Loading...
HomeMy WebLinkAbout240077_Plan of Action_20181004ab1�,03S�Sz PLAN OF ACTION(Poa) FOR HIGH FREEBOARD AT ANIMAL FACILITIES Facility Number: 24-77 Facility Name: Hardwick Farms County: Columbus Certified Operator Name: David Hardwick Operator Number: 20207 1. Current liquid level(s) in inches as measured from the current liquid level in the lagoon to the lowest point on the top of the dam for lagoons without spillways; and from the current liquid level in the lagoon to the bottom of the spillway for lagoons with spillways. Lagoon Name/ID: Spillway(Y or N): Level(inches): Lagoon 1 Lagoon 2 Lagoon 3 Lagoon 4 Lagoon 5 1 2 16 14 2. Check all applicable items Liquid level is within the designed structural freeboard elevations of one or more structures. Five and 30 day Plans of Action are attached. Hydraulic and agronomic balances are within acceptable ranges. XXX Liquid level is within the 25 year 24 hour storm elevations for one or more structures. A 30 day Plan of Action is attached. Agronomic balance is within acceptable range. Waste is to be pumped and hauled to off site locations. Bolume and PAN content of waste to be pumped and hauled is reflected in section III tables. Included within this plan is a list of the proposed sites with related facility numbers, number of acres and receiving crop information. Contact and secure approval from the DWQ prior to transfer of waste to a site not covered in the facility's CAWMP. Operation will be partially or fully depopulated. *Attach a complete schedule with corresponding animal units and dates for depopulation *if animals are to be moved to another permitted facility, provide facility number, lagoon freeboard levels and herd population for the receiving facility 3. Earliest possible date to begin land application of waste: hereby certify that I have reviewed the information listed above and included within the attached Plan of Action, and to the best of my knowledge and ability, the information is accurate and correct. David Hardwick Facility Owner/Manager (print) Facility Owner/Manager (signature) Phone: Date: 10/2/2018 P II. TOTAL POUNDS OF PAN STORED WITHIN STRUCTURAL FREEBOARD AND/OR 25 YR./24 HR. STORM STORAGE ELEVATIONS IN ALL WASTE STRUCTURES FOR FACILITY 1. Structure ID: Lagoon #1 line m = 80.9 lb PAN 2. Structure ID: Lagoon #2 line m = 150.8 lb PAN 3. Structure ID: line m = lb PAN 4. Structure ID: line m = lb PAN 5. Structure ID: line m = lb PAN 6. Structure ID: line m = lb PAN n. linesl +2+3+4+5+6= 231.6 lb PAN III. TOTAL PAN BALANCE REMAINING FOR AVAILABLE CROPS DURING 30 DAY DRAW DOWN PERIOD. DO NOT LIST FIELDS TO WHICH PAN CANNOT BE APPLIED DURING THIS 3n nAv PFRInn o. tract # p. field # q. crop r. acres s remaining IRR 2 PAN balance (lb/acre) t. TOTAL PAN BALANCE FOR FIELD (lbs.) column r x s u. application window' 6908 Z1 Hybrid Bermuda 1.30 50.00 65.0 10/1-3/30 6908 Z2 Hybrid Bermuda 1.30 50.00 65.0 10/1-3/30 69081 Z3 Hybrid Bermuda 1.30 50.00 65.0 10/1-3/30 6908 Z4 Hybrid Bermuda 1.30 50.00 65.0 10/1-3/30 6908 Z5 Hybrid Bermuda 1.30 50.00 65.0 10/1-3/30 6908 Z6 Hybrid Bermuda 1.30 50.00 65.0 10/1-3/30 6908 Z7 Hybrid Bermuda 1.30 50.00 65.0 10/1-3/30 6908 Z8 Hybrid Bermuda 1.30 50.00 65.0 10/1-3/30 6908 Z9 Hybrid Bermuda 1.30 50.00 65.0 10/1-3/30 6908 Z10 Hybrid Bermuda 1.30 50.00 65.0 10/1-3/30 6908 Z11 Hybrid Bermuda 1.30 50.00 65.0 10/1-3/30 6908 Z12 Hybrid Bermuda 1 30 50.00 65.0 10/1-3/30 6908 Z13 Hybrid Bermuda 1.30 50.00 65.0 10/1-3/30 F-1 'State current crop ending application date or next crop application beginning date for available receiving crops during 30 day draw down period. v. Total PAN available for all fields (sum of column t) = 845.0 lb. PAN IV. FACILITY'S PDA OVERALL PAN BALANCE w. Total PAN to be land applied (line n from section II) = 231.6 