Loading...
HomeMy WebLinkAbout710043_Plan of Action_201810292Lb I �a-Z q� PLAN OF ACTION(Poa) FOR HIGH FREEBOARD AT ANIMAL FACILITIES l�`2�2✓�� Facility Number: 71-43 County: Pender Facility Name: Paul Stanley #8 Certified Operator Name: Operator Number: 1. Current liquid level(s) in inches as -measured from the current liquid level in the lagoon to the lowest point on the top of the dam for lagoons without spillways; and from the current liquid level in the lagoon to the bottom of the spillway for lagoons with spillways. Lagoon Name/ID: Spillway(Y or N)- Level(inches): Lagoon Lagoon 2 Lagoon 3 Lagoon 4 Lagoon 5 PS#8 N 2 2. Check all applicable items Liquid level is within the designed structural freeboard elevations of one or more structures. Five and 30 day Plans of Action are attached. Hydraulic and agronomic balances are within acceptable ranges. X Liquid level is within the 25 year 24 hour storm elevations for one or more structures. A 30 day Plan of Action is attached. Agronomic balance is within acceptable range. Waste is to be pumped and hauled to off site locations. Volume and PAN content of waste to be pumped and hauled is reflected in section III tables. Included within this plan is a list of the proposed sites with related facility numbers, number of acres and receiving crop information. Contact and secure approval from the DWQ prior to transfer of waste to a site not covered in the facility's CAWMP. Operation will be partially or fully depopulated. *Attach a complete schedule with corresponding animal units and dates fro depopulation *if animals are to be moved to another permitted facility, provide facility number, lagoon freeboard levels and herd population for the receiving facility 3. Earliest possible date to begin land application of waste: Irrigation has begun I hereby certify that I have reviewed the information listed above and included within the attached Plan of Action, and to the best of my knowledge and ability, the information is accurate and correct. Greer Moore for: Paul Stanley Phone: 910-271-3039 Facility Owner/Manager (print) Paul Stanley Date: 10/29/2018 Facility Owner/Manager (signature) II. TOTAL POUNDS OF PAN STORED WITHIN STRUCTURAL FREEBOARD AND/OR 25 YR./24 HR. STORM STORAGE ELEVATIONS IN ALL WASTE STRUCTURES FOR FACILITY 1. Structure ID: PS #8 line m = 170.8 lb PAN 2. Structure ID: line m = lb PAN 3. Structure ID: line m = lb PAN 4. Structure ID: line m = lb PAN 5. Structure ID: line m = lb PAN 6. Structure ID: line m = lb PAN n. lines +2+3+4+5+6= 170.8 lb PAN III. TOTAL PAN BALANCE REMAINING FOR AVAILABLE CROPS DURING 30 DAY DRAW DOWN PERIOD. DO NOT LIST FIELDS TO WHICH PAN CANNOT BE APPLIED DURING THIS 30 DAY PERIOD. o. tract # p. field # q. crop r. acres s. remaining IRR t. TOTAL PAN u. application window' 2 PAN balance BALANCE FOR (lb/acre) FIELD (lbs.) column r x s 1 WC 10.00 100.00 1000.0 9/1-4/30 I I I I I I 1 1 .7lc7lC 1.U1I CI IL U1 UN GI IU11 Ry. C2lJ] 11UQUU1I UaLU U1 I1cJU U1 UN aNN11UauU1I ucyua u119 UaLc 1U1 QVQIIC2UIG receiving crops during 30 day draw down period. v. Total PAN available for all fields (sum of column t) = 1000.0 lb. PAN IV. FACILITY'S PoA OVERALL PAN BALANCE w. Total PAN to be land applied (line n from section II) = 170.8 lb. PAN PoA (30 Day) 2/21/00 x. Crop's remaining PAN balance (line v from section III) = 1000.0 lb. PAN y. Overall PAN balance (w - x) _ -829 lb. PAN Line y must show as a deficit. If line y does not show as a deficit, list course of action here including pump and haul, depopulation, herd reduction, etc. For pump & haul and herd reduction options, recalculate new PAN based on new information. If new fields are to be included as an option for lowering lagoon level, add these fields to the PAN balance table and recalculate the overall PAN balance. If animal waste is to be hauled to another permitted facility, provide information regarding the herd population and lagoon freeboard levels at the receiving facility. Farm has been out of operatin since 2015, however farm is being managed according to permit conditions until lagoons can be closed to NRCS Standard. Producer has also been working with PCSW to help with possilbe cost share for closing. Lagoon level was reported to DWR-WiRO after Hurricane Florence. FARM /S OUT OF OPERATION (since 2015) PoA (30 Day) 2/21/00 •,r PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES 30 DAY DRAW DOWN PERIOD I. TOTAL PAN TO BE LAND APPLIED PER WASTE STRUCTURE 1. Structure Name/Identifier (ID): PS #8 2. Current liquid volume in 25 yr./24 hr. storm storage & structural freeboard a. current liquid level according to marker 6.0 inches b. designed 25 yr./24 hr. storm & structural freeboard 19.0 inches c. line b - line a (inches in red zone) = 13.0 inches d. top of dike surface area according to design (area at below structural freeboard elevation) 16200 ftz e. line c/12 x line d x 7.48 gallons/ft3 131274 gallons r, 3. Projected volume of waste liquid produced during draw down period, f. temporary storage period according to structural design 180 days g. volume of waste produced according to structural design 174070 ft3 h. current herd # i00 certified herd # 1800 actual waste produced = current herd # x line g = ft3 certified herd # i. volume of wash water according to structural design j. excess rainfall over evaporation according to design k. (lines h + i + j) x 7.48 x 30 days/line f= 4. Total PAN to be land applied during draw down period I. current waste analysis dated 1 8/28/2018 m. ((lines e + k)/1000) x line I = REPEAT SECTION I FOR EACH WASTE STRUCTURE ON SITE. (Click on the next Structure tab shown below) 0 ft3 5163 ft3 6437 gallons 1,24 Ibs/1000 gal. 170.8 Ibs. PAN PoA (30 Day) 2/21/00