HomeMy WebLinkAboutDWR Response granting 2nd Extension to Keith Hinnant NOVRE restoration plan submittalFrom:
Scarbraugh. Anthony
To:
Bobby Billinaslev
Cc:
Teresa(obhinnantdentistry.com
Subject:
RE: [External] RE: Keith Hinnant Extension Approval
Date:
Friday, June 28, 2019 3:07:00 PM
Mr. Billingsley,
This Office will grant your client an additional 60 days to submit a revised restoration plan. This
Office will require the restoration to be submitted on or before September 1, 2019. Please note, this
will be the final extension to the subject violation.
Regards,
Anthony Scarbraugh
From: Bobby Billingsley [mailto:bobbybillingsley@thomasengineeringpa.com]
Sent: Thursday, June 27, 2019 7:37 AM
To: Scarbraugh, Anthony <anthony.scarbraugh@ncdenr.gov>
Cc: 'Teresa Kincaid' <Teresa@hinnantdentistry.com>
Subject: [External] RE: Keith Hinnant Extension Approval
External email. Do not click or open attac
LVchment to reoort.spamPnc.gov
Anthony,
This is to request additional time for the above referenced restoration plan submittal. We have just
received the septic area/layout/plan from the soil scientist late last week, outlining the area that will
work for wastewater. This took quite a while simply because everyone is so busy in construction
these days. This work came after it took quite some time to put together the house plan footprint
and site layout for where the house was to go. As you are aware the property is quite difficult and
tedious for siting. That being said, we are just now getting into the "grading" aspect of the plan,
figuring dirt, the bulkhead, and the restoration. The plan as you know is to get approval to bulkhead
the entire rear and revegetate that, and to swale the sides with piped ends through the bulkhead at
the end. To my knowledge the site is stable and protected from an erosion control standpoint. Also,
according to the owner the bulkhead work will need to be completed in the winter when the lake is
drained for maintenance, which apparently happens annually.
All that being said, we would like to request a 60 day extension to get the plan submitted, that day
being to submit by September 1St, ish. Is this ok?
Thanks,
Bobby Billingsley, PE
BobbyBillingsley(cDThomasEngineeringPA.com
ThomasEngineeringPA.com
T, -MAS est 1+983
ENGINEERING, PA
Phs. Address: 1316-B Commerce Drive
New Bern, NC 28562
Mail Address: PO Box 1309
New Bern, NC 28563
Office : 252.772.8011
Mobile: 252.671.2408
Fax: 252.636.2448
From: Scarbraugh, Anthony<anthony.scarbraugh(@ncdenr.gov>
Sent: Monday, March 11, 2019 8:54 AM
To: Bobby Billingsley(bobbybillingsleyPthomasengineeringpa.com)
<bobbybillingsleyCcDthomasengineeringpa.com>
Cc: Sullivan, Shelton <shelton.sullivan(@ncdenr.gov>
Subject: Keith Hinnant Extension Approval
Please find attached the restoration extension request approval for the subject violation. If you have
any questions, please feel free to contact me.
Regards,
Anthony Scarbraugh
Environmental Specialist II
Division of Water Resources — Water Quality Regional Operations
Department of Environmental Quality
252 948 3924 office
anthony.scarbraugh(@ncdenr.gov
943 Washington Square Mall
Washington, NC 27889
Email correspondence to and from this address is subject to the
North Carolina Public Records Law and may be disclosed to third parties.
0 Virus -free. www.avg.com