Loading...
HomeMy WebLinkAbout330020_Plan of Action_20190506PO Box 10009 Goldsboro, NC 27532 1 (919) 778-3130 Raleigh Regional Supervisor Division of Water Resources 1628 Mail Service Center Raleigh, NC 27699-1628 (919) 791-4200 To whom this may concern, NC Dept of Environmental Quality 1UN 2 61 2019 Raleigh Regional Office Enclosed are the Plans of Action (PDAs) for lagoon sludge management for the farms in your region. 42-13 Perry Sow Farm 33-20 Mayo Farm 51-40 Dunn Farm If you have questions regarding the enclosures, please don't hesitate to contact me at your convenience. Sincerely, Juliet Whitehurst 4� 4 UCkzUt5;QS- Tliet Whitehurst Environmental Compliance Administrator Maxwell Foods / Goldsboro Milling Jul iet.whit h u rst0goldsboro milli n ona Work: 919-778-3130 ext:1461 Cell: 252-289-2774 NC Dept of Environmental Quality PLAN OF ACTION (POA) FOR LAGOON SLUDGE REDUCTION Facility Number: 33-20 Facility Name: Mayo Farm Raleigh Regiolial 01,1ice County: Edgecombe Certified Operator Name: Chris Williams Operator #- 1002858 *Attach a copy of Lagoon Sludge Survey Form and volume worksheets Note: A certified Sludge Management Plan may be submitted In lieu of this POA. Compliance Timeframes: If the sludge level is equal to or higher than the stop pump level of the lagoon or if the sludge level results In an elevated waste analysis, a sludge management plan that meets the requirements of SB Interagency Group Guidance Document 1.26 must be prepared by a technical specialist and submitted to DWR within 90 days. Work to reduce the sludge level must begin within another 180 days. Compliance with NRCS Standard 359 must be achieved within two years of the original sludge survey. If the sludge level is non-compliant but below the stop pump level of the lagoon, a POA must be filed within 90 days and compliance with NRCS Standard 359 must be achieved within two years of the original sludge survey Indicatin non-compliance. If future sludge surveys do not show Improvement in sludge levels, DWR may require the owner to develop a sludge management plan that meets the requirements of SB Interagency Group Guidance Document 1.27. SPOA 9-15-2016 Page 1 of 3 La oon 1 Lagoon 2 Lagoon 3 Lagoon 4 Lagoon 5 Lagoon 6 a. Lagoon Name/ Identifier MAY1 b. Total Sludge Depth (ft) 5.2 c. Sludge Depth to be Removed for Compliance ,3 ft d, Sludge Volume to be Removed (gallons) 157,931 e. Sludge PAN (lbs/1000 gar) 10 f. Liquid PAN (lbs/1000 gal) g. PAN of Sludge (lbs) (d x e)/1000 Compliance Timeframes: If the sludge level is equal to or higher than the stop pump level of the lagoon or if the sludge level results In an elevated waste analysis, a sludge management plan that meets the requirements of SB Interagency Group Guidance Document 1.26 must be prepared by a technical specialist and submitted to DWR within 90 days. Work to reduce the sludge level must begin within another 180 days. Compliance with NRCS Standard 359 must be achieved within two years of the original sludge survey. If the sludge level is non-compliant but below the stop pump level of the lagoon, a POA must be filed within 90 days and compliance with NRCS Standard 359 must be achieved within two years of the original sludge survey Indicatin non-compliance. If future sludge surveys do not show Improvement in sludge levels, DWR may require the owner to develop a sludge management plan that meets the requirements of SB Interagency Group Guidance Document 1.27. SPOA 9-15-2016 Page 1 of 3 NARRATIVE: Use this section to describe the method(s) that will be used to lower the sludge depth. If microbe use is planned, specify the product to be used. Sludge ManagamenUoperation Plan Sludge Management Guide Lagoon evaluation data developed by NCSU and a review of lagoon management records of several lagoons showed that treatment capacity of the swine lagoons evaluated in NC was not significantly adversely affected by sludge accumulations of 50% or more of the planned treatment volume of the lagoon. Therefore It is telt that it Is permissible to allow sludge accumulation Into the planned treatment zone of properly monitored and managed lagoons provided that: • Nutrient values of the lagoon effluent are within the normal operating range. • There Is no noticeable Increase in lagoon odor. • Nuirlents land applied from the lagoon are properly accounted for in the application plan (WUP) Sludge Management Sludge In my lagoon will be managed by the following • Adequately monitor to define sludge volume, location, and rate of accumulation by conducting an annual sludge survey. • Maintain a minimum 25 feet deep zone, free of sludge at the pump Intake during Irrigation. • Position the pump Intake and manage the Irrigation operation such that the material Irrigated Is not more concentrated than the nutrient analysis samples. • sufficient monitoring to address concerns that nutrients are not over applied. • Other Items as required by DW61. I hereby certify that I have reviewed the information listed above and included within the attached Pian of Action, and to the best of my knowledge and ability, the Information Is accurate and correct. Maxwell Foods, LLC Facility Owner/Manager (print) GLS Facility Owner/Manager (signature) Phone: (919)778-3130 Date: 516119 Retum this form to: NC Division of Water Quality 1617 Mail Service Center Raleigh, NC 27699-1617 SPOA 5-18-04 Page 2 of 2