HomeMy WebLinkAbout20070226 Ver 1_Triage Comments_20070221nW~~ Zc~~ Gz2t,: ~~ Sato ? J2~~ l ~~
t .•
Plan Detail 7ncomplete - •
^ Please provide a location map for the project.
;.
Who Reviewed: ~ ~ • Vin. "~ ~ > ~T/,~- r
Please show all stream impacts including e11 fill slopes, dissipates, and bank stabilization on the site plan.
^. Please show atl wetland impacts including fill slopes on the site plan.
^ Please indicate all buffer impacts on the site plan.
^ Pleese indicsate proposed lot layout ea overlays on the site plea.
^ Please indicate the location of the protected bufftixs ae a~verlays oa the site plan.
Please locate at1 isolated or non-isolated wetlands, ~sireams and other watos of the State as overlays on the site plan. O~°t'.~
^ Please provide cross sxtion details showing the provisions for aquatic life passage.
^ Pieaso locate any plannod•sewor Iinea on the site plan. ~ •
^ Please provide the location of any proposed stormwatar management practices as required by QC
^ Please provide detail for the atormwater managemart practices as required by CiC
~;] Please specify the porcart of project imparviousness area based on the osdmated built-out conditions. i) ~/~
^ Please indicate all stormwat ~,o~}tfalls on the site phi. •
^ Plos'so indieato the diffuse flow provision measures do the site plan.
^ Please indicate whether •or not the proposed impacts already bears conducted. '
Avoidanco,and/or Minimization Not Provided ~ •
^ • The Iaboled as on the plena does not appear to bo necessary. Please eliminate the . or provide additional
information as to why it is necessary for this project..
• . [] This Office boliex~es that the labeled on the pleas as can be moved, or reconfigured to avoid the impacts to the
• .Please revise the plans to avoid thg impacts. ~ .
^. ~ Tlus'Office believes that the •lalieled on the plena as• ~ can be moved or reconfigured to :minimize the impacts tp'the
• . Please revise the pleas to minimize the impacts.
^ The stormwater discharges ai the location on the plans labeled ~ will.not provide diffuse flow through the buffer because
. Please ievise the plans and providq ealcu]atIons to •ahow that di$lise~ilow wall bo achieved through the artirebuffer. If it
is not possible to achieve. diSase flour through. the entire buffer then it may bm necessary to' provide atormwater maaagem~nt
practices that ranove nutrients .before the stormwater can be discharged through the. buffer. .
Oilier i
^•. The application fee was insuffieiart•because over 1S0 feet of stream and/or.over i acre ofwetland'impacts were requested. Please
provide $ ,This additional fee mus# bo roxived before your application can be reviewed.
^ Pleasse complete Section(s) on theapplication. - ~ '
^ Pl~aso provide a signed copy of the application.
^ Please provide _. copies of the application, . copies of •tho site pleas and other supporting information:
_ ^ • Please submit electronic C~1D files showing ~ ; via email to ian.mcmiylan(uncniail.net and CIk
Mitigation .
• • `~ of compensatory mitigation is required for this projdct. ~ Please provido'a cQmparsatory mitigation plan.. The ,r., ~.p A
'` plan must conform to thanxluirctnarts in 15 A NCAC 2H :0500 and must be appropriate to We type•of impacts proposed. U v v `
^ Please indicate which 404 Permit the USACE would use to authorize this project.
i~
y
~~, 0~~~ W y ~ ~~~ S~C~ty-5 ~L~k;
~~ S ~~
~ ~ ~~~~- C?.~1,'~ ~ L'FiS~ ~ Y~-6~.S~.IS~I`~-~ .
~~~ ~CI,U~ S 5 6'1~~;~ Ova
~.~,~ 6'~ ~ ~. S C ~ ~~
~~c~pex~-ouS
~~
z. ~. ~~ ~ ~ ~~. ~ is ~~~- -~ ~ ~.~~~~~~~ I ~a~~ . ~ ~ ~~s ~..~-~ ~.~
CCv~S~-~e_~ oti ~~~- ~a~, ~~-~ `~-S~-~C~1Ur~S s ~ ~~aCe ov~-
~i~ ~~ ~ ~
~ ~~~
~ ypellxrtu.x~t c,~re..tC~'Z.d un~.(~G~ ~ucc~-~
c~ cam., c~rtd ~ ~u~ a ~~ c;~-rnou.r~.t- °~5