HomeMy WebLinkAbout20190557 Ver 1_CAMA Major Permit No. 55-19_20190626Permit Class NEW STATE OF NORTH CAROLINA Department of Environmental Quality and Coastal Resources Commission Permit for X Major Development in an Area of Environmental Concern pursuant to NCGS 113A-118 Excavation and/or filling pursuant to NCGS 113-229 Permit Number 55-19 Issued to Equity Trust Co. Custodian FBO Katerina Braman IRA, 264 Main St., Swan Quarter, NC 27885 Authorizing development in Hyde County at adi. Ben Martin canal off Fodery Creek, at 519 NC HWY 45, in Swan Quarter as requested in the permittee's application dated 2/9/19, incl att workplan drawings (2) Sheet 1 dated "Received DCM WARO 5/1/19" and Sheet 2 dated 2/21/19. This permit, issued on June 26, 2019 , is subject to compliance with the application (where consistent with the permit), all applicable regulations, special conditions and notes set forth below. Any violation )f these terms may be subject to times, imprisonment or civil action; or may cause the permit to oe nuu ana vola. Wetland Fill 1) Unless specifically altered herein, this permit authorizes the grading and other land disturbing activities associated with the development of the above referenced property, including the fill of 2,000ft2 of Section 404 wetlands, all as expressly and specifically set forth in the attached permit application and workplan drawings. 2) No vegetated wetlands or open water shall be excavated or filled, even temporarily, outside of the approved fill alignment. (See attached sheets for Additional Conditions) This permit action may be appealed by the permittee or other qualified persons within twenty (20) days of the issuing date. This permit must be accessible on-site to Department personnel when the project is inspected for compliance. Any maintenance work or project modification not covered hereunder requires further Division approval. All work must cease when the permit expires on December 31, 2022 In issuing this permit, the State of North Carolina agrees that your project is consistent with the North Carolina Coastal Management Program. Signed by the authority of the Secretary of DEQ and the Chair of the Coastal Resources Commission. BraxtoA C. Davis, Director Division of Coastal Management This permit and its conditions are hereby accepted. Signature of Permittee Equity Trust Co., Custodian FBO Katerina Braman IRA Permit No. 55-19 Page 2 of 3 ADDITIONAL CONDITIONS 3) The alignment of the authorized fill shall be staked by the permittee and verified by a representative of the Division of Coastal Management within a maximum of 30 days prior to the start of construction. Failure to initiate construction within 30 days, or erosion of the shoreline by adverse weather conditions, shall require the alignment to be re -staked by permittee and verified by DCM within a maximum of 30 days prior to the new expected start of construction. 4) The fill material shall be clean and free of any pollutants except in trace quantities. Sedimentation and Erosion Control 5) Appropriate sedimentation and erosion control devices, measures or structures shall be implemented to ensure that eroded materials do not enter adjacent wetlands, watercourses or properties. 6) A ground cover sufficient to restrain erosion shall be provided within 30 calendar days of completion of any phase of grading on cut or filled slopes. General 7) No attempt shall be made by the permittee to prevent the full and free use by the public of all navigable waters at or adjacent to the authorized work. 8) This permit shall not be assigned, transferred, sold, or otherwise disposed of to a third party without the written approval of the Division of Coastal Management. 9) The permittee shall maintain the authorized work in good condition and in conformance with the terms and conditions of this permit. The permittee is not relieved of this requirement if he or she abandons the permitted activity without having it transferred to a third party. 10) In order to ensure compliance with the conditions of this Permit, the permittee and his contractor shall schedule a pre -construction conference with the Division of Coastal Management prior to the initiation of any mobilization activities associated with the authorized activity. NOTE: This permit does not eliminate the need to obtain any additional state, federal or local permits, approvals or authorizations that may be required. NOTE: The U.S. Army Corps of Engineers authorized the project by way of Programmatic General Permit 198000291 (Action ID SAW- 2019-00729) issued 6/19/19. NOTE: The N.C. Division of Water Resources authorized the proposed project by way of General Water Quality Certification 4175 and assigned the project DWR Project No. 2019-0557. Equity Trust Co., Custodian FBO Katerina Braman IRA Permit No. 55-19 Page 3 of 3 ADDITIONAL CONDITIONS NOTE: Future development of the permittee's property may require a modification of this permit. Contact a representative of the Division at (252) 946-6481 prior to the commencement of any such activity for this determination. The permittee is further advised that many land disturbing activities are not authorized within 50 feet of the normal water level unless specifically exempted by Environmental Management Commission's (EMC) Tar Pamlico buffer regulations in place at the time of such development. NOTE: An application processing fee of $400 was received by DCM for this project.