Loading...
HomeMy WebLinkAbout310593_Plan of Action_20181001f lL�L� QLD 411 PLAN OF ACTION(Poa) FOR HIGH FREEBOARD AT ANIMAL FACILITIES Facility Number: 31-593 County: Duplin Facility Name: Major Murray Farm Certified Operator Name: Dwight Strickland Operator Number: AWA 992836 1. Current liquid level(s) in inches as measured from the current liquid level in the lagoon to the lowest point on the top of the dam for lagoons without spillways; and from the current liquid level in the lagoon to the bottom of the spillway for lagoons with spillways. Lagoon Lagoon 2 Lagoon 3 Lagoon 4 Lagoon 5 Lagoon Name/ID: 1 Spillway(Y or N): N Level(inches): 0.1 2. Check all applicable items X Liquid level is within the designed structural freeboard elevations of one or more structures. Five and 30 day Plans of Action are attached. Hydraulic and agronomic balances are within acceptable ranges. X Liquid level' is within the 25 year 24 hour storm elevations for one or more structures. A 30 day Plan of Action is attached. Agronomic balance is.within acceptable range. Waste is to be pumped and hauled to off site locations. Bolume and PAN content of waste to be pumped and hauled is reflected in section Ill,tables. Included within this plan is a list of the proposed sites with related facility numbers, number of acres and receiving crop information. Contact and secure, approval from the DWQ prior to transfer of waste to a site not covered in the facility's CAWMP. Operation will be partially or fully depopulated. *Attach a complete schedule with corresponding animal units and dates for depopulation. *if animals are to be moved to another permitted facility, provide facility number, lagoon freeboard levels and herd population for the receiving facility 3. Earliest possible date to begin land application of waste: 9/23/18 I hereby certify that I have reviewed the information listed above and included within the attached Plan of Action, and to the best of my knowledge and ability, the information is accurate and correct. Dwight Strickland Phone: i Facility Owner/Manager (pri Date: cility Owner/Manager (sign re) a PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES 30 DAY DRAW DOWN PERIOD I. TOTAL PAN TO BE LAND APPLIED PER WASTE STRUCTURE 1. Structure Name/Identifier (ID)- I I Lagoon #1 2. Current liquid volume in 25 yr./24 hr. storm storage & structural freeboard a. current liquid level according to marker b. designed 25 yr./24 hr. storm & structural freeboard c. line b - line a (inches in red zone) = d. top of dike surface area according to design (area at below structural freeboard elevation) e. line c/12 x line d x 7.48 gallons/ft3 3. Projected volume of waste liquid produced during draw down period 6.11 inches 19.0 inches 18.9 inches 38025 fe 447973 gallons f. temporary storage period according to structural design 180 days g. volume of waste produced according to structural design 38902.1 ft3 h. current herd # 1170 certified herd # 1180 actual waste produced = current herd # x line g = certified herd # i. volume of wash,water according to structural design j. excess rainfall over evaporation according to design k. (lines h + i + j) x 7.48 x 30 days/line f= 4. Total PAN to be land applied during draw down period I. current waste analysis dated 1 7/4/18 m. ((lines e + k)/1000) x line I = REPEAT SECTION I FOR EACH WASTE STRUCTURE ON SITE. (Click on the next Structure tab shown below) PoA (30 Day) 2/21 /00 38572 ft3 LuJ ft3 23333.3 43 77176 gallons 0.76 Ibs/1000 gal. 399.1 lbs. PAN 0 II. TOTAL POUNDS OF PAN STORED WITHIN STRUCTURAL FREEBOARD AND/OR 25 YR.124 HR. STORM STORAGE ELEVATIONS IN ALL WASTE STRUCTURES FOR FACILITY 1. Structure ID- Lagoon #1 line m = 399.1 lb PAN 2. Structure ID- line m = lb PAN 3. Structure ID. line m = lb PAN G. Structure ID: line m = lb PAN 5. Structure ID. line m = lb PAN 6. Structure ID. line m = lb PAN n.linesl+2+3+4+5+6= 399.1 lb PAN III. TOTAL PAN BALANCE REMAINING FOR AVAILABLE CROPS DURING 30 DAY DRAW DOWN PFRIr)n nr) Nr)T l 1ST FIFI nS Tr) WNICN PAN (ANNr)T RF APPI IFn nl1RINr THIS io nAY PFRIOD_ o. tract # p. field # q. crop r. acres s remaining IRR-2 PAN balance (lb/acre) t. TOTAL PAN BALANCE FOR FIELD (lbs.) column r x s u. application window' zone 1 bermuda 1.18 121.10 142.9 Mar -Sept zone 2 bermuda 0.92 181.34 166.3 Mar -Sept zone 3 bermuda 1.15 176.12 203.1 Mar -Sept 'State current crop ending application date or next crop application beginning date for available receiving crops during 30 day draw down period v. Total PAN available for all fields (sum of column t) = 512.3 Ib. PAN IV. FACILITY'S PoA OVERALL PAN BALANCE w. Total PAN to be land applied (line n from section II) = 399.1 lb. PAN x. Crop's remaining PAN balance (line v from section III) = 512.3 lb. PAN y. Overall PAN balance (w - x) = -113 lb. PAN Line y must show as a deficit. If line y does not show as a deficit, list course of action here including pump and haul, depopulation, herd reduction, etc. For pump & haul and herd reduction options, recalculate new PAN based on new information. If new fields are to be included as an option for lowering lagoon level, add these fields to the PAN balance PoA (30 Day) 2/21/00 0 table and recalculate the overall PAN balance. It animal waste is to be hauled to another permitted tacility, provide information regarding the herd population and lagoon freeboard levels at the receiving facility. 114P%MIAM 1 IV". Irrigation onto existing spray fields will continue as weather and field conditions permit. Prior to Hurricane Florence, lagoon was in compliance at 41 inches freeboard. Due to heavy rainfall from Hurricane Florence, DWR was notified of inundation of approx. 36 hours or less. Animal waste'system was monitored daily for signs of discharge or breach, with none noted. At inspection on 1011/18, freeboard was at 14 inches with no evidence of structural concern. On 10/29/18 freeboard is at 32 inches. Information stated is as of call in date and was updated on 10/29/18 0 PoA (30 Day) 2/21/00