HomeMy WebLinkAbout240077_Plan of Action_20181004ab1�,03S�Sz
PLAN OF ACTION(Poa) FOR HIGH FREEBOARD AT ANIMAL FACILITIES
Facility Number: 24-77
Facility Name: Hardwick Farms
County: Columbus
Certified Operator Name: David Hardwick Operator Number: 20207
1. Current liquid level(s) in inches as measured from the current liquid level in the lagoon to the
lowest point on the top of the dam for lagoons without spillways; and from the current liquid level
in the lagoon to the bottom of the spillway for lagoons with spillways.
Lagoon Name/ID:
Spillway(Y or N):
Level(inches):
Lagoon 1 Lagoon 2 Lagoon 3 Lagoon 4 Lagoon 5
1 2
16 14
2. Check all applicable items
Liquid level is within the designed structural freeboard elevations of one or more structures.
Five and 30 day Plans of Action are attached. Hydraulic and agronomic balances are
within acceptable ranges.
XXX Liquid level is within the 25 year 24 hour storm elevations for one or more structures. A
30 day Plan of Action is attached. Agronomic balance is within acceptable range.
Waste is to be pumped and hauled to off site locations. Bolume and PAN content of waste
to be pumped and hauled is reflected in section III tables. Included within this plan is a list
of the proposed sites with related facility numbers, number of acres and receiving crop
information. Contact and secure approval from the DWQ prior to transfer of waste to a site
not covered in the facility's CAWMP.
Operation will be partially or fully depopulated.
*Attach a complete schedule with corresponding animal units and dates for depopulation
*if animals are to be moved to another permitted facility, provide facility number, lagoon
freeboard levels and herd population for the receiving facility
3. Earliest possible date to begin land application of waste:
hereby certify that I have reviewed the information listed above and included within the
attached Plan of Action, and to the best of my knowledge and ability, the information is
accurate and correct.
David Hardwick
Facility Owner/Manager (print)
Facility Owner/Manager (signature)
Phone:
Date: 10/2/2018
P
II. TOTAL POUNDS OF PAN STORED WITHIN STRUCTURAL FREEBOARD AND/OR 25 YR./24
HR. STORM STORAGE ELEVATIONS IN ALL WASTE STRUCTURES FOR FACILITY
1.
Structure ID: Lagoon #1
line m =
80.9 lb PAN
2.
Structure ID: Lagoon #2
line m =
150.8 lb PAN
3.
Structure ID:
line m =
lb PAN
4.
Structure ID:
line m =
lb PAN
5.
Structure ID:
line m =
lb PAN
6.
Structure ID:
line m =
lb PAN
n. linesl +2+3+4+5+6= 231.6 lb PAN
III. TOTAL PAN BALANCE REMAINING FOR AVAILABLE CROPS DURING 30 DAY DRAW DOWN
PERIOD. DO NOT LIST FIELDS TO WHICH PAN CANNOT BE APPLIED DURING THIS 3n nAv PFRInn
o. tract #
p. field #
q. crop
r. acres
s remaining IRR
2 PAN balance
(lb/acre)
t. TOTAL PAN
BALANCE FOR
FIELD (lbs.)
column r x s
u. application window'
6908
Z1
Hybrid Bermuda
1.30
50.00
65.0
10/1-3/30
6908
Z2
Hybrid Bermuda
1.30
50.00
65.0
10/1-3/30
69081
Z3
Hybrid Bermuda
1.30
50.00
65.0
10/1-3/30
6908
Z4
Hybrid Bermuda
1.30
50.00
65.0
10/1-3/30
6908
Z5
Hybrid Bermuda
1.30
50.00
65.0
10/1-3/30
6908
Z6
Hybrid Bermuda
1.30
50.00
65.0
10/1-3/30
6908
Z7
Hybrid Bermuda
1.30
50.00
65.0
10/1-3/30
6908
Z8
Hybrid Bermuda
1.30
50.00
65.0
10/1-3/30
6908
Z9
Hybrid Bermuda
1.30
50.00
65.0
10/1-3/30
6908
Z10
Hybrid Bermuda
1.30
50.00
65.0
10/1-3/30
6908
Z11
Hybrid Bermuda
1.30
50.00
65.0
10/1-3/30
6908
Z12
Hybrid Bermuda
1 30
50.00
65.0
10/1-3/30
6908
Z13
Hybrid Bermuda
1.30
50.00
65.0
10/1-3/30
F-1
'State current crop ending application date or next crop application beginning date for available
receiving crops during 30 day draw down period.
