HomeMy WebLinkAbout20170239_Triple Barrel Culvert at Site 7 (water turned)_20190701Carpenter, Kristi
From: Thomson, Nicole J
Sent: Monday, July 01, 2019 11:06 AM
To: Norton, April R; David.E.Bailey2@usace.army.mil
Cc: Parker, Jerry A; Della Moore; Eason, Patty P; Mitch Wimberley
Subject: Triple Barrel Culvert at Site 7 (water turned)
Attachments: Right barrel 2.png; Middle barrel 2.png; Inlet.png; outlet 3.png; Inlet F1.png; Inlet
F3.png; Outlet F1.png; Outlet F2.png
Good morning everyone!
This is a quick email with some documentation of the culvert at Site 7 that we discussed last week. The stream has been
successfully turned into the culvert and, much as we all anticipated, all three barrels are full. The pictures document the
final clean out of the culvert (removing any accumulated sediment/silt from the excessive rain events), replacement of
the coir fiber matting on the floodplain bench and the final product. The perimeter measures are all in place and the
banks are seeded and matted as necessary.
Have a good week!
Nik
Nicole J. Thomson, PWS
Division Environmental Supervisor Assistant
Division Environmental Office
919-754-7806 Mobile
Nithomson2a-ncdot.gov
PO Box 14996
Greensboro, NC 27415-4996
1Att
v�
Email correspondence to and from this address is subject to the
North Carolina Public Records Law and may be disclosed to third parties.
Email correspondence to and from this sender is subject to the N.C. Public Records Law and may be disclosed to third parties.