HomeMy WebLinkAbout310548_Plan of Action_2018101731-5-q-9
PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES
30 DAY DRAW DOWN PERIOD
I. TOTAL PAN TO BE LAND APPLIED PER WASTE STRUCTURE 10/15/2018
1. Structure Name/Identifier (ID): Cole Baker 31-548
2. Current liquid volume in 25 yr./24 hr. storm storage & structural freeboard
a. current liquid level according to marker 15.0 inches
b. designed 25 yr./24 hr. storm & structural freeboard F 19.0 inches
c. line b - line a (inches in red zone) = 4.0 inches
d. top of dike surface area according to design
(area at below structural'freeboard elevation) 34515 ftz
e. line c/12 x line d x 7.48 gallons/ft3 86057 gallons
3. Projected volume of waste liquid produced during draw down period
f. temporary storage period according to structural design 180 days
g. volume of waste produced according to structural design 39561.5 ft3
h. current herd # 1200 certified herd #1 1200
actual waste produced = current herd # x line g = 39562 W
certified herd #
i. volume of wash water according to structural design
j. excess rainfall over evaporation according to design
k. (lines h + i + j) x 7.48 x 30 days/line f=
4. -Total PAN to be land applied during draw down period
I. current waste analysis dated 9/26/2018
m. ((lines e + k)/1000) x line I =
REPEAT SECTION I FOR EACH WASTE STRUCTURE ON SITE.
(Click on the next Structure tab shown below)
0 ft3
28060 ft3
84301 gallons
1.27 Ibs/1000 gal.
216.4 Ibs. PAN
PoA (30 Day) 2/21 /00 10/18/2018
II. TOTAL POUNDS OF PAN STORED WITHIN STRUCTURAL FREEBOARD AND/OR 25 YRJ24
HR. STORM
STORAGE ELEVATIONS IN ALL WASTE STRUCTURES FOR FACILITY
1.
Structure ID: Cole Baker (31-548)
line m = 216.4 lb PAN
2.
Structure ID:
line m =
lb PAN
3.
Structure ID:
line m =
lb PAN
4.
Structure ID:
line m =
lb PAN
5.
Structure ID:
line m =
lb PAN
6.
Structure ID.
line m =
lb PAN
n. lines 1 +2+3+4+5+6= 216.4 lb PAN
III. TOTAL PAN .BALANCE REMAINING FOR AVAILABLE CROPS DURING 30 DAY DRAW DOWN
PFRIOD_ DO NOT LIST FIFI nS TO WHICH PAN CAAIN(nT RF APPI IFn nl IRINr, TNI-q sn nev pGRlrin
o. tract #
p. field #
q. crop
r. acres
s. remaining IRR
2 PAN balance
(lb/acre)
t. TOTAL PAN
BALANCE FOR
FIELD (lbs.)
column r x s
u. application window'
5788
1A
Wheat
1.80
80.00
144.0
9/1 - 4/31
5788
1 B
Wheat
4.00
80.00
320.0
9/1 - 4/31
5788
2B
Wheat
1.80
80.00
144.0
9/1 - 4/31
5788
3
Wheat
7.00
80.00
560.0
9/1 - 4/31
State current crop ending application date or next crop application beginning date for available
receiving crops during 30 day draw down period.
v. Total PAN available for all fields (sum of column t) = 1168.0 lb. PAN
IV. FACILITY'S PoA OVERALL PAN BALANCE
w. Total PAN to be land applied (line n from section II) = 216.4 lb. PAN
x. Crop's remaining PAN balance (line v from section III) = 1168.0 lb. PAN
y. Overall PAN balance (w - x) = -952 lb. PAN
PoA (30 Day) 2/21 /00 10/18/2018
Line y must show as a deficit. If line y does not show as a deficit, list -course of action here including pump and
haul, depopulation, herd reduction, etc. For pump & haul,and herd reduction options, recalculate new PAN
based on new information. If new fields are to be included as an option for lowering lagoon level, add these
fields to the PAN- balance table and recalculate the overall PAN balance. If animal waste is to be hauled to
another permitted facility, provide information regarding the herd population and lagoon freeboard levels at the
receiving facility.
See attachments for updated freeboard poa's. These farms are still in red and needed another 30 PoA.
PoA (30 Day) 2/21 /00
10/18/2018