Loading...
HomeMy WebLinkAbout20190827 Ver 1_EPCN Buffer Impacts Edit 06_28_19_201906286/28/2019 New Submission Are any other NWP(s), regional generaP permit(s), or individual permits(s) used, or intended to be used, to authorize any part of the proposed project or related activity? This includes other separate and distant crossing for linear projects that require Department of the Army authorization but don't require pre -Construction notification. D. Proposed Impacts Inventory 1. Impacts Summary la. Where are the impacts associated with your project? (check all that apply): Wetlands Streams -tributaries d Open Waters Pond Construction -1 Buffers 4. Open Water Impacts If there are proposed impacts to lakes, ponds, estuaries, tributaries, sounds, the Atlantic Ocean, or any other open water of the U.S. then individually list all open water impacts below. site #* (?) €I4a1. Impact Reason 14b. Impact type * (?) 4c. Name of waterbody (?) 12 'Sheet pile install P iPamlica Sound — --- Add another impact Activity type * 4e. Waterbody type* Bulkheads T Sound — 4g. Total temporary open water Impacts: UM 4g. Total permanent open water impacts: 0.40 4g. Total open water impacts: 0.40 4h. Comments: The primary purpose of this project is to protect the ferry basin. The sheet pile wall is also expected to help protect the area near the stacking lanes but the future groin project will address erosion in that area in more depth based on information currently being compiled through sampling, surveying and 6. Buffer Impacts (for DWR) If project will impact a protected riparian buffer, then complete the chart below. individually list all buffer impacts below. 6a. Project is in which protect basin(s)? Check all that apply. Neuse Tar -Pamlico Catawba Randleman Goose Creek Jordan Lake Other Impact Type" (?) ��Bc. Per or Temp* �6d. Stream name` (?i �LM.Impact 0.40 1 (acres) 13uffer mitigation required? Zone 1 impact* sg• zone 2 Permanent {P) or: amporary M [impact* https:Iledocs.deq.nc.gov/Forms!Pre-Construction_Notification_Form 6l10 6/28/2019 New Submission 5outhdock Allowable _ r Add anotber impact 6h. Total buffer impacts; Zone 1 Total Temporary impacts: 20,420.00 Zone 1 Total Permanent impacts: 0.00 •PamlicoSound4 Zone 2 6,476.00 Zone 2 0.00 Na 20,42D (6,476 (square feet) i (square feet) Zone 1 Zone 2 Total combined buffer impacts: 20,420.00 6,476.00 6i.. Comments: Shoreline stabilization Supporting Documentation - i.e. Impact Maps, Plan Sheet, etc. Click the upload button or drag and drop files here to attach document Upload File must be RDF E. Impact Justification and Mitigation 1. Avoidance and Minimization 1a. Specifically describe measures taken to avoid or minimize the proposed impacts in designing the project:'" i 1 1 b. Specifically describe measures taken to avoid or minimize the proposed impacts through construction techniques: 2. Compensatory Mitigation for Impacts to Waters of the U.S. or Waters of the State 2a. Does the project require Compensatory Mitigation for impacts to Waters of the U.S. or Waters of the State? Yes No NC Stream Temperature Classitcafion Maps can be found under the Mitigation Concepts tab on the Wilmington District's RIBITS(https://ribits.usace.army.miliribits_apex/f? p=107:27:2734709611497::NO:RP:P27_BUTTON_KEY:0) website. F. Stormwater Management and Diffuse Flow Plan (required by DWR) Recent changes to the stormwater rules have required updates to this section.— https://edocs.deq.nc,gov/Forms/Pre-Construction_Notifiication Form 7110