lb. PAN x. Crop's remaining PAN balance (line v from section III) = 845.0 lb. PAN y. Overall PAN balance (w - x) _ -613 lb. PAN PoA (30 Day) 2/21/00 Line y must show as a deficit. If line y does not show as a deficit, list course of action here including pump and haul, depopulation, herd reduction, etc. For pump & haul,and herd reduction options, recalculate new PAN based on new information If new fields are to be included as an option for lowering lagoon level, add these fields to the PAN balance table and recalculate the overall PAN balance. If animal waste is to be hauled to another permitted facility, provide information regarding the herd population and lagoon freeboard levels at the receiving facility. Mr. Hardwick self reported that his lagoon was in his freeboard on 9/22/18. This is after Hurricane Florence. Several inches of rain were dumped because of this storm. Mr. Hadwick will pump as field conditions allow. This POA was created on 10/2/2018 by Sam Edwards NCDA Soil and Water Division. PoA (30 Day) 2/21/00 PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES 30 DAY DRAW DOWN PERIOD I. TOTAL PAN TO BE LAND APPLIED PER WASTE STRUCTURE 1 Structure Name/Identifier (ID): rLagoon #1 2. Current liquid volume in 25 yr./24 hr. storm storage & structural freeboard a. current liquid level according to marker 16.0 inches b. designed 25 yr./24 hr. storm & structural freeboard 19.0 inches c line b - line a (inches in red zone) = 3.0 inches d. top of dike surface area according to design (area at below structural freeboard elevation) 41612 ft2 e. line c/12 x line d x 7.48 gallons/ft3 77814 gallons 3. Projected volume of waste liquid produced during draw down period f. temporary storage period according to structural design 180 days g. volume of waste produced according to structural design 21870 ft3 h. current herd # certified herd # 600 actual waste produced = current herd # x line g = ft3 certified herd # 4 i. volume of wash water according to structural design j. excess rainfall over evaporation according to design k. (lines h + i + j) x 7.48 x 30 days/line f= 4. Total PAN to be land applied during draw down period I. current waste analysis dated 8/17/2018 m. ((lines e + k)/1000) x line I = REPEAT SECTION I FOR EACH WASTE STRUCTURE ON SITE. (Click on the next Structure tab shown below) 0 ft3 9643 ft3 12022 gallons 0.90 Ibs/1000 gal. 80.9 Ibs. PAN PoA (30 Day) 2/21/00 0 PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES 30 DAY DRAW DOWN PERIOD I. TOTAL PAN TO BE LAND APPLIED PER WASTE STRUCTURE 1. Structure Name/Identifier (ID): I Lagoon #2 2. Current liquid volume in 25 yr./24 hr. storm storage & structural freeboard a. current liquid level according to marker b. designed 25 yr./24 hr. storm & structural freeboard c. line b - line a (inches in red zone) _ d. top of dike surface area according to design (area at below structural freeboard elevation) e. line c/12 x line d x 7.48 gallons/ft3 3. Projected volume of waste liquid produced during draw down period 14.0 inches 19.5 inches 5.5 inches 43200 ft2 148104 gallons f. temporary storage period according to structural design 180 days g. volume of waste produced according to structural design 22600 ft3 h. current herd # DO - certified herd # 2700 actual waste produced = current herd # x line g = certified herd # i. volume of wash water according to structural design J. excess rainfall over evaporation according to design k. (lines h + i +j) x 7.48-x 30 days/line f= 4. Total PAN to be land applied during draw down period I. current waste analysis dated 8/17/2018 m. ((lines e + k)/1000) x line I = REPEAT SECTION I FOR EACH WASTE STRUCTURE ON SITE. (Click on the next Structure tab shown below) ft3 ft3 25200 ft3 31416 gallons 0.84 Ibs/1000 gal. 150.8 Ibs. PAN PoA (30 Day) 2/21 /00