Thames P.A.
`~t~~~~ ~
Steven P. Bailey, P.E.
Project Engineer
0 ~~
~ ~ ~i
F ~~, ~,
1 ~n
sT~~~ivw~~i<i
4T,~~, "'Nl'
H