HomeMy WebLinkAbout310670_Plan of Action_20181114I I I/- N--(6 PLAN OF ACTION(Poa) FOR HIGH FREEBOARD AT ANIMAL FACILITIES Facility Number: 31-670 Facility Name: Quail Run County: Duplin Certified Operator Name: Joe Szaloky Operator Number: AWA999328 1. Current liquid level(s) in inches as measured from the current liquid level in the lagoon to the lowest point on the top of the dam for lagoons without spillways; and from the current liquid level in the lagoon to the bottom of the spillway for lagoons with spillways. Lagoon Name/ID Spillway(Y or N): Level(inches): Lagoon 1 Lagoon 2 Lagoon 3 Lagoon 4 Lagoon 5 L1 L2 N N 18 18 2. Check all applicable items Liquid level is within the designed structural freeboard elevations of one or more structures. Five and 30 day Plans of Action are attached. Hydraulic and agronomic balances are within acceptable ranges. X Liquid level is within the 25 year 24 hour storm elevations for one or more structures. A 30 day Plan of Action is attached. Agronomic balance is within acceptable range. Waste is to be pumped and hauled to off site locations. Bolume and PAN content of waste to be pumped and hauled is reflected in section III tables. Included within this plan is a list of the proposed sites with related facility numbers, number of acres and receiving crop information. Contact and secure approval from the DWQ prior to transfer of waste to a site not covered in the facility's CAWMP. Operation will be partially or fully depopulated. "Attach a complete schedule with corresponding animal units and dates fro depopulation *if animals are to be moved to another permitted facility, provide facility number, lagoon freeboard levels and herd population for the receiving facility 3. Earliest possible date to begin land application of waste: as conditions permit I hereby certify that I have reviewed the information listed above and included within the attached Plan of Action, and to the best of my knowledge and ability, the information is accurate and correct. Advantage Farms LLC Phone: Facility Owner/Manager (print) p Date: Facility Owner/Manager (signa r } 910-293-3434 11/13/2018 L�: 5 II. TOTAL POUNDS OF PAWSTORED WITHIN STRUCTURAL FREEBOARD AND/OR 25 YR.124 HR. STORM STORAGE ELEVATIONS IN ALL WASTE STRUCTURES FOR FACILITY 1. Structure ID: 4208 line m = 464.6 lb PAN 2 Structure ID: 4209 line m = 453.9 lb PAN 3. Structure ID: line m = lb PAN 4. Structure ID: line m = lb PAN 5. Structure ID: line m = lb PAN 6. Structure ID: line m = lb PAN n.lines 1+2+3+4+5+6= 918.5lbPAN III. TOTAL PAN BALANCE REMAINING FOR AVAILABLE CROPS DURING 30 DAY DRAW DOWN PERIOD. DO NOT LIST FIELDS TO WHICH PAN CANNOT RF APPI IFn MIRING THIS 3n r)AY PPRInn o. tract # p field # q. crop r. acres s. remaining IRR 2 PAN balance (lb/acre) t. TOTAL PAN BALANCE FOR FIELD (lbs.) column r x s u. application window' QR 1 Wheat 4.29 94.05 403.5 Sept -April QR 2 Wheat 4.31 94.05 405.4 Sept -April QR 3 Wheat 3.35 94.05 315.1 Sept -April QR 4 Wheat 5.16 95.04 490.4 Sept -April State current crop ending application date or next crop application beginning date for available receiving crops during 30 day draw down period. v. Total PAN available for all fields (sum of column t) = 1614.3 lb. PAN IV. FACILITY'S PDA OVERALL PAN BALANCE w. Total PAN to be land applied (line In from section II) = 918.5 lb. PAN PoA (30 Day) 2/21/00 �i x. Crop's remaining PAN balance (line v from section III) = 1614.3 lb. PAN y. Overall PAN balance (w - x) = -696 lb. PAN Line y must show as a deficit. If line y does not show as a deficit, list course of action here including pump and haul, depopulation, herd reduction, etc. For pump & haul and herd reduction options, recalculate new PAN based on new information. If new fields are to be included as an option for lowering lagoon level, add these, fields to the PAN balance table and recalculate the overall PAN balance. If animal waste is to be hauled to another permitted facility, provide information regarding the herd population and lagoon freeboard levels at the receiving facility. Irrigation onto existing spray fields will continue as weather and field conditions permit. Additional land is available for pumping if needed. Josh Gaddy has written an extension for application to the corn crop thru July 21 st. Remaining PAN is an estimate. PoA (30 Day) 2/21/00 ,- tti. PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES 30 DAY DRAW DOWN PERIOD I. TOTAL PAN TO BE LAND APPLIED PER WASTE STRUCTURE 1. Structure Name/Identifier (ID): 14208 2. Current liquid volume in 25 yr./24 hr. storm storage & structural freeboard a. current liquid level according to marker F7777T8.0 inches b. designed 25 yr./24 hr. storm & structural freeboard 19.5 inches c line b - line a (inches in red zone) = 1.5 inches d. top of dike surface area according to design (area at below structural freeboard elevation) 119880 ftZ e. line c/12 x line d x 7.48 gallons/ft3 112088 gallons 3. Projected volume of waste liquid produced during draw down period f. temporary storage period according to structural design 180 days g volume of waste produced according to structural design 161410.9 ft3 h. current herd # 4896 certified herd #1 4896 actual waste produced = current herd # x line g = 161411 ft' certified herd # i. volume of wash water according to structural design j. excess rainfall over evaporation according to design k. (lines h + i +j) x 7.48 x 30 days/line f= 4. Total PAN to be land applied during draw down period I. current waste analysis dated 10/25/2018 m. ((lines e + k)/1000) x line I = REPEAT SECTION I FOR EACH WASTE STRUCTURE ON SITE. (Click on the next Structure tab shown below) PoA (30 Day) 2/21/00 0 ft3 69930 ft3 288405 gallons 1.16 Ibs/1000 gal. 464.6 lbs. PAN 1� V. PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES 30 DAY DRAW DOWN PERIOD I. TOTAL PAN TO BE LAND APPLIED PER WASTE STRUCTURE 1 Structure Name/Identifier (ID): 42 99 2 Current liquid volume in 25 yr./24 hr. storm storage & structural freeboard a. current liquid level according to marker 18 Q inches b. designed 25 yr./24 hr. storm & structural freeboard 19.0 inches c. line b - line a (inches in red zone) = 1.0 inches d. top of dike surface area according to design (area at below structural freeboard elevation) 119880 ftZ e. line c/12 x line d x 7.48 gallons/ft' 74725 gallons 3. Projected volume of waste liquid produced during draw down period _ f. temporary storage period according to structural design 1-8-01 days g. volume of waste produced according to structural design F 161410.9 ft3 h. current herd # 4896 certified herd # 4896 actual waste produced = current herd # x line g = 161411 ft' certified herd # i. volume of wash' water according to structural design j. excess rainfall over evaporation according to design k. (lines h + i +j) x 7.48 x 30 days/line f= 4. Total PAN to be land applied during draw down period I current waste analysis dated 10/25/2018 m. ((lines e + k)/1000) x line I = REPEAT SECTION I FOR EACH WASTE STRUCTURE ON SITE. (Click on the next Structure tab shown.below) PoA (30 Day) 2/21 /00 �1W 69930 W 288405 gallons 1.25 Ibs/1000 gal. _ 453.9 Ibs. PAN