Loading...
HomeMy WebLinkAboutDWR Response granting 2nd Extension to Keith Hinnant NOVRE restoration plan submittalFrom: Scarbraugh. Anthony To: Bobby Billinaslev Cc: Teresa(obhinnantdentistry.com Subject: RE: [External] RE: Keith Hinnant Extension Approval Date: Friday, June 28, 2019 3:07:00 PM Mr. Billingsley, This Office will grant your client an additional 60 days to submit a revised restoration plan. This Office will require the restoration to be submitted on or before September 1, 2019. Please note, this will be the final extension to the subject violation. Regards, Anthony Scarbraugh From: Bobby Billingsley [mailto:bobbybillingsley@thomasengineeringpa.com] Sent: Thursday, June 27, 2019 7:37 AM To: Scarbraugh, Anthony <anthony.scarbraugh@ncdenr.gov> Cc: 'Teresa Kincaid' <Teresa@hinnantdentistry.com> Subject: [External] RE: Keith Hinnant Extension Approval External email. Do not click or open attac LVchment to reoort.spamPnc.gov Anthony, This is to request additional time for the above referenced restoration plan submittal. We have just received the septic area/layout/plan from the soil scientist late last week, outlining the area that will work for wastewater. This took quite a while simply because everyone is so busy in construction these days. This work came after it took quite some time to put together the house plan footprint and site layout for where the house was to go. As you are aware the property is quite difficult and tedious for siting. That being said, we are just now getting into the "grading" aspect of the plan, figuring dirt, the bulkhead, and the restoration. The plan as you know is to get approval to bulkhead the entire rear and revegetate that, and to swale the sides with piped ends through the bulkhead at the end. To my knowledge the site is stable and protected from an erosion control standpoint. Also, according to the owner the bulkhead work will need to be completed in the winter when the lake is drained for maintenance, which apparently happens annually. All that being said, we would like to request a 60 day extension to get the plan submitted, that day being to submit by September 1St, ish. Is this ok? Thanks, Bobby Billingsley, PE BobbyBillingsley(cDThomasEngineeringPA.com ThomasEngineeringPA.com T, -MAS est 1+983 ENGINEERING, PA Phs. Address: 1316-B Commerce Drive New Bern, NC 28562 Mail Address: PO Box 1309 New Bern, NC 28563 Office : 252.772.8011 Mobile: 252.671.2408 Fax: 252.636.2448 From: Scarbraugh, Anthony<anthony.scarbraugh(@ncdenr.gov> Sent: Monday, March 11, 2019 8:54 AM To: Bobby Billingsley(bobbybillingsleyPthomasengineeringpa.com) <bobbybillingsleyCcDthomasengineeringpa.com> Cc: Sullivan, Shelton <shelton.sullivan(@ncdenr.gov> Subject: Keith Hinnant Extension Approval Please find attached the restoration extension request approval for the subject violation. If you have any questions, please feel free to contact me. Regards, Anthony Scarbraugh Environmental Specialist II Division of Water Resources — Water Quality Regional Operations Department of Environmental Quality 252 948 3924 office anthony.scarbraugh(@ncdenr.gov 943 Washington Square Mall Washington, NC 27889 Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties. 0 Virus -free. www.avg.com