v. Total PAN available for all fields (sum of column t) = 845.0 lb. PAN
IV. FACILITY'S PDA OVERALL PAN BALANCE
w. Total PAN to be land applied (line n from section II) = 231.6 lb. PAN
x. Crop's remaining PAN balance (line v from section III) = 845.0 lb. PAN
y. Overall PAN balance (w - x) _ -613 lb. PAN
PoA (30 Day) 2/21/00
Line y must show as a deficit. If line y does not show as a deficit, list course of action here including pump and
haul, depopulation, herd reduction, etc. For pump & haul,and herd reduction options, recalculate new PAN
based on new information If new fields are to be included as an option for lowering lagoon level, add these
fields to the PAN balance table and recalculate the overall PAN balance. If animal waste is to be hauled to
another permitted facility, provide information regarding the herd population and lagoon freeboard levels at the
receiving facility.
Mr. Hardwick self reported that his lagoon was in his freeboard on 9/22/18. This is after Hurricane Florence.
Several inches of rain were dumped because of this storm. Mr. Hadwick will pump as field conditions allow. This
POA was created on 10/2/2018 by Sam Edwards NCDA Soil and Water Division.
PoA (30 Day) 2/21/00
PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES
30 DAY DRAW DOWN PERIOD
I. TOTAL PAN TO BE LAND APPLIED PER WASTE STRUCTURE
1 Structure Name/Identifier (ID): rLagoon #1
2. Current liquid volume in 25 yr./24 hr. storm storage & structural freeboard
a. current liquid level according to marker 16.0 inches
b. designed 25 yr./24 hr. storm & structural freeboard 19.0 inches
c line b - line a (inches in red zone) = 3.0 inches
d. top of dike surface area according to design
(area at below structural freeboard elevation) 41612 ft2
e. line c/12 x line d x 7.48 gallons/ft3 77814 gallons
3. Projected volume of waste liquid produced during draw down period
f. temporary storage period according to structural design 180 days
g. volume of waste produced according to structural design 21870 ft3
h. current herd # certified herd # 600
actual waste produced = current herd # x line g = ft3
certified herd #
4
i. volume of wash water according to structural design
j. excess rainfall over evaporation according to design
k. (lines h + i + j) x 7.48 x 30 days/line f=
4. Total PAN to be land applied during draw down period
I. current waste analysis dated 8/17/2018
m. ((lines e + k)/1000) x line I =
REPEAT SECTION I FOR EACH WASTE STRUCTURE ON SITE.
(Click on the next Structure tab shown below)
0 ft3
9643 ft3
12022 gallons
0.90 Ibs/1000 gal.
80.9 Ibs. PAN
PoA (30 Day) 2/21/00
0
PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES
30 DAY DRAW DOWN PERIOD
I. TOTAL PAN TO BE LAND APPLIED PER WASTE STRUCTURE
1. Structure Name/Identifier (ID): I Lagoon #2
2. Current liquid volume in 25 yr./24 hr. storm storage & structural freeboard
a. current liquid level according to marker
b. designed 25 yr./24 hr. storm & structural freeboard
c. line b - line a (inches in red zone) _
d. top of dike surface area according to design
(area at below structural freeboard elevation)
e. line c/12 x line d x 7.48 gallons/ft3
3. Projected volume of waste liquid produced during draw down period
14.0 inches
19.5 inches
5.5 inches
43200 ft2
148104 gallons
f. temporary storage period according to structural design 180 days
g. volume of waste produced according to structural design 22600 ft3
h. current herd # DO - certified herd # 2700
actual waste produced = current herd # x line g =
certified herd #
i. volume of wash water according to structural design
J. excess rainfall over evaporation according to design
k. (lines h + i +j) x 7.48-x 30 days/line f=
4. Total PAN to be land applied during draw down period
I. current waste analysis dated 8/17/2018
m. ((lines e + k)/1000) x line I =
REPEAT SECTION I FOR EACH WASTE STRUCTURE ON SITE.
(Click on the next Structure tab shown below)
ft3
ft3
25200 ft3
31416 gallons
0.84 Ibs/1000 gal.
150.8 Ibs. PAN
PoA (30 Day) 2/21 /00