HomeMy WebLinkAboutKeith Hinnant NOV Additional Extention RequestFrom:
Bobby Billingsley
To:
Scarbrauah, Anthony
Cc:
"Teresa Kincaid"
Subject:
[External] RE: Keith Hinnant Extension Approval
Date:
Thursday, June 27, 2019 7:37:23 AM
Attachments:
Restoration Plan Submittal Extension Aoproval.pdf
PETIMPRIPExternal email. Do not click links or open attachments unless you verify. Send all suspicious email as an
attachment to report.spamPnc.eov
Anthony,
This is to request additional time for the above referenced restoration plan submittal. We have just
received the septic area/layout/plan from the soil scientist late last week, outlining the area that will
work for wastewater. This took quite a while simply because everyone is so busy in construction
these days. This work came after it took quite some time to put together the house plan footprint
and site layout for where the house was to go. As you are aware the property is quite difficult and
tedious for siting. That being said, we are just now getting into the "grading' aspect of the plan,
figuring dirt, the bulkhead, and the restoration. The plan as you know is to get approval to bulkhead
the entire rear and revegetate that, and to Swale the sides with piped ends through the bulkhead at
the end. To my knowledge the site is stable and protected from an erosion control standpoint. Also,
according to the owner the bulkhead work will need to be completed in the winter when the lake is
drained for maintenance, which apparently happens annually.
All that being said, we would like to request a 60 day extension to get the plan submitted, that day
being to submit by September 1St, ish. Is this ok?
Thanks,
Bobby Billingsley, PE
BobbyBillingsleyCcDThomasEngineeringPA.com
Thomas EngineeringPA.com
T f
OMAS est Y m
ENGINEERING, G, PA
Phs. Address: 1316-B Commerce Drive
New Bern, NC 28562
Mail Address: PO Box 1309
New Bern, NC 28563
Office : 252.772.8011
Mobile: 252.671.2408
Fax: 252.636.2448
From: Scarbraugh, Anthony <anthony.scarbraugh@ncdenr.gov>
Sent: Monday, March 11, 2019 8:54 AM
To: Bobby Billingsley (bobbybillingsley@thomasengineeringpa.com)
<bobbybillingsley@thomasengineeringpa.com>
Cc: Sullivan, Shelton <shelton.sullivan@ncdenr.gov>
Subject: Keith Hinnant Extension Approval
Please find attached the restoration extension request approval for the subject violation. If you have
any questions, please feel free to contact me.
Regards,
Anthony Scarbraugh
Environmental Specialist II
Division of Water Resources — Water Quality Regional Operations
Department of Environmental Quality
252 948 3924 office
anthony.scarbraugh(@ncdenr.gov
943 Washington Square Mall
Washington, NC 27889
Email correspondence to and from this address is subject to the
North Carolina Public Records Law and may be disclosed to third parties.
EX -1 Virus -free. www.avg.com
ROY COOPER
Governor
MICHAEL S. REGAN
Secretary
LINDA CULPEPPER
Director
Dr. Keith Hinnant
116 Twin Oaks Place
Goldsboro, NC 27530
Dear Dr. Hinnant:
NORTH CAROLINA
£nvironmentaI Qua[ity
March 8, 2019
Subject: Restoration Plan Submittal Extension
NOV-2018-PC-0141
Keith Hinnant Properties —106 and 108 Point Shore Dr.
Neuse River Riparian Buffer Violations
Wayne County
On February 6, 2019, this Office received a written response to NOV-2018-PC-0141. As part of this
response, a riparian buffer restoration plan was provided for approval. The plan indicated that two
species of wooded stem plants had been planted to restore Zone 1 of the riparian buffer. In addition, the
restoration plan indicated that grading and revegetation of Zone 2 would occur to reestablish diffuse flow.
On February 26, 2019, this Office received a request to submit a revised restoration plan after you have
finalize our onsite development plans. According to conversation with Mr. Billingsley of Thomas
Engineering, PA (your consultant), you are planning to install a bulkhead along the shoreline of the
property after the completing of site planning, layout, grading and determine wastewater disposal
method. At which time, you will apply for the necessary permits and authorizations from the Village of
Walnut Creek and this Office.
By copy of this letter, you will be required to submit an updated restoration plan by July 1, 2019 with a
schedule implementation.
Thank you for your attention to this matter. Should you have any questions regarding these matters,
please contact Anthony Scarbraugh or myself at (252) 946-6481.
Sincerely,
Anthony Scarbraugh, Environmental Specialist II
Water Quality Regional Operations Section
Division of Water Resources, NCDEQ
North Carolina Department of Environmental Quality I Division of Water Resources
cr�--D E Washington Regional Office 1 943 Washington Square Mall I Washington, North Carolina 27889
NORTH OaCi. inn
oepanmeM rEl 252.946.6481
cc: Shelton Sullivan —401 & Buffer Permitting Unit (via email)
laserfiche
Bobby Billingsley, Thomas Engineering, PA (via email)