Loading...
HomeMy WebLinkAboutNCC190787_NOI Application_20190628Action History (UTC-05:00) Eastern Time (US & Canada) Submit by Anonymous User 6/28/2019 11:33:52 AM (NCG01 NOI Submission) Approve by Morman, Alaina 6/28/2019 3:33:11 PM (Review- Construction NOI 12911) • The task was assigned to Morman, Alaina by round robin distribution 6/28/2019 11:34 AM The task was assigned to DEMLR NCG01 NOI Review Team. The due date is: July 2, 2019 5:00 PM 6/28/2019 11:34 AM Submit by Morman, Alaina 6/28/2019 3:37:17 PM (Payment Verification - NCG01-2019-0787) • The task was assigned to Morman, Alaina. The due date is: July 1, 2019 5:00 PM 6/28/2019 3:33 PM STME NORTH CAROLINA Ernvlronmentol qualily A. Project Information Part A. Project Location and Waterbody Inforrration 1. Project Name * Southpark Apartments Phase II 2. County* Lee 3. Highway or Street Commerce Drive Address * Street name only is acceptable if no address nurrtrer assigned yet 4. City or Township* Sanford 5. State * NC 1 r-i) iTi17G) M Fali (-:To a 10141 6. Zip Code* 27331 7. Latitude * Enter the latitude in decirral degrees 35.4217 8. Longitude * Enter the longitude in decirral degrees (MIST be negative) -79.1224 If you do not know the latitude and longitude coordinates for this project, you can search the location on this map of North Carolina. Look for the coordinates in the bottom left corner. 9. Date to Begin* 07/08/2019 Estimated Construction Project Start Date 10. Date to End* 09/01 /2020 Estimated Construction Project End Date 11. SIC (Primary)* Residential, Other than SFE (1522) Standard Industrial Gassification for Development 12. Acres to be 12.00 disturbed* (including off -site borrow and waste areas) 13. Total site area 15.63 (acres)* 14. Post- 10.45 construction (Estimated) impervious area (acres) * NCC Project NCC-LEE-2019-Southpark Apartments Phase II Tracking ID Assigned autorratically Below you must enter waterbody information for surface waters affected by this project. Please consult DWR's Surface Water Classifications Map Viewer to find waterbody name and corresponding index number. You may enter up to 3 waterbodies. 15a. Receiving Upper Little River Wate rbody* %rre of waterbody into which storawater runoff will discharge 15b. Waterbody 18-20-(1) Index No.* NC Waterbody Index Narrber Stormwater rJ No discharges will flow r Yes to additional wate rs * 16a. Is this project r Yes subject to the NC f No, not subject to NC SPCA Sediment Pollution Control Act?* B. Permittee Information Part B. Perrrittee Information - Legally Responsible Entity and Individual ..................................................................................................................................................................... h Important: The person who signs the NOI Certification Form and signs the Certification in Section E of this application form should be the same person as listed in THIS SECTION, or an authorized responsible individual within the same organization. That person must be a responsible corporate officer who owns or operates the construction activity, such as a president, secretary, treasurer, or vice president, or a manager that is authorized in accordance with Part IV, Section B, Item (6) of the NCG010000 General Permit. For more information on signatory requirements, see Part IV, Section B, Item (6) of that permit. 1. Organization South Park Village, LLC Name * 2. First Name* Carter ff Corporation, enter Registered Agent First l\brre 3. Last Name * Keller ff Corporation, enter Registered Agent Last Barre 3b. Title member -manager 4. Permitee E-mail Carter.Keller@CarolinaCommerciallnc.com Address* 5. Permittee 919-708-8987 Telephone No.* 6. Permittee Mailing Street Address Address* PO Box 130 Address Line 2 City Sanford Postal / Zip Code 27331 Check box if the r Yes street address the same as mailing address State / Province / Region NC Country usa 7. Permittee Street Street Address Address* 1600 Colon Road Address Line 2 City State / Province / Region Sanford nc Rastal / Zip Code Country 27330 usa C. Site Contact Information Part C. Roiect Site Contact Information 1. Type of Non -Government Ownership* 2. Primary Site Corey Contact - First Name * 3. Primary Site Mabus Contact - Last Name * 4. Title Project Manager 5. Site Contact E- Corey@CarolinaCommerciallnc.com mail Address* 6. Site Contact 910-728-5714 Telephone No.* 7. Organization Carolina Commercial Contractors Name 8. Site Contact Street Address Mailing Address* PO Box 130 Address Line 2 city Sanford Fbstal / Zip Code 27331 State / Province / Region NC Country USA D. E&SC Plan Part D. Erosion & Sediment Control (E&SC) Ran Approval Information ....................................................................................................................................................................................................................................... 1. Date E&SC Plan 06/26/2019 Approved * 2. E&SC Plan Project LEE-2019-029 Number/ID* Assigned by agency or local program 3. E&SC Plan f• State DEQ Office Approved by r Local Program 4. State DEQ Office * Raleigh (RRO) Documentation of E&SC Plan approval and the signed Notice of Intent (NOI) Certification Form is required for a complete application. 5. E&SC Plan LEE-2019-029 LOA 20190626.pdf 57.57KB Approval Mast be FDFfornat letter/documentation 6. NOI Certification NOI Certification - SPV.pdf 648.14KB Form Mist be RDFfornat This is an Express f• No Review Project* r Yes E. Certification North Carolina General Statute 143-215.613 (1) provides that: Anyperson who knowinglymakes any false statement, representation, or certification in anyapplication, record, report, plan, or other documentfiled or required to be maintained under this Article or a rule implementing this Article; or who knowinglymakes a false statement of a material fact in a rulemaking proceeding or contested case under this Article; or who falsifies, tampers with, or knowingly renders inaccurate any recording or monitoring deice or method required to be operated or maintained under this Article or rules of the Commission implementing this Article shall be guiltyofa Class 2 misdemeanor which mayinclude a fine not to exceed ten thousand dollars ($10,000). Under penalty of law, I certify that: rJ I am the person responsible for the construction activities of this project, for satisfying the requirements of this permit, and for any civil or criminal penalties incurred due to violations of this permit. * rJ The information submitted in this NOI is, to the best of my knowledge and belief, true, accurate, and complete based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information. * I7 I will abide by all conditions of the NCG010000 General Permit and the approved Erosion and Sediment Control Plan. * rJ I hereby request coverage under the NCG010000 General Permit and understand that coverage under this permit will constitute the permit requirements for the discharge(s) and is enforceable in the same manner as an individual permit. Specify if you are:* r The Responsible Person named on this Notice of Intent r Authorized Responsible Person* Important: The person who signs this Certification above and signs the NOI Certification Form should be the same person (or authorized responsible person within the same organization) as listed in Section B (Permittee Information) of this form. *An authorized individual is a responsible corporate officer who owns or operates the construction activity, such as a president, secretary, treasurer, or vice president, or a manager that is authorized in accordance with Part IV, Section B, Item (6) of the NCG010000 General Permit. For more information on signatory requirements, see Part IV, Section B, Item (6) of that permit. Signature Type Name * Carter Keller Title member -manager Organization South Park Village, LLC Date * 06/28/2019 F. Tracking and COC Info NOI Tracking No. 12911 NC Reference No. NCG01-2019-0787 Uses 'count _nunber'variable (increrrented by SP) Certificate of NCC190787 Coverage (COC) Uses'count_nunber'variable (incremented by SF) No. * Count Number 787 Sequential nunber for subrrittal that is increrrented by Stored Procedure COC Year 2019 Year of date reviewed (used to assign YY digits after "NGC' in OOCno.)