Loading...
HomeMy WebLinkAboutNCS000389_Inspection Report_20190513ROY COOPER Governor MICHAEL S. REGAN Secretary S. DANIEL SMITH Interim Director DAK Americas, LLC — Cedar Creek Site Attn: Matthew Hendrickson, Site Director 3216 Cedar Creek Road Fayetteville, NC 28312 NORTH CAROLINA Environmental Quality May 16, 2019 Subject: COMPLIANCE EVALUATION INSPECTION NPDES Stormwater Permit NCS000389 DAK Americas, LLC — Cedar Creek Site Cumberland County Dear Mr. Hendrickson: On May 13, 2019, I, Michael Lawyer, Environmental Program Consultant with the Fayetteville Regional Office of the Division of Energy, Mineral and Land Resources (DEMLR) along with Lauren Garcia, Environmental Specialist with DEMLR's Stormwater Program conducted a site inspection for the DAK Americas, LLC — Cedar Creek Site facility located at 3216 Cedar Creek Road in Cumberland County, North Carolina. A copy of the Compliance Inspection Report is enclosed for your review. Ms. Elizabeth Wike, Senior Environmental Engineer, Mr. Rick Perez, SHE Supervisor, Ms. Sharon Frost and Mr. Miguel Burgoa were also present during the inspection and their time and assistance is greatly appreciated. The site visit and file review revealed that the subject facility is covered by NPDES Stormwater Permit NCS000389. Permit coverage authorizes the discharge of stormwater from the facility to receiving waters designated as the Cape Fear River, a Class C waterbody in the Cape Fear River Basin. As a result of the inspection, the facility was found to be in compliance with the conditions of NPDES Stormwater Permit NCS000389. Please refer to the enclosed Compliance Inspection Report for additional comments and observations made during the inspection. Please be advised that violations of the NPDES Stormwater Permit are subject to a civil penalty assessment of up to $25,000 per day for each violation. If you or your staff have any questions, comments, or needs assistance with understanding any aspect of your permit, please contact me at (910) 433-3394 or by e-mail at mike.lawyer@ncdenr.gov. Sincerely, Michael Lawyer, CPSWQ Environmental Program Consultant DEMLR Enclosure ec: Elizabeth Wike, Senior Environmental Engineer — DAK Americas, LLC cc: FRO — DEMLR, Stormwater Files ,,A North Carolina Department of Environmental Quality I Division of Energy, Mineral and Land Resources ;W/ Fayetteville Regional Office 1 225 Green Street. Suite 7141 Fayetteville, North Carolina 28301 NORTH CAROUNA ommaemEnN—viau:iro 910.433.3300 Compliance Inspection Report Permit: NCS000389 Effective: 07/01/10 Expiration: 06/30/15 Owner: Dak Americas LLC SOC: Effective: Expiration: Facility: Cedar Creek Site County: Cumberland 3216 Cedar Creek Rd Region: Fayetteville Fayetteville NC 28301 Contact Person: Elizabeth Wke Title: Senior Env. Engineer Phone: 910-371-4498 Directions to Facility: System Classifications: Primary ORC: Secondary ORC(s): On -Site Representative(s): On -site representative On -site representative On -site representative On -site representative Related Permits: NCS000056 Certification: Elizabeth Wike Rick Perez Miguel Burgoa Sharon Smith Frost Dak Americas LLC - DAK Americas Cedar Creek Site Inspection Date: 05/13/2019 Entry TiG�PM Primary Inspector: Mike Law';O- Secondary Inspector(s): '!`'" Lauren Garcia Reason for Inspection: Routine Permit Inspection Type: Stormwater Discharge, Individual Facility Status: Compliant ❑ Not Compliant Question Areas: Storm Water (See attachment summary) Exit Time: 04:50PM Phone: 910-512-4883 910-433-8227 910-433-8210 910-433-8232 Phone: 910-433-3300 ExV25' 3.3`3 K Inspection Type: Compliance Evaluation Page 1 of 3 Permit: NCS000389 Owner - Facility: Dak Americas LLC Inspection Date: 05/13/2019 Inspection Type : Compliance Evaluation Reason for Visit: Routine Inspection Summary: Inspection conducted concurrently with the Clear Path Recycling facility, which is co -located on the property. Both facilities are in the process of permit renewal. Made observations of stormwater discharge outfalls and overall site conditions. The site -specific Stormwater Pollution Prevention Plan was provided for review and is scheduled to be revised/updated as needed upon permit renewal. Monitoring has been conducted and recorded per requirements. Stormwater outfalls associated with the DAK Cedar Creek Site have been identified as 003, 004, F, G, H, I and J, however during the site observations it was determined that the internal drain pipe presented as outfall I is not a true stormwater discharge outfall and can be removed from the monitoring schedule. In regards to further monitoring of the remaining outfalls, the option and process for requesting Representative Outfall Status (RCS) was discussed and a copy of the ROS Request Form was provided at the time of inspection. Page 2 of 3 Permit: NCS000389 Owner - Facility: Dak Americas LLC Inspection Date: 05/13/2019 Inspection Type: Compliance Evaluation Reason for Visit: Routine Stormwater Pollution Prevention Plan Yes No NA NE Does the site have a Stormwater Pollution Prevention Plan? 0 ❑ ❑ ❑ # Does the Plan include a General Location (USGS) map? N ❑ ❑ ❑ # Does the Plan include a "Narrative Description of Practices"? ❑ ❑ ❑ # Does the Plan include a detailed site map including outfall locations and drainage areas? ❑ ❑ ❑ # Does the Plan include a list of significant spills occurring during the past 3 years? ❑ ❑ ❑ # Has the facility evaluated feasible alternatives to current practices? ❑ ❑ ❑ # Does the facility provide all necessary secondary containment? 0 ❑ ❑ ❑ # Does the Plan include a BMP summary? 0 ❑ ❑ ❑ # Does the Plan include a Spill Prevention and Response Plan (SPRP)? 0 ❑ ❑ ❑ # Does the Plan include a Preventative Maintenance and Good Housekeeping Plan? 0 ❑ ❑ ❑ # Does the facility provide and document Employee Training? 0 ❑ ❑ ❑ # Does the Plan include a list of Responsible Party(s)? E ❑ ❑ ❑ # Is the Plan reviewed and updated annually? 0 ❑ ❑ ❑ # Does the Plan include a Stormwater Facility Inspection Program? ❑ ❑ ❑ Has the Stormwater Pollution Prevention Plan been implemented? ❑ ❑ ❑ Comment: Qualitative Monitorinq Yes No NA NE Has the facility conducted its Qualitative Monitoring semi-annually? 0 ❑ ❑ ❑ Comment: Analytical Monitoring Yes No NA NE Has the facility conducted its Analytical monitoring? 0 ❑ ❑ ❑ # Has the facility conducted its Analytical monitoring from Vehicle Maintenance areas? ❑ ❑ 0 ❑ Comment: Permit and Outfalls Yes No NA NE # Is a copy of the Permit and the Certificate of Coverage available at the site? 0 ❑ ❑ ❑ # Were all outfalls observed during the inspection? ❑ ❑ ❑ # If the facility has representative outfall status, is it properly documented by the Division? ❑ ❑ E ❑ # Has the facility evaluated all illicit (non stormwater) discharges? 0 ❑ ❑ ❑ Comment: Page 3 of 3