Loading...
HomeMy WebLinkAbout310588_Plan of Action_20181022PLAN OF ACTION(Poa) FOR HIGH FREEBOARD AT ANIMAL FACILITIES Facility Number: 31-588 County: Duplin Facility Name: Wells & Son's Certified Operator Name: Dekalb Wells Operator Number: 16759 10-?,�,2-18 31- ,26 1. Current liquid level(s) in inches as measured from the current liquid level in the lagoon to the lowest point on the top of the dam for lagoons without spillways; and from the current liquid level in the lagoon to the bottom of the spillway for lagoons with spillways. Lagoon'1 Lagoon 2 Lagoon 3 .Lagoon 4 Lagoon 5 Lagoon Name/ID: WS-F WS-S Spillway(Y or N): N N Level(inches): 14 14 2. Check all applicable items Liquid level is within the designed structural freeboard elevations of one or more structures. Five and 30 day Plans of Action are attached. Hydraulic and agronomic balances are within acceptable ranges. X Liquid level is within the 25 year 24 hour storm elevations for one or more structures. A 30 day Plan of Action is attached. Agronomic balance is within acceptable range. Waste is to be pumped and hauled to off site locations. Volume and PAN content of waste to be pumped and hauled is reflected in section III tables. Included within this plan is a list of the proposed sites with related facility, numbers, number of acres and receiving crop information. Contact and secure approval from the DWQ prior to transfer of waste to a site not covered in the facility's CAWMP. Operation will be partially or fully depopulated. *Attach a complete schedule with corresponding animal units and dates fro depopulation *if animals are to be moved to another permitted facility, provide facility number, lagoon freeboard levels and herd population for the receiving facility 3. Earliest possible date to begin land application of waste: Irrigation has begun I hereby certify that I have reviewed the information listed above and included within the attached Plan of Action, and to the best of my knowledge and ability, the information is accurate and correct. Greer Moore for : Dekalb Wells Facility Owner/Manager (print) Phone: 910-990-4464 Dekalb Wells Date: 10/22/2018 Facility Owner/Manager (signature) II. TOTAL POUNDS OF PAN STORED WITHIN STRUCTURAL FREEBOARD AND/OR 25 YR./24 HR. STORM STORAGE ELEVATIONS IN ALL WASTE STRUCTURES FOR FACILITY 1. Structure ID: WS-Fin line m = 458.9 lb PAN 2. Structure ID: WS-Sow line m = 172.7 lb PAN 3. - Structure ID: line m = lb PAN 4. Structure ID: line m = lb PAN 5. Structure ID: line m = lb PAN 6. Structure ID: line m = lb PAN n.lines 1+2+3+4+5+6= 631.6lbPAN III. TOTAL PAN BALANCE REMAINING FOR AVAILABLE CROPS DURING 30 DAY DRAW DOWN PERIOD. DO NOT LIST FIELDS TO WHICH PAN CANNOT BE APPLIED DURING THIS 30 DAY PERIOD. o: tract # p. field # q. crop r. acres s. remaining IRR 2 PAN balance (lb/acre) t. TOTAL PAN BALANCE FOR FIELD (Ibs.) column r x s u. application window' ALL SGO 89.64 50.00 4482.0 9/1-4/30 'State current crop ending application date or next crop application beginning date for available receiving crops during 30 day draw down period. v. Total PAN available for all fields (sum of column t) = 4482.0 lb. PAN IV. FACILITY'S PoA OVERALL PAN BALANCE w. Total PAN to be land applied (line n from section II) = 631.6 lb. PAN PoA (30 Day) 2/21/00 x. Crop's remaining PAN balance (line v from section III) = 4482.0 lb. PAN y. Overall PAN balance (w - x) _ -3850 lb. PAN Line y must show as a deficit. If line y does not show as a deficit, list course of action here including pump and haul, depopulation, herd reduction, etc. For pump & haul and herd reduction options, recalculate new PAN based on new information. If new fields are to be included as an option for lowering lagoon level, add these fields to the PAN balance table and recalculate the overall PAN balance. If animal waste is to be hauled to another permitted facility, provide information regarding the herd population and lagoon freeboard levels at the receiving facility. Wells & Son's Finishing Lagoon was 43" prior to Hurricane Florence, and 14" after storm. W&S Sow Farm lagoon was 43" prior to Hurricane Florence, and 14" after storm. Lagoon levels were reported to DWQ-WiRO after storm. PoA (30 Day) 2/21/00 PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES 30 DAY DRAW DOWN PERIOD I. TOTAL PAN TO BE LAND APPLIED PER WASTE STRUCTURE r 1. Structure Name/Identifier (ID): WS-Fin 2. Current liquid volume in 25 yr./24 hr. storm storage & structural freeboard a. current liquid level according to marker 14.0 inches b. designed 25 yr./24 hr. storm & structural freeboard 19.0 inches c. line b - line a (inches in red zone) = 5.0 inches d. top of dike surface area according to design (area at below structural freeboard elevation) 128700 ft� e. line c/12 x line d x 7.48 gallons/ft3 401115 gallons 3. Projected volume of waste liquid produced during draw down period f. temporary storage period according to structural design 180 days g. volume of waste produced according to structural design 169619 ft3 h. current herd # . 5145 certified herd # 5145 actual waste produced = current herd # x line g = 169619 ft3 certified herd # i. volume of wash water according to structural design Oft3 j. excess rainfall over evaporation according to design 83833 ft3 k. (lines h + i + j) x 7.48 x 30 days/line f= 315970 gallons 4. Total PAN to be land applied during draw down period I. current waste analysis dated 10/16/2018 0.64 Ibs/1000 gal: m. ((lines e + k)/1000) x line I = 458.9 lbs. PAN REPEAT SECTION I FOR EACH WASTE STRUCTURE ON SITE. (Click on the next Structure tab shown below) PoA (30 Day) 2/21 /00 ' V PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES 30 DAY DRAW DOWN PERIOD I. TOTAL PAN TO BE LAND APPLIED PER WASTE STRUCTURE 1. Structure Name/Identifier (ID): WS-Sow 2. Current liquid volume in 25 yr./24 hr. storm storage & structural freeboard a. current liquid level according to marker 14.01 inches b. designed 25 yr./24 hr. storm & structural freeboard 19.0 inches 'c. line b - line a (inches in red zone) = 5.0 inches d. top of dike surface area according to design (area at below structural freeboard elevation) F 66000 ft2 e. line c/12 x line d x 7.48 gallons/ft3 205700 gallons 3. Projected volume of waste liquid produced during draw down period f. temporary storage period according to structural design 180 days g. volume of waste produced according to structural design 79152 ft3 h. current herd # 624 certified herd # 624 actual waste, produced = current herd # x line g = 79152 ft' certified herd # i. volume of wash water according to structural design Oft3 j. excess rainfall over evaporation according to design 38500 ft3 k. (lines h + i +j) x 7.48 x 30 days/line f= 146673 gallons 4. Total PAN to be land applied during draw down period I. current waste analysis dated 10/16/2018 0.49 Ibs/1000 gal. m. ((lines e + k)/1000) x line I = 172.7 Ibs. PAN REPEAT SECTION I FOR EACH WASTE STRUCTURE ON SITE. (Click on the next Structure tab shown below) PoA (30 Day) 2/21 /00