Loading...
HomeMy WebLinkAbout20170951 Ver 1_Revision to Impacts_20181212 (2)Carpenter, Kristi From: Shaver, Brad E CIV USARMY CESAW (US) < Brad.E.Shaver@usace.army.mil > Sent: Wednesday, December 12, 2018 11:35 AM To: Westphal, Anneliese; Steenhuis, Joanne Cc: Herndon, T. Mason Subject: [External] RE: W-5601A_Rhodestown Rd -revision to impacts CAUTION: External email. Do not click links or open attachments unless verified. Send all suspicious email as an attachment to Report Spam.<mailto:report.spam@nc.gov> AW, I apologize for the late response but these changes still fall within Nationwide 14. 1 will file this exchange for the record. As always I appreciate your attention to detail, Brad -----Original Message ----- From: Westphal, Anneliese [mailto:awestphal@ncdot.gov] Sent: Tuesday, December 4, 2018 5:10 PM To: Shaver, Brad E CIV USARMY CESAW (US) <Brad.E.Shaver@usace.army.mil>; Steenhuis, Joanne <joanne.steenhuis@ncdenr.gov> Cc: Herndon, T. Mason <tmherndon@ncdot.gov> Subject: [Non-DoD Source] W-5601A_Rhodestown Rd -revision to impacts Brad and Joanne, On 10/18/2018, Mason sent you a revision to the amount of permanent impacts needed on the W-5601A project, as 8 feet of additional pipe was needed. Those impacts were originally thought to be needed at the outlet of the proposed pipe. However, the 8 feet of additional pipe was needed at the inlet of the proposed pipe. I have attached a plan sheet with a note to show where the extra 8 feet was added. Since that revision, the resident's office has also requested that the original 24" RCP pipe (which is under the existing roadbed) is failing at the shoulder point and at other locations within the run of the pipe. Therefore, the resident's office is requesting to remove the existing pipe once traffic is switched onto the new alignment. I have attached a plan sheet with a note calling out the location of this existing pipe. The contractor will plan to dewater the site during removal and will construct 3:1 side slopes with coir fiber matting to stabilize the area. The only jurisdictional feature on this project is the non-mitigable tributary at Site 1. The addition of the 8 feet of pipe, plus the impacts for removal of the original pipe will bring the total permanent impacts to 657ft2 or 0.0151 acre. Therefore, the total permanent impacts are now at 0.02 acre when rounded. Please see the attached revised impact summary sheet. Please note that the total temporary impacts did not show up in the bottom row since they are 0.004 acre. Please let me know if you have any questions. Thank you, Anneliese Anneliese Westphal Environmental Senior Specialist Division 3 NCDOT- Division of Highways 910 3412000 office 910 604 1330 mobile 910 675 0143 fax aestphal@ncdot.gov 5501 Barbados Blvd Castle Hayne, NC 28429-5647 Email correspondence to and from this sender is subject to the N.C. Public Records Law and may be disclosed to third parties.