PLAN OF ACTION(Poa) FOR HIGH FREEBOARD AT ANIMAL FACILITIES
Facility Number: 71-91 County: Pender
Facility Name: Trumpeter Creek
Certified Operator Name. Brandon Elston Operator Number: AWA993659
1. Current liquid level(s) in inches as measured from the current liquid level in the lagoon to the
lowest point on the top of the dam for lagoons without spillways; and from the current liquid level
in the lagoon to the bottom of the spillway for lagoons with spillways.
Lagoon 1 Lagoon 2 Lagoon 3 Lagoon 4 Lagoon 5
Lagoon Name/ID: Lag 1
Spillway(Y or N):, N
Level(inches), 17
2. Check all applicable items
Liquid level is within the designed structural freeboard elevations of one or more structures.
Five and 30 day Plans of Action are attached. Hydraulic and agronomic balances are
within acceptable ranges.
X Liquid level is within the 25 year 24 hour storm elevations for one or more structures_ A
30 day Plan of Action is attached. Agronomic balance is within acceptable range.
Waste is to be pumped and hauled to off site locations. Bolume and PAN content of waste
to be pumped and hauled is reflected in section III tables. Included within this plan is a list
of the proposed sites with related facility numbers, number of acres and receiving crop
information. Contact and secure approval from the DWQ prior to transfer of waste to a site
not covered in the facility's.CAWMP. .
Operation will be partially or fully depopulated.
*Attach a complete schedule with corresponding animal units and dates fro depopulation
*if animals are to be moved to another permitted facility, provide facility number, lagoon
freeboard levels and herd population for the receiving facility
3. Earliest possible date to begin land application of waste: as conditions permit
I hereby certify that I have reviewed the information listed above and included within the
attached Plan of Action, and to the best of my knowledge and ability, the information is
accurate and correct.
Brandon Elston
Phone:- 910-271-2944
Facility Owner/Manager (print)
Date:
Facility Owner/Manager (signature)
11/5/2018
II. TOTAL POUNDS OF PAN STORED WITHIN STRUCTURAL FREEBOARD AND/OR 25 YR./24
HR. STORM STORAGE ELEVATIONS IN ALL WASTE STRUCTURES FOR FACILITY
1.
Structure ID: Trumpeter Creek
line m =
954.3 lb PAN
2.
Structure ID:
line m =
lb PAN
3.
Structure ID-
line m =
lb PAN
4.
Structure ID:
line m =
lb PAN
5.
Structure ID:
line m =
lb PAN
6.
Structure ID:
line m =
lb PAN
n.lines I+2+3+4+5+6= 954.3lbPAN
III. TOTAL PAN BALANCE REMAINING FOR AVAILABLE CROPS DURING 30 DAY DRAW DOWN
PERIOD. DO NOT LIST FIFI DR TO WWlr.W PAN rANNOT Rr- ADW iRn ni iomr_ ruic in nnv ocninn
o. tract #
p. field #
q. crop
r. acres
s. remaining IRR
2 PAN balance
(lb/acre)
t. TOTAL PAN
BALANCE FOR
FIELD (Ibs.)
column rxs
u. application window'
P1
Small Grain
22.32
50.00
1116.0
Sept -April
13
Small Grain
5.20
75.00
390.0
Sept -April
14
Small Grain
7.24
75.00
543.0
Sept -April
9
Small Grain
9.14
75.00
685.5
Sept -April
ardi� cuffum crop enaing application gate or next crop application beginning date for available
receiving crops during 30 day draw down period.
v. Total PAN available for all fields (sum of column t) = 2734.5 lb. PAN
IV. FACILITY'S PoA OVERALL PAN BALANCE
w. Total PAN to be land applied (line n from section II) = 954.3 lb. PAN
PoA (30 Day) 2/21/00
x. Crop's remaining PAN balance (line v from section III) = 2734.5 lb. PAN
y. Overall PAN balance (w - x) _ -1780 lb. PAN
Line y must show as a deficit. If line y does not show as a deficit, list course of action here including pump and
haul, depopulation, herd reduction, etc, For pump & haul and herd reduction options, recalculate new PAN
based on new information. If new fields are to be included as an option for lowering lagoon level, add these
fields to the PAN balance table and recalculate the overall PAN balance. If animal waste is to be hauled to
another permitted facility, provide information regarding the herd population and lagoon freeboard levels at the
receiving facility.
Irrigation onto existing spray fields will continue as weather and field conditions permit. Additional land is
available for pumping if needed. Can begin applying on Corn Feb 15. This farm is in the process of selling
pigs. Producer is in the process of finding a place to haul water if needed.
PoA (30 Day) 2121/00
PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES
30 DAY DRAW DOWN PERIOD
I. TOTAL PAN TO BE LAND APPLIED PER WASTE STRUCTURE
1. Structure Name/Identifier (ID).- ITrumpeter Creek
2. Current liquid volume in 25 yr./24 hr. storm storage & structural freeboard
a. current liquid level according to marker
b. designed 25 yr./24 hr. storm & structural freeboard
c line b - line a (inches in red zone) =
d. top of dike surface area according to design
(area at below structural freeboard elevation)
e. line c/12 x line d x 7.48 gallons/ft3
3 Projected volume of waste liquid produced during draw down period
17.0 inches
19 01 inches
2.0 inches
242011 ft2
301707 gallons
f. temporary storage period according to structural design 180 days
g. volume of waste produced according to structural design 282469 ft3
h. current herd # F---8-5-681 certified herd # 8568
actual waste produced = current herd # x line g = 282469 ft3
certified herd #
i. volume of wash water according to structural design 01ft3
j. excess rainfall over evaporation according to design 141173 ft3
k. (lines h + i + j) x 7.48 x 30 days/line f= 528140 gallons
4. Total PAN to be land applied during draw down period
I. current waste analysis dated 7/13/2018
m. ((lines e + k)/1000) x line I =
REPEAT SECTION I FOR EACH WASTE STRUCTURE ON SITE.
(Click on the next Structure tab shown below)
PoA (30 Day) 2/21/00
1.15 Ibs/1000 gal.
954.3 Ibs. PAN