HomeMy WebLinkAbout310548_Plan of Action_2018101731-5-q-9 PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES 30 DAY DRAW DOWN PERIOD I. TOTAL PAN TO BE LAND APPLIED PER WASTE STRUCTURE 10/15/2018 1. Structure Name/Identifier (ID): Cole Baker 31-548 2. Current liquid volume in 25 yr./24 hr. storm storage & structural freeboard a. current liquid level according to marker 15.0 inches b. designed 25 yr./24 hr. storm & structural freeboard F 19.0 inches c. line b - line a (inches in red zone) = 4.0 inches d. top of dike surface area according to design (area at below structural'freeboard elevation) 34515 ftz e. line c/12 x line d x 7.48 gallons/ft3 86057 gallons 3. Projected volume of waste liquid produced during draw down period f. temporary storage period according to structural design 180 days g. volume of waste produced according to structural design 39561.5 ft3 h. current herd # 1200 certified herd #1 1200 actual waste produced = current herd # x line g = 39562 W certified herd # i. volume of wash water according to structural design j. excess rainfall over evaporation according to design k. (lines h + i + j) x 7.48 x 30 days/line f= 4. -Total PAN to be land applied during draw down period I. current waste analysis dated 9/26/2018 m. ((lines e + k)/1000) x line I = REPEAT SECTION I FOR EACH WASTE STRUCTURE ON SITE. (Click on the next Structure tab shown below) 0 ft3 28060 ft3 84301 gallons 1.27 Ibs/1000 gal. 216.4 Ibs. PAN PoA (30 Day) 2/21 /00 10/18/2018 II. TOTAL POUNDS OF PAN STORED WITHIN STRUCTURAL FREEBOARD AND/OR 25 YRJ24 HR. STORM STORAGE ELEVATIONS IN ALL WASTE STRUCTURES FOR FACILITY 1. Structure ID: Cole Baker (31-548) line m = 216.4 lb PAN 2. Structure ID: line m = lb PAN 3. Structure ID: line m = lb PAN 4. Structure ID: line m = lb PAN 5. Structure ID: line m = lb PAN 6. Structure ID. line m = lb PAN n. lines 1 +2+3+4+5+6= 216.4 lb PAN III. TOTAL PAN .BALANCE REMAINING FOR AVAILABLE CROPS DURING 30 DAY DRAW DOWN PFRIOD_ DO NOT LIST FIFI nS TO WHICH PAN CAAIN(nT RF APPI IFn nl IRINr, TNI-q sn nev pGRlrin o. tract # p. field # q. crop r. acres s. remaining IRR 2 PAN balance (lb/acre) t. TOTAL PAN BALANCE FOR FIELD (lbs.) column r x s u. application window' 5788 1A Wheat 1.80 80.00 144.0 9/1 - 4/31 5788 1 B Wheat 4.00 80.00 320.0 9/1 - 4/31 5788 2B Wheat 1.80 80.00 144.0 9/1 - 4/31 5788 3 Wheat 7.00 80.00 560.0 9/1 - 4/31 State current crop ending application date or next crop application beginning date for available receiving crops during 30 day draw down period. v. Total PAN available for all fields (sum of column t) = 1168.0 lb. PAN IV. FACILITY'S PoA OVERALL PAN BALANCE w. Total PAN to be land applied (line n from section II) = 216.4 lb. PAN x. Crop's remaining PAN balance (line v from section III) = 1168.0 lb. PAN y. Overall PAN balance (w - x) = -952 lb. PAN PoA (30 Day) 2/21 /00 10/18/2018 Line y must show as a deficit. If line y does not show as a deficit, list -course of action here including pump and haul, depopulation, herd reduction, etc. For pump & haul,and herd reduction options, recalculate new PAN based on new information. If new fields are to be included as an option for lowering lagoon level, add these fields to the PAN- balance table and recalculate the overall PAN balance. If animal waste is to be hauled to another permitted facility, provide information regarding the herd population and lagoon freeboard levels at the receiving facility. See attachments for updated freeboard poa's. These farms are still in red and needed another 30 PoA. PoA (30 Day) 2/21 /00 10/18/2018