Loading...
HomeMy WebLinkAbout20070296 Ver 1_Triage Comments_20070223DWQ~ ~~. b 2R l,a .Daze :~. ~ Z3 ~ 0~ - Who Reviewed: ~~ ~''~ ~ Plan Detail 7ncomplete - ~ ' ^ P1basa provide a Iocation map for the project. ' ~] Please show alI stream impacts including all fill elopes, dissipaters, and bank~stabilization on the site plan. ~(. Please show alI wetland impacts including 811 stapes on the site plan. • ^ Please indicate e11 buffer impacts on the site plan. ^ Please indicate proposed lot layout as overlays on the site plan. • ^ Please indicate the location of the protected buffcra as mverlays on the site plan. Please locate alI isolated or non-isolated wetlands, ~streama and other waters of the State as overlays on the site plan. ^ Please provide cross section details showing the provisions for aquatio life passage Please locate aay planned•sewar lines on the sife plan. . • Please provide fhe location of any proposed stormwater management practices ea requited by QC 3 y O~ (~ Please provide detail for the storn-wax~ management practices as required by C3C ~ `" `Z . • ^ Please specify the parcart of project imparviousness area based on the estimated builtrout oonditiona.• • Pleasaindicate all stormwatow'ro~}tfalIs on the sitoptail. • ^ Ploa'se'indicate the difli~se flow provision measures do the site plan. ^ Please indicate whether' ~or not the liropoaoii irnpaeta already been conducted. . Avoidauce,and/or Minimizatbn Not Provld~d ~ ~ ~ ~ ~ ~ • • 'Ihe labeled as on the plans does not appear to be neces®ary. Please eliminate the . or provide additional information as to why it is necessary for this pro,~ect.: • • . ^ This Office believes that the labeled on the plans as can be moved, or reconfigured to avoid the impacts to the .. . Please revise the plans m avoid thq impaets. ~ ~ ' ^. ~ This'Office beliav6s~that the •lalieled on the plena as~ can bo moved or roconflgured to;minimiu the irnpacta tQ the ' . Please revise the pleas to minimize the impaats. The stormwater discharges at the location on the plans labeled ~ will.not provide difl#~se flow through the buffar because ' ~ . Please revise the plane and provldq calculations to ~ahow that difliaae'flow v-RII be.achieved through the entirebuffar. If it - is not possible to achiove• diffuse flow through. the entire buff then it may bo necessary to' provide atormwatar management practices that remove nutrients.bofore the stormwater can be discharged through the. buffer. • Ottier . ~ .. ~ • ^•. The application fee was inauf6eiont•because.ovor 1S0 feet of stream and/or over i acre of wetiand'impacts wera requested Please provide $ .' This additional foe must be received before your application can bo reviewed. . ^ Please complete Section(s) on the apgiicatioa - _ . ^ Pleaseprovide a signed copy of the application.' ^ Please provide _. copipa of the application, . copies of •the site plans and other supportuig information; - ^ • Pleasasubmit electronic CXD 81es showing ~ :vie: email to ian.mcmfllan(tt~ncmdil.net and CIS . Mitigation ~ • ' ^ of compensatory mitigation is required far this project. ~ Please provide'a compensator mitigation plan.. The plan must conform to tharequiranents in 15 A NCAC 2A :0500•and musE be appropriate to the typaof impacts proposed. • ' ^ Please indicate which 404 Permit the USACE would use to authorize this project. ~ .