HomeMy WebLinkAbout310141_Plan of Action_20180921lq2- PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES 30 DAY DRAW DOWN PERIOD I. TOTAL PAN TO BE LAND APPLIED PER WASTE STRUCTURE 9/16/2018 1. Structure Name/Identifier (ID): B&P Farms, Inc. 31-141 1 Bobby Sholar Farm 2. Current liquid volume in 25 yr./24 hr. storm storage & structural freeboard a. current liquid level according to marker 19.0 inches b. designed 25 yr./24 hr. storm & structural freeboard 19.5 inches c. line b - line a (inches in red zone) = 0.5 inches d. top of dike surface area according to design (area at below structural freeboard elevation) 97026 ftZ e. line c/12 x line d x 7.48 gallons/W 30240 gallons 3. Projected volume of waste liquid produced during draw down period f. temporary storage period according to structural design 180 days g. volume of waste produced according to structural design 121058.1 ft3 h. current herd # 3672 certified herd # 3672 actual waste produced = current herd # x line g = certified herd # i. volume of wash water according to structural design j. excess rainfall over evaporation according to design k. (lines h + i +j) x 7.48 x 30 days/line,f= 4. Total PAN to be land applied during draw down period I. current waste analysis dated 8/7/2018 m. ((lines e + k)/1000) x line I = REPEAT SECTION I FOR EACH WASTE STRUCTURE ON SITE. (Click on the next Structure tab shown below) 121058 ft' 0 ft3 56598.5 ft3 221479 gallons 1.27 Ibs/1000 gal. 319.7 Ibs. PAN PoA (30 Day) 9/20/2018 PLAN OF ACTION (POA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES 30 DAY DRAW DOWN PERIOD I. TOTAL PAN TO BE LAND APPLIED PER WASTE STRUCTURE 1. Structure Name/Identifier (ID): B&P Farms, Inc.(31-141) (2) 2. Current liquid volume in 25 yr./24 hr. storm storage & structural freeboard a. current liquid level according to marker b. designed 25 yr./24 hr. storm & structural freeboard c. line b - line a (inches in red zone) _ d. top of dike surface area according to design (area at below structural freeboard elevation) e. line c/12 x line d x 7.48 gallons/ft3 3. Projected volume of waste liquid produced during draw down period 9/16/2018 Bobby Sholar Farm 12.0 inches 19.5 inches 7.5 inches 39950 ft2 186766 gallons f. temporary storage period according to structural design 180 days g. volume of waste produced according to structural design 40352.7 ft3 h. current herd # 1224 certified herd # 1224 actual waste produced = current herd # x line g = 40353 ft' certified herd # i. volume of wash water according to structural design Oft3 j. excess rainfall over evaporation according to design 37916.7 1ft3 k. (lines h + i +j) x 7.48 x 30 days/line f= 23304 gallons 4. Total PAN to be land applied during draw down period I. current waste analysis dated 1 8/7/2018 1.12 Ibs/1000 gal. m. ((lines e + k)/1000) x line I = . 1 235.3 lbs. PAN REPEAT SECTION I FOR EACH WASTE STRUCTURE ON SITE. (Click on the next Structure tab shown below) PoA (30 Day) 2/21/00 V II. TOTAL POUNDS OF PAN STORED WITHIN STRUCTURAL FREEBOARD AND/OR 25 YR./24 HR. STORM STORAGE ELEVATIONS IN ALL WASTE STRUCTURES FOR FACILITY 1. Structure ID: B&P Farms, Inc. (31-141) (1) line m = 319.7 lb PAN 2. Structure ID: B&P Farms, Inc.(31-141) (2) line m = •235.3 lb PAN 3. Structure ID: line m = lb PAN 4. Structure ID: line m = lb PAN 5. Structure ID: line m = lb PAN 6. Structure ID: -line m = lb PAN n.linesl+2+3+4+5+6= 555.0lbPAN III. TOTAL PAN BALANCE REMAINING FOR AVAILABLE CROPS DURING 30 DAY DRAW DOWN PERIOD. DO NOT LIST FIELDS TO WHICH PAN CANNOT BE APPLIED DURING THIS 30 DAY PERIOD. O. tract # p. -field # q. crop r. acres s. remaining IRR 2 PAN balance (lb/acre) t TOTAL PAN BALANCE FOR FIELD (lbs.) column r x s u. application window 6793 c 1 Bermudagrass Hay 13.70 100.00 1370.0 3/1 - 9/30 6793 c 2 Bermudagrass Hay 9.30 100.00 930.0 3/1 - 9/30 'State current crop ending application date or next crop application beginning date for available receiving crops during 30 day draw down period. , v. Total PAN available for all fields (sum of column t) = 2300.0 lb. PAN IV. FACILITY'S PoA OVERALL PAN BALANCE w. Total PAN to be land applied (line n from section II) = 555.0 lb. PAN x. Crop's remaining PAN balance (line v from section III) = 2300.0 lb. PAN y.' Overall PAN balance (w - x) _ -1745 lb. PAN I PoA (30 Day) 9/20/2018 r Line y must show as a deficit. If line y does not show as a deficit, list course of action here including pump and haul, depopulation, herd reduction, etc. For pump & haul and herd reduction options, recalculate new PAN based on new information. If new fields are to be included as an option for lowering lagoon level, add these fields to the PAN balance table and recalculate the overall PAN balance. If animal waste is to be hauled to another permitted facility, provide information regarding the herd population and lagoon freeboard levels at the receiving facility. As soon as weather permits I will resume pumping operation to get lagoon level back in compliance. PoA (30 Day) 9/20/2018