HomeMy WebLinkAbout20190557 Ver 1_CAMA Major Permit No. 55-19_20190626Permit Class
NEW
STATE OF NORTH CAROLINA
Department of Environmental Quality
and
Coastal Resources Commission
Permit
for
X Major Development in an Area of Environmental Concern
pursuant to NCGS 113A-118
Excavation and/or filling pursuant to NCGS 113-229
Permit Number
55-19
Issued to Equity Trust Co. Custodian FBO Katerina Braman IRA, 264 Main St., Swan Quarter, NC 27885
Authorizing development in Hyde County at adi. Ben Martin canal off Fodery Creek, at
519 NC HWY 45, in Swan Quarter as requested in the permittee's application dated 2/9/19, incl
att workplan drawings (2) Sheet 1 dated "Received DCM WARO 5/1/19" and Sheet 2 dated 2/21/19.
This permit, issued on June 26, 2019 , is subject to compliance with the application (where
consistent with the permit), all applicable regulations, special conditions and notes set forth below. Any violation
)f these terms may be subject to times, imprisonment or civil action; or may cause the permit to oe nuu ana vola.
Wetland Fill
1) Unless specifically altered herein, this permit authorizes the grading and other land disturbing
activities associated with the development of the above referenced property, including the fill of
2,000ft2 of Section 404 wetlands, all as expressly and specifically set forth in the attached permit
application and workplan drawings.
2) No vegetated wetlands or open water shall be excavated or filled, even temporarily, outside of the
approved fill alignment.
(See attached sheets for Additional Conditions)
This permit action may be appealed by the permittee or other
qualified persons within twenty (20) days of the issuing date.
This permit must be accessible on-site to Department
personnel when the project is inspected for compliance.
Any maintenance work or project modification not covered
hereunder requires further Division approval.
All work must cease when the permit expires on
December 31, 2022
In issuing this permit, the State of North Carolina agrees that
your project is consistent with the North Carolina Coastal
Management Program.
Signed by the authority of the Secretary of DEQ and the Chair
of the Coastal Resources Commission.
BraxtoA C. Davis, Director
Division of Coastal Management
This permit and its conditions are hereby accepted.
Signature of Permittee
Equity Trust Co., Custodian FBO Katerina Braman IRA Permit No. 55-19
Page 2 of 3
ADDITIONAL CONDITIONS
3) The alignment of the authorized fill shall be staked by the permittee and verified by a representative of
the Division of Coastal Management within a maximum of 30 days prior to the start of construction.
Failure to initiate construction within 30 days, or erosion of the shoreline by adverse weather conditions,
shall require the alignment to be re -staked by permittee and verified by DCM within a maximum of 30
days prior to the new expected start of construction.
4) The fill material shall be clean and free of any pollutants except in trace quantities.
Sedimentation and Erosion Control
5) Appropriate sedimentation and erosion control devices, measures or structures shall be implemented to
ensure that eroded materials do not enter adjacent wetlands, watercourses or properties.
6) A ground cover sufficient to restrain erosion shall be provided within 30 calendar days of completion of
any phase of grading on cut or filled slopes.
General
7) No attempt shall be made by the permittee to prevent the full and free use by the public of all navigable
waters at or adjacent to the authorized work.
8) This permit shall not be assigned, transferred, sold, or otherwise disposed of to a third party without the
written approval of the Division of Coastal Management.
9) The permittee shall maintain the authorized work in good condition and in conformance with the terms
and conditions of this permit. The permittee is not relieved of this requirement if he or she abandons the
permitted activity without having it transferred to a third party.
10) In order to ensure compliance with the conditions of this Permit, the permittee and his contractor shall
schedule a pre -construction conference with the Division of Coastal Management prior to the initiation
of any mobilization activities associated with the authorized activity.
NOTE: This permit does not eliminate the need to obtain any additional state, federal or local permits,
approvals or authorizations that may be required.
NOTE: The U.S. Army Corps of Engineers authorized the project by way of Programmatic General
Permit 198000291 (Action ID SAW- 2019-00729) issued 6/19/19.
NOTE: The N.C. Division of Water Resources authorized the proposed project by way of General Water
Quality Certification 4175 and assigned the project DWR Project No. 2019-0557.
Equity Trust Co., Custodian FBO Katerina Braman IRA Permit No. 55-19
Page 3 of 3
ADDITIONAL CONDITIONS
NOTE: Future development of the permittee's property may require a modification of this permit.
Contact a representative of the Division at (252) 946-6481 prior to the commencement of any
such activity for this determination. The permittee is further advised that many land disturbing
activities are not authorized within 50 feet of the normal water level unless specifically exempted
by Environmental Management Commission's (EMC) Tar Pamlico buffer regulations in
place at the time of such development.
NOTE: An application processing fee of $400 was received by DCM for this project.