HomeMy WebLinkAbout310593_Plan of Action_20181001f lL�L�
QLD 411
PLAN OF ACTION(Poa) FOR HIGH FREEBOARD AT ANIMAL FACILITIES
Facility Number: 31-593 County: Duplin
Facility Name: Major Murray Farm
Certified Operator Name: Dwight Strickland Operator Number: AWA 992836
1. Current liquid level(s) in inches as measured from the current liquid level in the lagoon to the
lowest point on the top of the dam for lagoons without spillways; and from the current liquid level
in the lagoon to the bottom of the spillway for lagoons with spillways.
Lagoon Lagoon 2 Lagoon 3 Lagoon 4 Lagoon 5
Lagoon Name/ID: 1
Spillway(Y or N): N
Level(inches): 0.1
2. Check all applicable items
X Liquid level is within the designed structural freeboard elevations of one or more structures.
Five and 30 day Plans of Action are attached. Hydraulic and agronomic balances are
within acceptable ranges.
X Liquid level' is within the 25 year 24 hour storm elevations for one or more structures. A
30 day Plan of Action is attached. Agronomic balance is.within acceptable range.
Waste is to be pumped and hauled to off site locations. Bolume and PAN content of waste
to be pumped and hauled is reflected in section Ill,tables. Included within this plan is a list
of the proposed sites with related facility numbers, number of acres and receiving crop
information. Contact and secure, approval from the DWQ prior to transfer of waste to a site
not covered in the facility's CAWMP.
Operation will be partially or fully depopulated.
*Attach a complete schedule with corresponding animal units and dates for depopulation.
*if animals are to be moved to another permitted facility, provide facility number, lagoon
freeboard levels and herd population for the receiving facility
3. Earliest possible date to begin land application of waste:
9/23/18
I hereby certify that I have reviewed the information listed above and included within the
attached Plan of Action, and to the best of my knowledge and ability, the information is
accurate and correct.
Dwight Strickland Phone: i
Facility Owner/Manager (pri
Date:
cility Owner/Manager (sign re)
a
PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES
30 DAY DRAW DOWN PERIOD
I. TOTAL PAN TO BE LAND APPLIED PER WASTE STRUCTURE
1. Structure Name/Identifier (ID)- I I Lagoon #1
2. Current liquid volume in 25 yr./24 hr. storm storage & structural freeboard
a. current liquid level according to marker
b. designed 25 yr./24 hr. storm & structural freeboard
c. line b - line a (inches in red zone) =
d. top of dike surface area according to design
(area at below structural freeboard elevation)
e. line c/12 x line d x 7.48 gallons/ft3
3. Projected volume of waste liquid produced during draw down period
6.11 inches
19.0 inches
18.9 inches
38025 fe
447973 gallons
f. temporary storage period according to structural design 180 days
g. volume of waste produced according to structural design 38902.1 ft3
h. current herd # 1170 certified herd # 1180
actual waste produced = current herd # x line g =
certified herd #
i. volume of wash,water according to structural design
j. excess rainfall over evaporation according to design
k. (lines h + i + j) x 7.48 x 30 days/line f=
4. Total PAN to be land applied during draw down period
I. current waste analysis dated 1 7/4/18
m. ((lines e + k)/1000) x line I =
REPEAT SECTION I FOR EACH WASTE STRUCTURE ON SITE.
(Click on the next Structure tab shown below)
PoA (30 Day) 2/21 /00
38572 ft3
LuJ ft3
23333.3 43
77176 gallons
0.76 Ibs/1000 gal.
399.1 lbs. PAN
0
II. TOTAL POUNDS OF PAN STORED WITHIN STRUCTURAL FREEBOARD AND/OR 25 YR.124
HR. STORM STORAGE ELEVATIONS IN ALL WASTE STRUCTURES FOR FACILITY
1.
Structure ID- Lagoon #1
line m =
399.1 lb PAN
2.
Structure ID-
line m =
lb PAN
3.
Structure ID.
line m =
lb PAN
G.
Structure ID:
line m =
lb PAN
5.
Structure ID.
line m =
lb PAN
6.
Structure ID.
line m =
lb PAN
n.linesl+2+3+4+5+6= 399.1 lb PAN
III. TOTAL PAN BALANCE REMAINING FOR AVAILABLE CROPS DURING 30 DAY DRAW DOWN
PFRIr)n nr) Nr)T l 1ST FIFI nS Tr) WNICN PAN (ANNr)T RF APPI IFn nl1RINr THIS io nAY PFRIOD_
o. tract #
p. field #
q. crop
r. acres
s remaining IRR-2
PAN balance
(lb/acre)
t. TOTAL PAN
BALANCE FOR
FIELD (lbs.)
column r x s
u. application window'
zone 1
bermuda
1.18
121.10
142.9
Mar -Sept
zone 2
bermuda
0.92
181.34
166.3
Mar -Sept
zone 3
bermuda
1.15
176.12
203.1
Mar -Sept
'State current crop ending application date or next crop application beginning date for available
receiving crops during 30 day draw down period
v. Total PAN available for all fields (sum of column t) = 512.3 Ib. PAN
IV. FACILITY'S PoA OVERALL PAN BALANCE
w. Total PAN to be land applied (line n from section II) = 399.1 lb. PAN
x. Crop's remaining PAN balance (line v from section III) = 512.3 lb. PAN
y. Overall PAN balance (w - x) = -113 lb. PAN
Line y must show as a deficit. If line y does not show as a deficit, list course of action here including pump and haul,
depopulation, herd reduction, etc. For pump & haul and herd reduction options, recalculate new PAN based on new
information. If new fields are to be included as an option for lowering lagoon level, add these fields to the PAN balance
PoA (30 Day) 2/21/00
0
table and recalculate the overall PAN balance. It animal waste is to be hauled to another permitted tacility, provide
information regarding the herd population and lagoon freeboard levels at the receiving facility.
114P%MIAM 1 IV".
Irrigation onto existing spray fields will continue as weather and field conditions permit.
Prior to Hurricane Florence, lagoon was in compliance at 41 inches freeboard. Due to heavy rainfall from Hurricane
Florence, DWR was notified of inundation of approx. 36 hours or less. Animal waste'system was monitored daily for signs
of discharge or breach, with none noted. At inspection on 1011/18, freeboard was at 14 inches with no evidence of
structural concern. On 10/29/18 freeboard is at 32 inches. Information stated is as of call in date and was updated on
10/29/18
0