Loading...
HomeMy WebLinkAbout20170239_Triple Barrel Culvert at Site 7 (water turned)_20190701Carpenter, Kristi From: Thomson, Nicole J Sent: Monday, July 01, 2019 11:06 AM To: Norton, April R; David.E.Bailey2@usace.army.mil Cc: Parker, Jerry A; Della Moore; Eason, Patty P; Mitch Wimberley Subject: Triple Barrel Culvert at Site 7 (water turned) Attachments: Right barrel 2.png; Middle barrel 2.png; Inlet.png; outlet 3.png; Inlet F1.png; Inlet F3.png; Outlet F1.png; Outlet F2.png Good morning everyone! This is a quick email with some documentation of the culvert at Site 7 that we discussed last week. The stream has been successfully turned into the culvert and, much as we all anticipated, all three barrels are full. The pictures document the final clean out of the culvert (removing any accumulated sediment/silt from the excessive rain events), replacement of the coir fiber matting on the floodplain bench and the final product. The perimeter measures are all in place and the banks are seeded and matted as necessary. Have a good week! Nik Nicole J. Thomson, PWS Division Environmental Supervisor Assistant Division Environmental Office 919-754-7806 Mobile Nithomson2a-ncdot.gov PO Box 14996 Greensboro, NC 27415-4996 1Att v� Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties. Email correspondence to and from this sender is subject to the N.C. Public Records Law and may be disclosed to third parties.